A novel load transfer scheme for peak load management in rural areas
Data(s) |
11/11/2011
|
---|---|
Resumo |
This paper proposes a novel peak load management scheme for rural areas. The scheme transfers certain customers onto local nonembedded generators during peak load periods to alleviate network under voltage problems. This paper develops and presents this system by way of a case study in Central Queensland, Australia. A methodology is presented for determining the best location for the nonembedded generators as well as the number of generators required to alleviate network problems. A control algorithm to transfer and reconnect customers is developed to ensure that the network voltage profile remains within specification under all plausible load conditions. Finally, simulations are presented to show the performance of the system over a typical maximum daily load profile with large stochastic load variations. |
Formato |
application/pdf |
Identificador | |
Publicador |
Institute of Electrical and Electronics Engineers |
Relação |
http://eprints.qut.edu.au/39453/3/39453a.pdf DOI:10.1109/TPWRD.2010.2082573 Wishart , Michael, Turner, Jon, Perera, Lasantha B., Ghosh, Arindam, & Ledwich, Gerard (2011) A novel load transfer scheme for peak load management in rural areas. IEEE Transactions on Power Delivery, 26(2), pp. 1203-1211. |
Direitos |
Copyright 2011 IEEE Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE. |
Fonte |
Faculty of Built Environment and Engineering; School of Engineering Systems |
Palavras-Chave | #090607 Power and Energy Systems Engineering (excl. Renewable Power) #Nonembedded generation #peak load management #peak load shaving #rural distribution planning #single-wire earth return (SWER) |
Tipo |
Journal Article |