162 resultados para Local Government Competitiveness Council (S.C.)
Resumo:
In recent years, local government infrastructure management practices have evolved from conventional land use planning to more wide ranging and integrated urban growth and infrastructure management approaches. The roles and responsibilities of local government are no longer simply to manage daily operational functions of a city and provide basic infrastructure. Local governments are now required to undertake economic planning, manage urban growth; be involved in major infrastructure planning; and even engage in achieving sustainable development objectives. The Brisbane Urban Growth model has proven initially successful to ensure timely and coordinated delivery of urban infrastructure. This model may be the first step for many local governments to move toward an integrated, sustainable and effective infrastructure management.
Resumo:
Despite documented changes to mainstream educational systems, Indigenous educational achievements are still at critically low levels across all phases of formal education. According to the Australian Bureau of Statistics (2011) Indigenous students are still less likely than non-Indigenous students to complete their final years of schooling (45% compared with 77% in 2009); tertiary level entry and outcomes are also significantly lower than non-Indigenous entry and outcomes. Although significant research has focused on the area of Indigenous education, in particular, identifying and making recommendations on how to close educational gaps between Indigenous and non-Indigenous people, these studies have failed to bring about the change needed and to engage successfully with Indigenous communities and draw on Indigenous communities’ insights for best practice. This thesis focuses on Indigenous perspectives and takes a closer look at the cultural factors that impact on tertiary education access for Indigenous young men who come from a Bundjalung community on the far north coast of northern New South Wales. To date, this community has not been the focus of serious postgraduate study. Their experiences and the values and ideas of their community have not been investigated. To do this, the study uses an Indigenous methodological framework. It draws on Indigenous Standpoint Theory to analyse data through concepts of the cultural interface and tensions (Nakata, 2007, pp. 195-217). The study’s framing also draws on decolonising methods (Porsanger, 2004; Smith, 1999) and Indigenist research methods (Rigney, 1997). Such methodologies are intended to benefit both the research participants (community members) and the researcher. In doing so, the study draws on Creswell’s (2008) methods of restorying and retelling to analyse the participants’ interviews and yarns about their lives and experiences relating to tertiary educational access. The research process occurred in multiple stages: (1) selection of research sites, (2) granting of access which was requested through consultation with local Aboriginal Elders and through the local Aboriginal Lands Council, (3) conducting of interviews with participants/ data collection, (4) analysis of data, (5) documentation of findings, (6) theory development, and (7) reporting back to the nominated Indigenous community on the progress and findings of the research. The benefits of this research are numerous. First, this study addresses an issue that has been identified from within the local Aboriginal community as an issue of high precedence, looking at the cultural factors surrounding the underrepresentation of Indigenous people accessing tertiary education. This is not only of local significance but has been identified in the literature as a local, national and international area of concern amongst Indigenous peoples (Department of Economic and Social Affairs, 2009; Herbert, 2010; King, 2011). Secondly, the study draws on local Indigenous knowledges and learning processes from within a Bundjalung community to gain inside perspectives, namely the cultural factors that are being expressed from a range of Indigenous community members – young men, community Elders and community members – and finding out what they perceive inhibit and/or promote tertiary education participation within their community. Such perspectives are rarely heard. Finally, recommendations made from this study are aimed at revealing investigative styles that may be utilised by Western institutions to improve access for Indigenous young men living in the Narlumdarlum1 region in the tertiary context.
Resumo:
This presentation put forward six propositions regarding the value and character of community wellbeing, in particular the economic contribution of social and community programs and initiatives. The six propositions are: 1. Community wellbeing is a useful umbrella concept 2. Everyone benefits from public programs 3. There is an economic as well as social cost of not responding well 4. Local government is key in fostering community wellbeing 5. Good practice involves bringing together a number of perspectives and levers, including social and cultural initiatives 6. Engaging with the community around wellbeing offers an opportunity to enhance the political process
Resumo:
Australia is a country, which has much of its legislative roots in its Commonwealth heritage. However due to its size and nature, its planning and development processes are more aligned to countries such as the United States. This paper will present an overview of the Australian urban land market, its infrastructure funding mechanisms (property taxes) and current provisions in each of Australia’s seven States and Territories that provide for developer contributions for local infrastructure (impact fees).
Resumo:
Before e-Technology’s effects on users can be accurately measured, those users must be fully engaged with the relevant systems and services. That is they must be able to function as part of the digital economy. The paper refers to this ‘user functionality’ as t-Engagement. Not all users are t-Engaged and in many instances achieving t-Engagement will require assistance from external sources. This paper identifies the current state of Australia’s regional digital economy readiness and highlights the role of Local Government Authorities (‘LGAs’) in enabling t-Engagement. The paper analyses responses to the 2012 BTA, NBN and Digital Economy Survey by LGA and other regional organizations within Australia. The paper’s particular focus is on the level of use by Local Government Authorities of federal, state and other programs designed to enable t-Engagement. The analysis confirms the role of LGAs in enabling t-Engagement and in promoting Australia’s digital economy. The paper concludes by reinforcing the need to ensure ongoing meaningful federal and State support of regional initiatives, as well as identifying issues requiring specific attention.
Resumo:
A Tale of Two Marinas: Burnett Heads and Port of Bundaberg This exhibition showcases the work of 4th Year undergraduate Landscape Architecture and Civil and Environmental Engineering students in response to issues of sustainability in Burnett Heads and the Port of Bundaberg. The Burnett Heads & Port of Bundaberg project site, just north of Bargara, is a complex mix of port facilities, urban development, established residential and service areas, coastal conservation and agriculture. The project brief was to prepare a range of strategic planning and environmental management options for future urban and infrastructure development. 4th year undergraduate Landscape Architecture and Civil and Environmental Engineering students worked over one teaching semester with guidance from QUT academics and partner organisations to produce strategic planning, environmental management planning and design options for managing future growth in the area. The project process involved three visits to the site by QUT students and staff. The first visit at the project’s commencement included a formal briefing session with project partners the Burnett Mary Regional Group, Port of Brisbane Corporation, and Queensland Department of Local Government and Planning. Formal and informal community engagement facilitated by the Burnett Heads Progress Association also allowed students to gain some understanding of local values. A second visit mid-project involved a ‘Futures Workshop’ with students and community. This enabled the students to gain the benefit of local knowledge and experience in response to their work-in-progress, and to establish priorities for project completion. It strengthened the relationship between the community and the students. A final exhibition, ‘A Tale of Two Marinas’ was held at the Burnett Progress Hall just prior to completion of the project. The student work exhibited offers a diverse number of alternative options for the future urban development, infrastructure and environmental planning that the partner organisations have used for ongoing consultation.
Resumo:
This exhibition showcases the work of Postgraduate Landscape Architecture and final year Undergraduate Civil and Environmental Engineering students in response to issues of sustainability in the Port of Bundaberg. The Port of Bundaberg project site, just north of Bargara, is a complex mix of port facilities, urban development, coastal conservation and agriculture. The project brief was to prepare a range of strategic planning and environmental management options for future urban and infrastructure development in the Port area. Postgraduate Landscape Architecture and final year Undergraduate Civil and Environmental Engineering students worked over one teaching semester with guidance from QUT academics and partner organisations to produce strategic planning, environmental management planning and design options for managing future growth in the area. Specifically, these make recommendations regarding: • Interface between Port lands and residential settlement; • Future residential/urban development; • Transport accessibility and mobility – road, rail, tramway and maritime for personal and freight movement; • Local and regional connectivity - both physical and perceptual- between urban settlements of Port of Bundaberg – Burnett Heads and the surrounding area; • Recreational and tourism development; • Public/private space mix and access; • Ecological conservation assets; • Natural and cultural heritage assets The project process involved three visits to the site by QUT students and staff. The first visit at the project’s commencement included a formal briefing session with project partners the Burnett Mary Regional Group, Port of Brisbane Corporation, and Queensland Department of Local Government and Planning. Formal and informal community engagement facilitated by the Burnett Heads Progress Association also allowed students to gain some understanding of local values. A second visit mid-project involved a ‘Futures Workshop’ with students and community. This enabled the students to gain the benefit of local knowledge and experience in response to their work-in-progress, and to establish priorities for project completion. It strengthened the relationship between the community and the students. A final exhibition, ‘Port of Bundaberg Futures' was held at the Port TAFE Campus upon the completion of the project. The student work exhibited offers a diverse number of alternative options for the future urban development, infrastructure and environmental planning that the partner organisations have used for ongoing consultation.
Resumo:
As public and private space becomes a focus for development values, contests occur between the unequal parties having a stake in the use of public space, such as central and local government, young people, communities and site developers. It is within the monitoring, recording and control procedures that young people’s use of public space is constructed as a threat to social order in need of surveillance and exclusion. This forms a major and contemporary feature in shaping thinking about urban and rural working class young people in the UK.
Resumo:
Toxic blooms of Lyngbya majuscula occur in coastal areas worldwide and have major ecological, health and economic consequences. The exact causes and combinations of factors which lead to these blooms are not clearly understood. Lyngbya experts and stakeholders are a particularly diverse group, including ecologists, scientists, state and local government representatives, community organisations, catchment industry groups and local fishermen. An integrated Bayesian Network approach was developed to better understand and model this complex environmental problem, identify knowledge gaps, prioritise future research and evaluate management options.
Resumo:
Although there is an increasing recognition of the impacts of climate change on communities, residents often resist changing their lifestyle to reduce the effects of the problem. By using a landscape architectural design medium, this paper argues that public space, when designed as an ecological system, has the capacity to create social and environmental change and to increase the quality of the human environment. At the same time, this ecological system can engage residents, enrich the local economy, and increase the social network. Through methods of design, research and case study analysis, an alternative master plan is proposed for a sustainable tourism development in Alacati, Turkey. Our master plan uses local geographical, economic and social information within a sustainable landscape architectural design scheme that addresses the key issues of ecology, employment, public space and community cohesion. A preliminary community empowerment model (CEM) is proposed to manage the designs. The designs address: the coexistence of local agricultural and sustainable energy generation; state of the art water management; and the functional and sustainable social and economic interrelationship of inhabitants, NGOs, and local government.
Resumo:
Floods are among the most devastating events that affect primarily tropical, archipelagic countries such as the Philippines. With the current predictions of climate change set to include rising sea levels, intensification of typhoon strength and a general increase in the mean annual precipitation throughout the Philippines, it has become paramount to prepare for the future so that the increased risk of floods on the country does not translate into more economic and human loss. Field work and data gathering was done within the framework of an internship at the former German Technical Cooperation (GTZ) in cooperation with the Local Government Unit of Ormoc City, Leyte, The Philippines, in order to develop a dynamic computer based flood model for the basin of the Pagsangaan River. To this end, different geo-spatial analysis tools such as PCRaster and ArcGIS, hydrological analysis packages and basic engineering techniques were assessed and implemented. The aim was to develop a dynamic flood model and use the development process to determine the required data, availability and impact on the results as case study for flood early warning systems in the Philippines. The hope is that such projects can help to reduce flood risk by including the results of worst case scenario analyses and current climate change predictions into city planning for municipal development, monitoring strategies and early warning systems. The project was developed using a 1D-2D coupled model in SOBEK (Deltares Hydrological modelling software package) and was also used as a case study to analyze and understand the influence of different factors such as land use, schematization, time step size and tidal variation on the flood characteristics. Several sources of relevant satellite data were compared, such as Digital Elevation Models (DEMs) from ASTER and SRTM data, as well as satellite rainfall data from the GIOVANNI server (NASA) and field gauge data. Different methods were used in the attempt to partially calibrate and validate the model to finally simulate and study two Climate Change scenarios based on scenario A1B predictions. It was observed that large areas currently considered not prone to floods will become low flood risk (0.1-1 m water depth). Furthermore, larger sections of the floodplains upstream of the Lilo- an’s Bridge will become moderate flood risk areas (1 - 2 m water depth). The flood hazard maps created for the development of the present project will be presented to the LGU and the model will be used to create a larger set of possible flood prone areas related to rainfall intensity by GTZ’s Local Disaster Risk Management Department and to study possible improvements to the current early warning system and monitoring of the basin section belonging to Ormoc City; recommendations about further enhancement of the geo-hydro-meteorological data to improve the model’s accuracy mainly on areas of interest will also be presented at the LGU.
Resumo:
In the space of the past decade, the technologies, business models, everyday uses and public understandings of social media have co-evolved rapidly. In the early to mid 2000s, websites like MySpace, Facebook or Twitter were garnering interest in both the press and academia as places for amateur creativity, political subversion or trivial time-wasting on the behalf of subcultures of geeks or ‘digital natives’, but such websites were not seen as legitimate, mainstream media organisations, nor were they generally understood as respectable places for professionals (other than new media professionals) to conduct business. By late 2011, online marketing company Comscore was reporting that social networking was “the most popular online activity worldwide accounting for nearly 1 in every 5 minutes spent online”, reaching 82 percent of the world’s Internet population, or 1.2 billion users (Comscore, 2011). Today, social media is firmly established as an industry sector in its own right, and is deeply entangled with and embedded in the practices and everyday lives of media professionals, celebrities and ordinary users. We might now think of it as an embedded communications infrastructure extending across culture, society and the economy – ranging from local government Facebook pages alerting us to kerbside collection, to Tumblr blogs providing humorous cultural commentary by curating animated .gifs, to Telstra Twitter accounts responding to user requests for tech help, and to Yelp reviews helping us find somewhere to grab dinner in a strange town. As well as at least appearing to be near-ubiquitous, social media is increasingly seen as highly significant by scholars researching issues as diverse as journalistic practice (Hermida, 2012), the coordination of government and community responses to natural disasters (Bruns & Burgess, 2012), and the activities of global social and political protest movements (Howard & Hussain, 2013)...
Resumo:
This research analyses the extent of damage to buildings in Brisbane, Ipswich and Grantham during the recent Eastern Australia flooding and explore the role planning and design/construction regulations played in these failures. It highlights weaknesses in the current systems and propose effective solutions to mitigate future damage and financial loss under current or future climates. 2010 and early 2011 saw major flooding throughout much of Eastern Australia. Queensland and Victoria were particularly hard hit, with insured losses in these states reaching $2.5 billion and many thousands of homes inundated. The Queensland cities of Brisbane and Ipswich were the worst affected; around two-thirds of all inundated property/buildings were in these two areas. Other local government areas to record high levels of inundation were Central Highlands and Rockhampton Regional Councils in Queensland, and Buloke, Campaspe, Central Gold Fields and Loddon in Victoria. Flash flooding was a problem in a number of Victorian councils, but the Lockyer Valley west of Ipswich suffered the most extensive damage with 19 lives lost and more than 100 homes completely destroyed. In all more than 28,000 properties were inundated in Queensland and around 2,500 buildings affected in Victoria. Of the residential properties affected in Brisbane, around 90% were in areas developed prior to the introduction of floodplain development controls, with many also suffering inundation during the 1974 floods. The project developed a predictive model for estimating flood loss and occupant displacement. This model can now be used for flood risk assessments or rapid assessment of impacts following a flood event.
Resumo:
Management of pandemic influenza relies on complex coordination of many different dimensions of the health and social care systems, emergency services, levels of national and local government, civil society, communications and media, and cultural expectations. Law is one small but important component of those arrangements, which touch on fundamental ethical debates. This review demonstrates that the Asian region is actively engaging those issues in diverse ways in light of their varied socioeconomic and cultural backgrounds, but scope remains for prioritising further research into these relationships.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.