666 resultados para Architecture project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis and value of digital evidence in an investigation has been the domain of discourse in the digital forensic community for several years. While many works have considered different approaches to model digital evidence, a comprehensive understanding of the process of merging different evidence items recovered during a forensic analysis is still a distant dream. With the advent of modern technologies, pro-active measures are integral to keeping abreast of all forms of cyber crimes and attacks. This paper motivates the need to formalize the process of analyzing digital evidence from multiple sources simultaneously. In this paper, we present the forensic integration architecture (FIA) which provides a framework for abstracting the evidence source and storage format information from digital evidence and explores the concept of integrating evidence information from multiple sources. The FIA architecture identifies evidence information from multiple sources that enables an investigator to build theories to reconstruct the past. FIA is hierarchically composed of multiple layers and adopts a technology independent approach. FIA is also open and extensible making it simple to adapt to technological changes. We present a case study using a hypothetical car theft case to demonstrate the concepts and illustrate the value it brings into the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the preliminary findings of an ongoing research project aimed at developing a technological, operational and strategic analysis of adopting BIM in AEC/FM (Architecture-Engineering-Construction/Facility Management) industry as a collaboration tool. Outcomes of the project will provide specifications and guidelines as well as establish industry standards for implementing BIM in practice. This research primarily focuses on BIM model servers as a collaboration platform, and hence the guidelines are aimed at enhancing collaboration capabilities. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perception and expectations of BIM. Layout for case studies being undertaken is presented. These findings provide a base to develop comprehensive software specifications and national guidelines for BIM with particular emphasis on BIM model servers as collaboration platforms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Semester 1 2007, a Monitoring Student Engagement study, conducted as part of the Enhancing Transition at Queensland University of Technology (ET@QUT) Project and extending earlier work in the Project by Arora (2006), aimed at mapping the processes and resources used at that time to identify, monitor and manage students in their first year who were at risk of leaving QUT (Shaw, 2007). This identified a lack of documentation of the processes and resources used and revealed an ad-hoc rather than holistic and systematic approach to monitoring student engagement. One of Shaw’s recommendations was to: “To introduce a centralised case management approach to student engagement” (p. 14). That provided the genesis for the Student Success Project that is being reported on here. The aim of the Student Success Project is to trial, evaluate and ultimately establish holistic and systematic ways of helping students who appear to be at-risk of failing or withdrawing from a unit to persist and succeed. Students are profiled as being at-risk if they are absent from more than 2 tutorials in a row without contacting their tutor or if they fail to submit their first assignment. A Project Officer makes personal contact with these students to suggest ways they can get further assistance depending on their situation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document reports on the Innovations Working Group that met at the 10th International Conference “Models in Developing Mathematics Education” from the 11-17th September 2009 in Dresden, Saxony. It briefly describes the over arching and consistent themes that emerged from the numerous papers presented. The authors and titles of each of the papers presented will be listed in Table 2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper will examine the intersection of design research and problem‐based teaching through the process and outcomes of a four year long ARC funded research project: the Emerging Futures Project. Sustainability is central to the project; in its overall content as well as in the broad aim of determining better outcomes for urban consolidation.   

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building integrated living systems (BILS), such as green roofs and living walls, could mitigate many of the challenges presented by climate change and biodiversity protection. However, few if any such systems have been constructed, and current tools for evaluating them are limited, especially under Australian subtropical conditions. BILS are difficult to assess, because living systems interact with complex, changing and site-specific social and environmental conditions. Our past research in design for eco-services has confirmed the need for better means of assessing the ecological values of BILS - let alone better models for assessing their thermal and hydrological performance. To address this problem, a research project is being developed jointly by researchers at the Central Queensland University (CQ University) and the Queensland University of Technology (QUT), along with industry collaborators. A mathematical model under development at CQ University will be applied and tested to determine its potential for predicting their complex, dynamic behaviour in different contexts. However, the paper focuses on the work at QUT. The QUT school of design is generating designs for living walls and roofs that provide a range of ecosystem goods and services, or ‘eco-services’, for a variety of micro-climates and functional contexts. The research at QUT aims to develop appropriate designs, virtual prototypes and quantitative methods for assessing the potential multiple benefits of BILS in subtropical climates. It is anticipated that the CQ University model for predicting thermal behaviour of living systems will provide a platform for the integration of ecological criteria and indicators. QUT will also explore means to predict and measure the value of eco-services provided by the systems, which is still largely uncharted territory. This research is ultimately intended to facilitate the eco-retrofitting of cities to increase natural capital and urban resource security - an essential component of sustainability. The talk will present the latest range of multifunctional, eco-productive living walls, roofs and urban space frames and their eco-services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Exercise for Health program is a telephone-delivered exercise intervention for women with breast cancer (BC) living in regional Queensland. The effect of the program is being evaluated in the context of a randomised controlled trial. Consenting, newly diagnosed BC patients, treated in one of 8 regional Queensland hospitals, were randomly allocated to telephone-based exercise counselling (EC) or usual care (UC) at 6-weeks post-surgery. EC participants received an exercise workbook and 16 calls from an exercise physiologist over 8 months. Physical activity levels (PA) (Active Australia & CHAMPS), quality-of-life (FACTB+4), upper-body function (DASH) and fatigue (FACIT-Fatigue) were assessed at baseline (4-6 weeks post-surgery), 6- and 12-months post-surgery. Preliminary analyses of available 6-month data were conducted using t-tests and repeated measures ANCOVAs. Participating women (n=143; EC n=73, UC n=70) were aged 53±9 years and 30% met PA guidelines at baseline. Up to two thirds of the women received adjuvant therapy during the first 6 months following surgery. Greater improvements (mean change+SD) occurred for the EC vs UC group in weekly sessions of walking (1.83±4.3 vs -0.5±5.5, p=0.029) moderate-vigorous PA (5.0±6.5 vs -1.1±6.1, p=0.005) and strength training (1.9±2.9 vs -0.5±4.2 p<0.001), and in upper-body function, reflected by lower log-transformed disability scores (-0.34±0.44 vs -0.17±0.28, p=0.038). More EC than UC participants met PA guidelines at 6 months (46.3% vs 32.7%). Preliminary findings from this ongoing trial suggest that the telephone is a feasible and effective medium for delivering exercise counselling to newly diagnosed BC patients living in regional areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Campus Kindergarten is a community-based centre for early childhood education and care located on campus at the University of Queensland (UQ) in Brisbane, Australia. Being located within this diverse community has presented many opportunities for Campus Kindergarten. It is creating and embracing possibilities that has formed the basis for ongoing projects for children and teachers involving research and investigation. In 2002 Campus Kindergarten embarked on a collaborative project with the Art Museum bringing together these two departments within the university community.