613 resultados para institutional change
Resumo:
Developing an effective impact evaluation framework, managing and conducting rigorous impact evaluations, and developing a strong research and evaluation culture within development communication organisations presents many challenges. This is especially so when both the community and organisational context is continually changing and the outcomes of programs are complex and difficult to clearly identify.----- This paper presents a case study from a research project being conducted from 2007-2010 that aims to address these challenges and issues, entitled Assessing Communication for Social Change: A New Agenda in Impact Assessment. Building on previous development communication projects which used ethnographic action research, this project is developing, trailing and rigorously evaluating a participatory impact assessment methodology for assessing the social change impacts of community radio programs in Nepal. This project is a collaboration between Equal Access – Nepal (EAN), Equal Access – International, local stakeholders and listeners, a network of trained community researchers, and a research team from two Australian universities. A key element of the project is the establishment of an organisational culture within EAN that values and supports the impact assessment process being developed, which is based on continuous action learning and improvement. The paper describes the situation related to monitoring and evaluation (M&E) and impact assessment before the project began, in which EAN was often reliant on time-bound studies and ‘success stories’ derived from listener letters and feedback. We then outline the various strategies used in an effort to develop stronger and more effective impact assessment and M&E systems, and the gradual changes that have occurred to date. These changes include a greater understanding of the value of adopting a participatory, holistic, evidence-based approach to impact assessment. We also critically review the many challenges experienced in this process, including:----- • Tension between the pressure from donors to ‘prove’ impacts and the adoption of a bottom-up, participatory approach based on ‘improving’ programs in ways that meet community needs and aspirations.----- • Resistance from the content teams to changing their existing M&E practices and to the perceived complexity of the approach.----- • Lack of meaningful connection between the M&E and content teams.----- • Human resource problems and lack of capacity in analysing qualitative data and reporting results.----- • The contextual challenges, including extreme poverty, wide cultural and linguistic diversity, poor transport and communications infrastructure, and political instability.----- • A general lack of acceptance of the importance of evaluation within Nepal due to accepting everything as fate or ‘natural’ rather than requiring investigation into a problem.
Resumo:
‘Adolescence’ has become increasingly recognised as a nebulous concept. Previous conceptualisations of adolescence have adopted a ‘deficit’ view, regarding teenagers as ‘unfinished’ adults. The deficit view of adolescence is highly problematic in an era where adulthood itself is difficult to define. The terms ‘kidult’ or ‘adultescent’ have emerged to describe adult-age people whose interests and priorities match those of their teenage counterparts. Rather than relying on ‘lock-step’ models of physical, cognitive and social growth put forward by developmental psychology, adolescence can be more usefully defined by looking at the common experiences of people in their teenage years. Common experiences arise at an institutional level; for example, all adolescents are treated as the same by legal and education systems. The transition from primary to secondary schooling is a milestone for all children, exposing them to a new type of educational environment. Shared experiences also arise from generational factors. Today’s adolescents belong to the millennial generation, characterised by technological competence, global perspectives, high susceptibility to media influence, individualisation and rapid interactions. This generation focuses on teamwork, achievement, modesty and good conduct, and has great potential for significant collective accomplishments. These generational factors challenge educators to provide relevant learning experiences for today’s students. Many classrooms still utilise textbook-based pedagogy more suited to previous generations, resulting in disengagement among millennial students. Curriculum content must also be tailored to generational needs. The rapid pace of change, as well as the fluidity of identity created by dissolving geographical and vocational boundaries, mean that the millennial generation will need more than a fixed set of skills and knowledge to enter adulthood. Teachers must enable their students to think like ‘expert novices’, adept at assimilating new concepts in depth and prepared to engage in lifelong learning.
Resumo:
There is a growing literature (Arthur, Inkson, & Pringle, 1999; Collin & Young, 2000; Hall & Associates, 1996; Peiperl, Arthur,& Anand, 2002) about the changing workplace and the consequent changes to our understanding of the place of career in individuals’ lives (Richardson, 1996, 2000) - “Careers are becoming more varied and more difficult to manage for both individuals and organisations” (Arnold et al, 2005, p. 523). This chapter will present the background to the changes in the world of work and the changes which inevitably impact individuals’ careers. It will then focus on the close relationship between career development and lifelong learning and the importance of ongoing professional learning for individuals to maintain employability in a changing work world.
Resumo:
Objective: To examine the impact on dental utilisation following the introduction of a participating provider scheme (Regional and Rural Oral Health Program {RROHP)). In this model dentists receive higher third party payments from a private health insurance fund for delivering an agreed range of preventive and diagnostic benefits at no out-ofpocket cost to insured patients. Data source/Study setting: Hospitals Contribution Fund of Australia (HCF) dental claims for all members resident in New South Wales over the six financial years from l99811999 to 200312004. Study design: This cohort study involves before and after analyses of dental claims experience over a six year period for approximately 81,000 individuals in the intervention group (HCF members resident in regional and rural New South Wales, Australia) and 267,000 in the control group (HCF members resident in the Sydney area). Only claims for individuals who were members of HCF at 31 December 1997 were included. The analysis groups claims into the three years prior to the establishment of the RROHP and the three years subsequent to implementation. Data collection/Extraction methods: The analysis is based on all claims submitted by users of services for visits between 1 July 1988 and 30 June 2004. In these data approximately 1,000,000 services were provided to the intervention group and approximately 4,900,000 in the control group. Principal findings: Using Statistical Process Control (SPC) charts, special cause variation was identified in total utilisation rate of private dental services in the intervention group post implementation. No such variation was present in the control group. On average in the three years after implementation of the program the utilisation rate of dental services by regional and rural residents of New South Wales who where members of HCF grew by 12.6%, over eight times the growth rate of 1.5% observed in the control group (HCF members who were Sydney residents). The differences were even more pronounced in the areas of service that were the focus of the program: diagnostic and preventive services. Conclusion: The implementation of a benefit design change, a participating provider scheme, that involved the removal of CO-payments on a defined range of preventive and diagnostic dental services combined with the establishment and promotion of a network of dentists, appears to have had a marked impact on HCF members' utilisation of dental services in regional and rural New South Wales, Australia.
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
A complete change of career forces a seismic shift in every aspect of your life. From day one, you have to face the loss of long held beliefs, behaviours, the known world of self, and security. We came from professions that themselves are poles apart, and many of the challenges we faced entering the profession were the same: juggling full-time work, part time study, and family commitmemts, taking a pay cut, and loss of social life. But over a short period of time we both transitioned to our new profession successfully. so what make our successful transition possible?
Resumo:
Research indicates, one of the last available ‘mechanisms’ left for organisations to improve their competitive position within the construction industry is by considering its people (culture) along with its technology (Schein E. H. 1997). In other words, if one wants to make construction industry organisations, groups and project teams more efficient and effective, then one must better understand the role that culture plays within them.
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
Fair Work Australia is to provide the institutional framework for the Australian industrial relations system from January 2010. Its creation provides the opportunity to improve minimum labour standards’ enforcement in Australia. However, the experience of the past must be appreciated and traditional assumptions about the operation of the Australian enforcement system discarded if the new institution is to be effective in its role. This paper focuses on the role of unions in enforcement as well as institutional location issues to expose a number of central enforcement problems that those seeking to establish new systems and processes should consider. A number of recommendations in respect of the structure of Fair Work Australia and the continuing role of unions are suggested.
Resumo:
Reconfiguration of corporate structures and the retailer-supplier interface in the retail industry have restructured product markets and supply chains, as well as supermarket employment, over the past decade or so (Baret, Lehndorff & Sparks 2000; du Gay 1996). Various studies have examined the consequent changes in labour usage practices within supermarkets or superstores (Baret et al. 2000; Marchington 1995; Penn & Wirth 1993; Sparks 1992; Dawson, Findlay & Sparks 1987, 1986). Commonly, this literature explores the interplay between shifts in the structure of the labour market, broader societal trends and retailers’ employment strategies. One study found that domestic and gender dimensions, accompanied by industrial relations regimes, exert considerable influence on patterns of labour usage (Baret et al. 2000). However, while the types of labour usage and the drivers of changes to labour usage patterns have attracted significant academic attention, research has largely overlooked the ways in which the nature of supermarket work has evolved as a result of changing technology, which effectively bolsters managerial prerogative, and which has affected the skill levels of workers in the industry (Marchington 1995).
Resumo:
Engineering assets such as roads, rail, bridges and other forms of public works are vital to the effective functioning of societies {Herder, 2006 #128}. Proficient provision of this physical infrastructure is therefore one of the key activities of government {Lædre, 2006 #123}. In order to ensure engineering assets are procured and maintained on behalf of citizens, government needs to devise the appropriate policy and institutional architecture for this purpose. The changing institutional arrangements around the procurement of engineering assets are the focus of this paper. The paper describes and analyses the transition to new, more collaborative forms of procurement arrangements which are becoming increasingly prevalent in Australia and other OECD countries. Such fundamental shifts from competitive to more collaborative approaches to project governance can be viewed as a major transition in procurement system arrangements. In many ways such changes mirror the shift from New Public Management, with its emphasis on the use of market mechanisms to achieve efficiencies {Hood, 1991 #166}, towards more collaborative approaches to service delivery, such as those under network governance arrangements {Keast, 2007 #925}. However, just as traditional forms of procurement in a market context resulted in unexpected outcomes for industry, such as a fragmented industry afflicted by chronic litigation {Dubois, 2002 #9}, the change to more collaborative forms of procurement is unlikely to be a panacea to the problems of procurement, and may well also have unintended consequences. This paper argues that perspectives from complex adaptive systems (CAS) theory can contribute to the theory and practice of managing system transitions. In particular the concept of emergence provides a key theoretical construct to understand the aggregate effect that individual project governance arrangements can have upon the structure of specific industries, which in turn impact individual projects. Emergence is understood here as the macro structure that emerges out of the interaction of agents in the system {Holland, 1998 #100; Tang, 2006 #51}.
Resumo:
In dynamic environments, firms seek to build capabilities which will permit them to become innovation and change ready. Programs offered by intermediaries, while varying greatly in content and format, are designed to support those firms wishing to enhance their competitiveness. Firms which participate in intermediary programs have displayed their willingness to overcome deficiencies or barriers to competitiveness through acquiring knowledge which is external to the firm. This paper reports on interviews with 24 firms who were involved in a MAP or TAP program offered by QMI Solutions. The findings of the research suggest that knowledge intermediaries serve to disrupt organisational paths and in so doing establish mechanisms for ongoing learning and change. They do this first by disrupting the firm with a positive learning experience and also by establishing processes for developing new relationships and access to knowledge which are critical for learning and change. It is the experience of learning through knowledge exchange which can trigger the pursuit of new paths and it is the processes involving new relations and knowledge processing that provides the micro-foundations for ongoing learning and change. This suggests that the role of intermediaries goes well beyond merely knowledge transfer to include longer term effects on the capability of organisations to innovate, which is critical to economic competitiveness and the survival rate of firms.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
Measuring social and environmental metrics of property is necessary for meaningful triple bottom line (TBL) assessments. This paper demonstrates how relevant indicators derived from environmental rating systems provide for reasonably straightforward collations of performance scores that support adjustments based on a sliding scale. It also highlights the absence of a corresponding consensus of important social metrics representing the third leg of the TBL tripod. Assessing TBL may be unavoidably imprecise, but if valuers and managers continue to ignore TBL concerns, their assessments may soon be less relevant given the emerging institutional milieu informing and reflecting business practices and society expectations.