585 resultados para cost estimation
Resumo:
The firm is faced with a decision concerning the nature of intra-organizational exchange relationships with internal human resources and the nature or inter-organizational exchange relationships with market firms. In both situations, the firm can develop an exchange that ranges from a discrete exchange to a relational exchange. Transaction Cost Economics (TCE) and the Resource Dependency View (RDV) represent alternative efficiency-based explanations fo the nature of the exchange relationship. The aim of the paper is to test these two theories in respect of air conditioning maintenance in retail centres. Multiple sources of information are genereated from case studies of Australian retail centres to test these theories in respoect of internalized operations management (concerning strategic aspects of air conditioning maintenance) and externalized planned routine air conditioning maintenance. The analysis of the data centres on pattern matching. It is concluded that the data supports TCE - on the basis of a development in TCE's contractual schema. Further research is suggested towards taking a pluralistic stance and developing a combined efficiency and power hypothesis - upon which Williamson has speculated. For practice, the conclusions also offer a timely cautionary note concerning the adoption of one approach in all exchange relationships.
Resumo:
For robots to operate in human environments they must be able to make their own maps because it is unrealistic to expect a user to enter a map into the robot’s memory; existing floorplans are often incorrect; and human environments tend to change. Traditionally robots have used sonar, infra-red or laser range finders to perform the mapping task. Digital cameras have become very cheap in recent years and they have opened up new possibilities as a sensor for robot perception. Any robot that must interact with humans can reasonably be expected to have a camera for tasks such as face recognition, so it makes sense to also use the camera for navigation. Cameras have advantages over other sensors such as colour information (not available with any other sensor), better immunity to noise (compared to sonar), and not being restricted to operating in a plane (like laser range finders). However, there are disadvantages too, with the principal one being the effect of perspective. This research investigated ways to use a single colour camera as a range sensor to guide an autonomous robot and allow it to build a map of its environment, a process referred to as Simultaneous Localization and Mapping (SLAM). An experimental system was built using a robot controlled via a wireless network connection. Using the on-board camera as the only sensor, the robot successfully explored and mapped indoor office environments. The quality of the resulting maps is comparable to those that have been reported in the literature for sonar or infra-red sensors. Although the maps are not as accurate as ones created with a laser range finder, the solution using a camera is significantly cheaper and is more appropriate for toys and early domestic robots.
Resumo:
CFO and I/Q mismatch could cause significant performance degradation to OFDM systems. Their estimation and compensation are generally difficult as they are entangled in the received signal. In this paper, we propose some low-complexity estimation and compensation schemes in the receiver, which are robust to various CFO and I/Q mismatch values although the performance is slightly degraded for very small CFO. These schemes consist of three steps: forming a cosine estimator free of I/Q mismatch interference, estimating I/Q mismatch using the estimated cosine value, and forming a sine estimator using samples after I/Q mismatch compensation. These estimators are based on the perception that an estimate of cosine serves much better as the basis for I/Q mismatch estimation than the estimate of CFO derived from the cosine function. Simulation results show that the proposed schemes can improve system performance significantly, and they are robust to CFO and I/Q mismatch.
Resumo:
The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.
Resumo:
This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.
Resumo:
Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.
Resumo:
n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented
Resumo:
There is evidence that many heating, ventilating & air conditioning (HVAC) systems, installed in larger buildings, have more capacity than is ever required to keep the occupants comfortable. This paper explores the reasons why this can occur, by examining a typical brief/design/documentation process. Over-sized HVAC systems cost more to install and operate and may not be able to control thermal comfort as well as a “right-sized” system. These impacts are evaluated, where data exists. Finally, some suggestions are developed to minimise both the extent of, and the negative impacts of, HVAC system over-sizing, for example: • Challenge “rules of thumb” and/or brief requirements which may be out of date. • Conduct an accurate load estimate, using AIRAH design data, specific to project location, and then resist the temptation to apply “safety factors • Use a load estimation program that accounts for thermal storage and diversification of peak loads for each zone and air handling system. • Select chiller sizes and staged or variable speed pumps and fans to ensure good part load performance. • Allow for unknown future tenancies by designing flexibility into the system, not by over-sizing. For example, generous sizing of distribution pipework and ductwork will allow available capacity to be redistributed. • Provide an auxiliary tenant condenser water loop to handle high load areas. • Consider using an Integrated Design Process, build an integrated load and energy use simulation model and test different operational scenarios • Use comprehensive Life Cycle Cost analysis for selection of the most optimal design solutions. This paper is an interim report on the findings of CRC-CI project 2002-051-B, Right-Sizing HVAC Systems, which is due for completion in January 2006.
Resumo:
Routine postsurgery assessment of primary total hip arthroplasty (THA) is recommended in many countries. Whether the benefits of this activity are justified by the costs is not known. We used a decision-analytic Markov model to compare the costs and health outcomes of 3 different follow-up strategies after primary THA. If there is no routine follow-up of patients for 7 years after primary THA, there would be cost savings between AU$6.5 and $11.9 million and gains of between 1.8 and 8.8 quality-adjusted life years. Policy makers should investigate less resource-intensive alternatives to common routine postsurgical assessment.
Resumo:
The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.