785 resultados para RISK INDICATORS
Resumo:
Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.
Resumo:
A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.
Resumo:
Background: Injury is the leading cause of mortality for young people in Australia (AIHW, 2008). Adolescent injury mortality is consistently associated with risk taking behaviour, including transport and interpersonal violence (AIHW, 2003), which often occurs in the context of alcohol and other substance use. A rapid increase in risk taking and injury through early to late adolescence highlights the need for effective school based interventions. Aim: The aim of the current research was to examine the relationship between school connectedness and adolescent risk and injury, in order to inform effective prevention approaches. School connectedness, or students’ feelings of belongingness to school, has been shown to be a critical protective factor in adolescence which can be targeted effectively through teacher interventions. Despite evidence linking low school connectedness with increased health risk behaviour, including substance use and violence, research has not yet addressed possible links between connectedness and a broader range of risk taking behaviours (e.g. transport risks) or injury. Method: This study involved background data collection to inform the development of an intervention. A total of 595 Year 9 students (aged 13-14 years) from 5 Southeast Queensland high schools completed questionnaires that included measures of school connectedness, risk taking behaviour, alcohol and other substance use, and injuries. Results: Increased school connectedness was found to be associated with fewer transport risk behaviours and with decreased alcohol and other substance use for both males and females. Similarly, increased school connectedness was associated with fewer passenger and motorcycle injuries for male participants. Both males and females with increased school connectedness reported fewer alcohol related injuries. Implications: These results indicate that school connectedness appears to have protective effects for early adolescence. These findings may also hold for older adolescents and indicate that it may be an important factor to target in school based risk and injury prevention programs. A school connectedness intervention is currently being designed, focusing on teacher professional development. The intervention will be implemented in conjunction with a curriculum based injury prevention program for Year 9 students and will be evaluated through a large scale cluster randomised trial involving 26 schools.
Resumo:
Aims: Changing behaviour to reduce stroke risk is a difficult prospect made particularly complex because of psychological factors. This study examined predictors of intentions and behaviours to reduce stroke risk in a sample of at-risk individuals, seeking to find how knowledge and health beliefs influenced both intention and actual behaviour to reduce stroke risk. Methods: A repeated measures design was used to assess behavioural intentions at time 1 (T1) and subsequent behaviour (T2). One hundred and twenty six respondents completed an online survey at T1, and behavioural follow-up data were collected from approximately 70 participants 1 month later. Predictors were stroke knowledge, demographic variables, and beliefs about stroke that were derived from an expanded health belief model. Dependent measures were: exercise and weight loss, and intention to engage in these behaviours to reduce stroke risk. Findings: Multiple hierarchical regression analyses showed that, for exercise and weight loss respectively, different health beliefs predicted intention to control stroke risk. The most important exercise-related health beliefs were benefits, susceptibility, and self-efficacy; for weight loss, the most important beliefs were barriers, and to a lesser degree, susceptibility and subjective norm. Conclusions: Health beliefs may play an important role in stroke prevention, particularly beliefs about susceptibility because these emerged for both behaviours. Stroke education and prevention programmes that selectively target the health beliefs relevant to specific behaviours may prove most efficacious.
Resumo:
Introduction: Work engagement is a recent application of positive psychology and refers to a positive, fulfilling, work-related state of mind characterized by vigor, dedication and absorption. Despite theoretical assumptions, there is little published research on work engagement, due primarily to its recent emergence as a psychological construct. Furthermore, examining work engagement among high-stress occupations, such as police, is useful because police officers are generally characterized as having a high level of work engagement. Previous research has identified job resources (e.g. social support) as antecedents of work engagement. However detailed evaluation of job demands as an antecedent of work engagement within high-stress occupations has been scarce. Thus our second aim was to test job demands (i.e. monitoring demands and problem-solving demands) and job resources (i.e. time control, method control, supervisory support, colleague support, and friend and family support) as antecedents of work engagement among police officers. Method: Data were collected via a self-report online survey from one Australian state police service (n = 1,419). Due to the high number of hypothesized antecedent variables, hierarchical multiple regression analysis was employed rather than structural equation modelling. Results: Work engagement reported by police officers was high. Female officers had significantly higher levels of work engagement than male officers, while officers at mid-level ranks (sergeant) reported the lowest levels of work engagement. Job resources (method control, supervisor support and colleague support) were significant antecedents of three dimensions of work engagement. Only monitoring demands were significant antecedent of the absorption. Conclusion: Having healthy and engaged police officers is important for community security and economic growth. This study identified some common factors which influence work engagement experienced by police officers. However, we also note that excessive work engagement can yield negative outcomes such as psychological distress.
Resumo:
The engagement behaviour of 1,524 student-enrolments (“students”) in five first year units was monitored and 608 (39.9%) were classified as “at risk” using the criterion of not submitting or failing their first assignment. Of these, 327 (53.8%) were successfully contacted (i.e., spoken to by phone) and provided with advice and/or referral to learning and personal support services while the remaining 281 (46.2%) could not be contacted. Nine hundred and sixteen students (60.1%) were classified as “not at risk.” Overall, the at risk group who were contacted achieved significantly higher end-of-semester final grades than, and persisted (completed the unit) at more than twice the rate of, the at risk group who were not contacted. There were variations among the units which were explained by the timing of the first assignment, specific teaching-learning processes and the structure of the curriculum. Implications for curriculum design and supporting first year students within a personal, social and academic framework are discussed.
Resumo:
The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.
Resumo:
In Semester 1 2007, a Monitoring Student Engagement study, conducted as part of the Enhancing Transition at Queensland University of Technology (ET@QUT) Project and extending earlier work in the Project by Arora (2006), aimed at mapping the processes and resources used at that time to identify, monitor and manage students in their first year who were at risk of leaving QUT (Shaw, 2007). This identified a lack of documentation of the processes and resources used and revealed an ad-hoc rather than holistic and systematic approach to monitoring student engagement. One of Shaw’s recommendations was to: “To introduce a centralised case management approach to student engagement” (p. 14). That provided the genesis for the Student Success Project that is being reported on here. The aim of the Student Success Project is to trial, evaluate and ultimately establish holistic and systematic ways of helping students who appear to be at-risk of failing or withdrawing from a unit to persist and succeed. Students are profiled as being at-risk if they are absent from more than 2 tutorials in a row without contacting their tutor or if they fail to submit their first assignment. A Project Officer makes personal contact with these students to suggest ways they can get further assistance depending on their situation.
Resumo:
Although full-term pregnancies reduce the risk of ovarian cancer, it has not been conclusively established whether incomplete pregnancies also influence risk. We investigated the relationship between a history of incomplete pregnancy and incident epithelial ovarian cancer among over 4,500 women who participated in two large Australian population-based case-control studies in 1990-1993 and 2002-2005. They provided responses to detailed questions about their reproductive histories and other personal factors. Summary odds ratios (OR) and confidence intervals (CI) derived from each study using the same covariates were aggregated. We found no significant associations between the number of incomplete pregnancies and ovarian cancer, for parous (OR = 0.98, 95% CI: 0.89, 1.08) or nulliparous (OR = 1.06, 95% CI: 0.75, 1.48) women, nor for the number of spontaneous or induced abortions and ovarian cancer for parous women (OR = 0.95, 95% CI 0.82, 1.09; OR = 1.08, 95% CI: 0.86, 1.36) or nulliparous women (OR = 1.2, 95% CI: 0.6, 2.4; OR = 0.8, 95% CI: 0.47, 1.38), respectively. A systematic review of 37 previous studies of the topic confirmed our findings that a history of incomplete pregnancy does not influence a woman’s risk of epithelial ovarian cancer.
Resumo:
This paper aimed to explore the proportion associated with the perceived importance and the actual use of performance indicators from manufacturing and non manufacturing industries. The sample was 86 small and medium sized-organizations in Thailand. The perceived importance and the actual use of financial and non financial indicators were found to be significantly related among manufacturing and non manufacturing industries. KPI 3, 9, and 12 (i.e. sales and sales growth; quality of products and /or services; and process time) were perceived the most importance among manufacturing managers (85.3%, 79.4% and 76.5% respectively). While KPI 6, 9, and 12 (i.e. customer satisfaction, quality of products and /or services; and process time) were perceived the most importance among non manufacturing managers (84.8%, 93.5%, and 84.8% respectively). Interestingly, the most used KPIs for manufacturing were sales and sales growth (64.7%); profit margins (61.8%); and customer satisfaction (84.8) while non manufacturing used quality products/services (60.9%); sales and sales growth (54.3%) and employee development (54.3%) respectively. Limitation and implication were also discussed.
Resumo:
This research is aimed at addressing problems in the field of asset management relating to risk analysis and decision making based on data from a Supervisory Control and Data Acquisition (SCADA) system. It is apparent that determining risk likelihood in risk analysis is difficult, especially when historical information is unreliable. This relates to a problem in SCADA data analysis because of nested data. A further problem is in providing beneficial information from a SCADA system to a managerial level information system (e.g. Enterprise Resource Planning/ERP). A Hierarchical Model is developed to address the problems. The model is composed of three different Analyses: Hierarchical Analysis, Failure Mode and Effect Analysis, and Interdependence Analysis. The significant contributions from the model include: (a) a new risk analysis model, namely an Interdependence Risk Analysis Model which does not rely on the existence of historical information because it utilises Interdependence Relationships to determine the risk likelihood, (b) improvement of the SCADA data analysis problem by addressing the nested data problem through the Hierarchical Analysis, and (c) presentation of a framework to provide beneficial information from SCADA systems to ERP systems. The case study of a Water Treatment Plant is utilised for model validation.
Resumo:
PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.
Resumo:
Illegal pedestrian behaviour is common and is reported as a factor in many pedestrian crashes. Since walking is being promoted for its health and environmental benefits, minimisation of its associated risks is of interest. The risk associated with illegal road crossing is unclear, and better information would assist in setting a rationale for enforcement and priorities for public education. An observation survey of pedestrian behaviour was conducted at signalised intersections in the Brisbane CBD (Queensland, Australia) on typical workdays, using behavioural categories that were identifiable in police crash reports. The survey confirmed high levels of crossing against the lights, or close enough to the lights that they should legally have been used. Measures of exposure for crossing legally, against the lights, and close to the lights were generated by weighting the observation data. Relative risk ratios were calculated for these categories using crash data from the observation sites and adjacent midblocks. Crossing against the lights and crossing close to the lights both exhibited a crash risk per crossing event approximately eight times that of legal crossing at signalised intersections. The implications of these results for enforcement and education are discussed, along with the limitations of the study.