837 resultados para Queensland Road Construction
Resumo:
The two-year trial of the Queensland minimum passing distance (MPD) road rule began on 7 April 2014. The rule requires motor vehicles to provide cyclists a minimum lateral passing distance of one metre when overtaking cyclists in a speed zone of 60 km/h or less, and 1.5 metres when the speed limit is greater than 60 km/h. This document summarises the evaluation of the effectiveness of the new rule in terms of its: 1. practical implementation; 2. impact on road users’ attitudes and perceptions; and 3. road safety benefits. The Centre for Accident Research and Road Safety – Queensland (CARRS-Q) developed the evaluation framework (Haworth, Schramm, Kiata-Holland, Vallmuur, Watson & Debnath; 2014) for the Queensland Department of Transport and Main Roads (TMR) and was later commissioned to undertake the evaluation. The evaluation included the following components: • Review of correspondence received by TMR; • Interviews and focus groups with Queensland Police Service (QPS) officers; • Road user survey; • Observational study; and • Crash, injury and infringement data analysis.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.