809 resultados para Modifed Super-Time-Stepping
Resumo:
Access All was performance produced following a three-month mentorship in web-based performance that I was commissioned to conduct for the performance company Igneous. This live, triple-site performance event for three performers in three remote venues was specifically designed for presentation at Access Grid Nodes - conference rooms located around the globe equipped with a high end, open source computer teleconferencing technology that allowed multiple nodes to cross-connect with each other. Whilst each room was setup somewhat differently they all deployed the same basic infrastructre of multiple projectors, cameras, and sound as well as a reconfigurable floorspace. At that time these relatively formal setups imposed a clear series of limitations in terms of software capabilities and basic infrastructure and so there was much interest in understanding how far its capabilities might be pushed.----- Numerous performance experiments were undertaken between three Access Grid nodes in QUT Brisbane, VISLAB Sydney and Manchester Supercomputing Centre, England, culminating in the public performance staged simultaneously between the sites with local audiences at each venue and others online. Access All was devised in collaboration with interdisciplinary performance company Bonemap, Kelli Dipple (Interarts curator, Tate Modern London) and Mike Stubbs British curator and Director of FACT (Liverpool).----- This period of research and development was instigated and shaped by a public lecture I had earlier delivered in Sydney for the ‘Global Access Grid Network, Super Computing Global Conference’ entitled 'Performance Practice across Electronic Networks'. The findings of this work went on to inform numerous future networked and performative works produced from 2002 onwards.
Resumo:
A prospective, consecutive series of 106 patients receiving endoscopic anterior scoliosis correction. The aim was to analyse changes in radiographic parameters and rib hump in the two years following surgery. Endoscopic anterior scoliosis correction is a level sparing approach, therefore it is important to assess the amount of decompensation which occurs after surgery. All patients received a single anterior rod and vertebral body screws using a standard compression technique. Cleared disc spaces were packed with either mulched femoral head allograft or rib head/iliac crest autograft. Radiographic parameters (major, instrumented, minor Cobb, T5-T12 kyphosis) and rib hump were measured at 2,6,12 and 24 months after surgery. Paired t-tests and Wilcoxon signed ranks tests were used to assess the statistical significant of changes between adjacent time intervals.----- Results: Mean loss of major curve correction from 2 to 24 months after surgery was 4 degrees. Mean loss of rib hump correction was 1.4 degrees. Mean sagittal kyphosis increased from 27 degrees at 2 months to 30.6 degrees at 24 months. Rod fractures and screw-related complications resulted in several degrees less correction than patients without complications, but overall there was no clinically significant decompensation following complications. The study concluded that there are small changes in deformity measures after endoscopic anterior scoliosis surgery, which are statistically significant but not clinically significant.
Resumo:
Background: Noise is a significant barrier to sleep for acute care hospital patients, and sleep has been shown to be therapeutic for health, healing and recovery. Scheduled quiet time interventions to promote inpatient rest and sleep have been successfully trialled in critical care but not in acute care settings. Objectives: The study aim was to evaluate as cheduled quiet time intervention in an acute care setting. The study measured the effect of a scheduled quiet time on noise levels, inpatients’ rest and sleep behaviour, and wellbeing. The study also examined the impact of the intervention on patients’, visitors’ and health professionals’ satisfaction, and organisational functioning. Design: The study was a multi-centred non-randomised parallel group trial. Settings: The research was conducted in the acute orthopaedic wards of two major urban public hospitals in Brisbane, Australia. Participants: All patientsadmitted to the two wards in the5-month period of the study were invited to participate, withafinalsample of 299 participants recruited. This sample produced an effect size of 0.89 for an increase in the number of patients asleep during the quiet time. Methods: Demographic data were collected to enable comparison between groups. Data for noise level, sleep status, sleepiness and well being were collected using previously validated instruments: a Castle Model 824 digital sound level indicator; a three point sleep status scale; the Epworth Sleepiness Scale; and the SF12 V2 questionnaire. The staff, patient and visitor surveys on the experimental ward were adapted from published instruments. Results: Significant differences were found between the two groups in mean decibel level and numbers of patients awake and asleep. The difference in mean measured noise levels between the two environments corresponded to a ‘perceived’ difference of 2 to 1. There were significant correlations between average decibel level and number of patients awake and asleep in the experimental group, and between average decibel level and number of patients awake in the control group. Overall, patients, visitors and health professionals were satisfied with the quiet time intervention. Conclusions: The findings show that a quiet time intervention on an acute care hospital ward can affect noise level and patient sleep/wake patterns during the intervention period. The overall strongly positive response from surveys suggests that scheduled quiet time would be a positively perceived intervention with therapeutic benefit.
Resumo:
This paper proposes a new approach for delay-dependent robust H-infinity stability analysis and control synthesis of uncertain systems with time-varying delay. The key features of the approach include the introduction of a new Lyapunov–Krasovskii functional, the construction of an augmented matrix with uncorrelated terms, and the employment of a tighter bounding technique. As a result, significant performance improvement is achieved in system analysis and synthesis without using either free weighting matrices or model transformation. Examples are given to demonstrate the effectiveness of the proposed approach.
Resumo:
This paper uses data from a large national project on student-working to examine problems and challenges for school students working in part-time jobs. While literature has identified some potential problems and challenges, and some potential difficulties can be extrapolated from the nature of a young teenage workforce and the nature of the workplaces, these were largely absent in the two companies researched because the companies already had policies in place that addressed the potential problems. Some suggestions are made about how problems and challenges could be avoided in a wider range of adolescent workplaces.
Resumo:
This study explores full-time workers' understanding of and assumptions about part-time work against six job quality components identified in recent literature. Forty interviews were conducted with employees in a public sector agency in Australia, a study context where part-time work is ostensibly 'good quality' and is typically long term, voluntary, involving secure contracts (i.e. permanent rather than casual) and having predictable hours distributed evenly over the week and year. Despite strong collective bargaining arrangements as well as substantial legal and industrial obligations, the findings revealed some serious concerns for part-time job quality. These concerns included reduced responsibilities and lesser access to high status roles and projects, a lack of access to promotion opportunities, increased work intensity and poor workplace support. The highly gendered, part-time labour market also means that it is women who disproportionately experience this disadvantage. To foster equity, greater attention needs to focus on monitoring and enhancing job quality, regardless of hours worked.
Resumo:
Abstract Background Understanding spatio-temporal variation in malaria incidence provides a basis for effective disease control planning and monitoring. Methods Monthly surveillance data between 1991 and 2006 for Plasmodium vivax and Plasmodium falciparum malaria across 128 counties were assembled for Yunnan, a province of China with one of the highest burdens of malaria. County-level Bayesian Poisson regression models of incidence were constructed, with effects for rainfall, maximum temperature and temporal trend. The model also allowed for spatial variation in county-level incidence and temporal trend, and dependence between incidence in June–September and the preceding January–February. Results Models revealed strong associations between malaria incidence and both rainfall and maximum temperature. There was a significant association between incidence in June–September and the preceding January–February. Raw standardised morbidity ratios showed a high incidence in some counties bordering Myanmar, Laos and Vietnam, and counties in the Red River valley. Clusters of counties in south-western and northern Yunnan were identified that had high incidence not explained by climate. The overall trend in incidence decreased, but there was significant variation between counties. Conclusion Dependence between incidence in summer and the preceding January–February suggests a role of intrinsic host-pathogen dynamics. Incidence during the summer peak might be predictable based on incidence in January–February, facilitating malaria control planning, scaled months in advance to the magnitude of the summer malaria burden. Heterogeneities in county-level temporal trends suggest that reductions in the burden of malaria have been unevenly distributed throughout the province.
Resumo:
‘Stepping out into the real world of Education’ has been written to complement ‘Transitioning to the real world of Education’ (Millwater & Beutel, 2008). Both books are aimed at strategising the transition you are experiencing, from preservice teacher to professional educator, through issues that you will face as early career teachers from any specialist teaching strand - early childhood, primary, middle or secondary. ‘Transitioning to the real world of Education’ (Millwater & Beutel, 2008) addressed the particularities and practicalities of professional standards, life-long learning, teaching for diversity, values-education, teacher/student relationships, teaching in a digital age and teacher burnout. This text aligns with these and explores other areas, in recognition that your early career phase is the pivotal point of how much you commit to being a teacher in the long term.
Resumo:
A recent Australian survey of beginning teachers indicates that issue of classroom management continues to be a key concern for early career educators (Australian Education Union, 2007). This finding is supported by the wider literature that identifies managing the classroom, particularly managing behaviour within the classroom, as critical issues for early career teachers (Arends, 2006; Charles, 2004; Groundwater-Smith, Ewing & Le Cornu, 2007). In fact, struggling to manage student behaviour and maintain positive relationships with students are among the top reasons for teachers leaving the teaching profession (Charles, 2004). So, how does a teacher effectively organise and manage up to thirty students learning and behaviour at any one time? The issue of classroom management is a persistent one for all teachers, but is particularly daunting for new teachers. Historically, classrooms were established on strong hierarchical structures that relied heavily on teacher control and authority. However, more recent approaches to managing the classroom are proactive and more collaborative. That is not to say that there exists a single management recipe, far from it. Beginning teachers must view possible approaches to managing the classroom in light of their own beliefs about teaching and learning, their current classroom practice and variables from the context in which they are teaching.
Resumo:
Isolation of a faulted segment, from either side of a fault, in a radial feeder that has several converter interfaced DGs is a challenging task when current sensing protective devices are employed. The protective device, even if it senses a downstream fault, may not operate if fault current level is low due to the current limiting operation of converters. In this paper, a new inverse type relay is introduced based on line admittance measurement to protect a distribution network, which has several converter interfaced DGs. The basic operation of this relay, its grading and reach settings are explained. Moreover a method is proposed to compensate the fault resistance such that the relay operation under this condition is reliable. Then designed relay performances are evaluated in a radial distribution network. The results are validated through PSCAD/EMTDC simulation and MATLAB calculations.
Resumo:
Top screw pullout occurs when the screw is under too much axial force to remain secure in the vertebral body. In vitro biomechanical pullout tests are commonly done to find the maximum fixation strength of anterior vertebral body screws. Typically, pullout tests are done instantaneously where the screw is inserted and then pulled out immediately after insertion. However, bone is a viscoelastic material so it shows a time dependent stress and strain response. Because of this property, it was hypothesised that creep occurs in the vertebral trabecular bone due to the stress caused by the screw. The objective of this study was therefore to determine whether the axial pullout strength of anterior vertebral body screws used for scoliosis correction surgery changes with time after insertion. This study found that there is a possible relationship between pullout strength and time; however more testing is required as the sample numbers were quite small. The design of the screw is made with the knowledge of the strength it must obtain. This is important to prevent such occurrences as top screw pullout. If the pullout strength is indeed decreased due to creep, the design of the screw may need to be changed to withstand greater forces.