202 resultados para Key management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

To understand the nature of police organisations and their management in an Australian context it is necessary to appreciate the recent history of policing at least in the last 30 years. In doing so an overall perspective is gained on the various reform efforts and organisational changes that have taken place in Australian policing. With this police reform perspective clearly in mind it then becomes possible to appreciate that the organization and management of the institution of policing in Australia is nested within the larger framework of ‘governance’. Hence, this notion of governance will be used as the key focal point around which to understand how police organizations manage their mission in the Australian context. Finally, the chapter discusses the inevitable ‘tension spaces’ that arise in policing and the need for police organizations to better manage such complexities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Design-builders play a vital role in the success of DB projects. In the construction market of the People’s Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, which are, namely, (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this paper is to identify and empirically examine the key features, purposes, uses, and benefits of performance dashboards. We find that only about a quarter of the sales managers surveyed1 in Finland used a dashboard, which was lower than previously reported. Dashboards were used for four distinct purposes: (i) monitoring, (ii) problem solving, (iii) rationalizing, and (iv) communication and consistency. There was a high correlation between the different uses of dashboards and user productivity indicating that dashboards were perceived as effective tools in performance management, not just for monitoring one‟s own performance but for other purposes including communication. The quality of the data in dashboards did not seem to be a concern (except for completeness) but it was a critical driver regarding its use. This is the first empirical study on performance dashboards in terms of adoption rates, key features, and benefits. The study highlights the research potential and benefits of dashboards, which could be valuable for future researchers and practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to clarify the foundations of the discipline of project management (PM). Historically, PM has evolved from a conceptual approach based on a positivist paradigm. The author questions the appropriateness of such foundations for the kind of project management which claims to deal with complex problems. To answer this question, a brief history of project management emphasizes key concepts useful to the discussion. Comprehensive definitions of knowledge, competencies, performance and knowledge management are reviewed to provide a better understanding of the project environment in terms of its present positivist epistemological position. This paper explores the tensions and paradoxes encountered in PM practice, when set within the boundaries of a normative approach; it also highlights the polysemic nature of PM, for which an extended framework is proposed. Dialectic, qualitative and interpretative aspects of PM are presented alongside its quantitative body of Knowledge. The author finally introduces an innovative overview of project management, set in the greater context of the learning organization. Implications and applications of this perspective are discussed and lead to the presentation of the MAP metamethod, a systemic practical approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the key trends that we currently witness not only in academic circles but also in industry - all throughout Australia at least – is that “Innovation” is becoming an important driver for business projects, for change agendas – and in turn, for Business Process Management initiatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: To provide an overview and a critical appraisal of systematic reviews (SRs) of published interventions for the prevention/management of radiation dermatitis. Methods and Materials: We searched Medline, CINAHL, Embase, and the Cochrane Library. We also manually searched through individual reference lists of potentially eligible articles and a number of key journals in the topic area. Two authors screened all potential articles and included eligible SRs. Two authors critically appraised and extracted key findings from the included reviews using AMSTAR (the measurement tool for “assessment of multiple systematic reviews”). Results: Of 1837 potential titles, 6 SRs were included. A number of interventions have been reported to be potentially beneficial for managing radiation dermatitis. Interventions evaluated in these reviews included skin care advice, steroidal/nonsteroidal topical agents, systemic therapies, modes of radiation delivery, and dressings. However, all the included SRs reported that there is insufficient evidence supporting any single effective intervention. The methodological quality of the included studies varied, and methodological shortfalls in these reviews might create biases to the overall results or recommendations for clinical practice. Conclusions: An up-to-date high-quality SR in the prevention/management of radiation dermatitis is needed to guide practice and direction for future research. We recommend that clinicians or guideline developers critically evaluate the information of SRs in their decision making.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

No matter how aspirational they are, management accountants face a series of roadblocks in the course of building careers in organisations. Experts reveal the four key obstacles that need to be addressed in the course of becoming global leaders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This important research is published at a critical time in the history of PRINCE2. The world’s project managers are under incredible scrutiny and pressure to ensure their projects deliver quality on time and on budget – and even more so during a world recession. The research shows that PRINCE2 goes a long way to helping them achieve these goals. Although its origins began in the UK, PRINCE2 now has a truly international reach. We are delighted that the Queensland University of Technology (QUT) has undertaken this global, thorough and informative research project. While it highlights the strengths of the methodology itself, the report also looks at the challenges organisations face when using a project management method such as PRINCE2. We’re sure the challenges will resonate with project managers around the world. Securing executive support to champion the adoption of PRINCE2, creating a robust business case and prioritising project governance are key issues that all project managers will grapple with during their career. The research also shows that to be thoroughly effective, organisations need to properly embed PRINCE2 and tailor it to suit their particular circumstances. Many successful organisations have sought the effective help of accredited consulting organisations to assist them in developing a programme to tailor and inculcate this method into their organisational culture. The latest version incorporates a whole chapter on tailoring PRINCE2. We believe that the publication of PRINCE2 Directing Successful Projects using PRINCE2 and the development of further support in the form of materials, mentoring and training for senior executives will be of significant benefit to contemporary project based organisations. The APM Group has already developed a qualification for sponsors in conjunction with the UK’s Home Office to help with this.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

- Preface by Richard T. Watson - Discusses the emerging challenges of designing “green” business processes - Presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes - Provides insights from cases where organizations successfully engaged in more sustainable business practices Green Business Process Management – Towards the Sustainable Enterprise" consolidates the global state-of-the-art knowledge about how business processes can be managed and improved in light of sustainability objectives. Business organizations, a dominant part of our society, have always been a major contributor to the degradation of our natural environment, through the resource consumption, greenhouse emissions, and wastage production associated with their business processes. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable business processes. Finding solutions to this organizational design problem is the key challenge of Green Business Process Management. This book discusses the emerging challenges of designing “green” business processes, presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes, and provides insights from cases where organizations successfully engaged in more sustainable business practices. The book is of relevance to both practitioners and academics who are interested in understanding, designing, and implementing “green” business processes. It also constitutes a valuable resource for students and lecturers in the fields of information systems, management, and sustainable development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In managing their operations, organizations have traditionally focused on economic imperatives in terms of time, cost, efficiency, and quality. In doing so, they have been a major contributor to environmental degradation caused by re-source consumption, greenhouse emissions, and wastage. As a consequence, or-ganizations are increasingly encouraged to improve their operations also from an ecological perspective, and thus to consider environmental sustainability as an additional management imperative. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable processes, which we call the challenge of Green Business Process Management (Green BPM). This chapter elaborates on the challenge and perspec-tive of Green BPM, and explores the contributions that business process management can provide to creating environmentally sustainable organizations. Our key premise is that business as well as information technology managers need to engage in a process-focused discussion to enable a common, comprehensive understanding of organizational processes, and the process-centered opportunities for making these processes, and ultimately the organization as a process-centric entity, “green.” Through our review of the key BPM capability areas and how they can be framed in terms of environmental sustainability considerations, we provide an overview and introduction to the subsequent chapters in this book.