387 resultados para Civil engineering work
Resumo:
Deterministic transit capacity analysis applies to planning, design and operational management of urban transit systems. The Transit Capacity and Quality of Service Manual (1) and Vuchic (2, 3) enable transit performance to be quantified and assessed using transit capacity and productive capacity. This paper further defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures the transit task performed over distance. Passenger transmission (p-km/h) captures the passenger task delivered by service at speed. Transit productiveness (p-km/h) captures transit work performed over time. These measures are useful to operators in understanding their services’ or systems’ capabilities and passenger quality of service. This paper accounts for variability in utilized demand by passengers along a line and high passenger load conditions where passenger pass-up delay occurs. A hypothetical case study of an individual bus service’s operation demonstrates the usefulness of passenger transmission in comparing existing and growth scenarios. A hypothetical case study of a bus line’s operation during a peak hour window demonstrates the theory’s usefulness in examining the contribution of individual services to line productive performance. Scenarios may be assessed using this theory to benchmark or compare lines and segments, conditions, or consider improvements.
Resumo:
Urban renewal is a significant issue in developed urban areas, with a particular problem for urban planners being redevelopment of land to meet demand whilst ensuring compatibility with existing land use. This paper presents a geographic information systems (GIS)-based decision support tool (called LUDS) to quantitatively assess land-use suitability for site redevelopment in urban renewal areas. This consists of a model for the suitability analysis and an affiliated land-information database for residential, commercial, industrial, G/I/C (government/institution/community) and open space land uses. Development has occurred with support from interviews with industry experts, focus group meetings and an experimental trial, combined with several advanced techniques and tools, including GIS data processing and spatial analysis, multi-criterion analysis, as well as the AHP method for constructing the model and database. As demonstrated in the trial, LUDS assists planners in making land-use decisions and supports the planning process in assessing urban land-use suitability for site redevelopment. Moreover, it facilitates public consultation (participatory planning) by providing stakeholders with an explicit understanding of planners' views.
Resumo:
Although the drivers of innovation have been studied extensively in construction, greater attention is required on how innovation diffusion can be effectively assessed within this complex and interdependent project-based industry. The authors draw on a highly cited innovation diffusion model by Rogers (2006) and develop a tailored conceptual framework to guide future empirical work aimed at assessing innovation diffusion in construction. The conceptual framework developed and discussed in this paper supports a five-stage process model of innovation diffusion namely: 1) knowledge and idea generation, 2) persuasion and evaluation; 3) decision to adopt, 4) integration and implementation, and 5) confirmation. As its theoretical contribution, this paper proposes three critical measurements constructs which can be used to assess the effectiveness of the diffusion process. These measurement constructs comprise: 1) nature and introduction of an innovative idea, 2) organizational capacity to acquire, assimilate, transform and exploit an innovation, and 3) rates of innovation facilitation and adoption. The constructs are interpreted in the project-based context of the construction industry, extending the contribution of general management theorists. Research planned by the authors will test the validity and reliability of the constructs developed in this paper.
Resumo:
To enhance workplace safety in the construction industry it is important to understand interrelationships among safety risk factors associated with construction accidents. This study incorporates the systems theory into Heinrich’s domino theory to explore the interrelationships of risks and break the chain of accident causation. Through both empirical and statistical analyses of 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, the study investigates relationships between accidents and injury elements (e.g., injury type, part of body, injury severity) and the nature of construction injuries by accident type. The study then discusses relationships between accidents and risks, including worker behavior, injury source, and environmental condition, and identifies key risk factors and risk combinations causing accidents. The research outcomes will assist safety managers to prioritize risks according to the likelihood of accident occurrence and injury characteristics, and pay more attention to balancing significant risk relationships to prevent accidents and achieve safer working environments.
Resumo:
This paper examines the case of a procurement auction for a single project, in which the breakdown of the winning bid into its component items determines the value of payments subsequently made to bidder as the work progresses. Unbalanced bidding, or bid skewing, involves the uneven distribution of mark-up among the component items in such a way as to attempt to derive increased benefit to the unbalancer but without involving any change in the total bid. One form of unbalanced bidding for example, termed Front Loading (FL), is thought to be widespread in practice. This involves overpricing the work items that occur early in the project and underpricing the work items that occur later in the project in order to enhance the bidder's cash flow. Naturally, auctioners attempt to protect themselves from the effects of unbalancing—typically reserving the right to reject a bid that has been detected as unbalanced. As a result, models have been developed to both unbalance bids and detect unbalanced bids but virtually nothing is known of their use, success or otherwise. This is of particular concern for the detection methods as, without testing, there is no way of knowing the extent to which unbalanced bids are remaining undetected or balanced bids are being falsely detected as unbalanced. This paper reports on a simulation study aimed at demonstrating the likely effects of unbalanced bid detection models in a deterministic environment involving FL unbalancing in a Texas DOT detection setting, in which bids are deemed to be unbalanced if an item exceeds a maximum (or fails to reach a minimum) ‘cut-off’ value determined by the Texas method. A proportion of bids are automatically and maximally unbalanced over a long series of simulated contract projects and the profits and detection rates of both the balancers and unbalancers are compared. The results show that, as expected, the balanced bids are often incorrectly detected as unbalanced, with the rate of (mis)detection increasing with the proportion of FL bidders in the auction. It is also shown that, while the profit for balanced bidders remains the same irrespective of the number of FL bidders involved, the FL bidder's profit increases with the greater proportion of FL bidders present in the auction. Sensitivity tests show the results to be generally robust, with (mis)detection rates increasing further when there are fewer bidders in the auction and when more data are averaged to determine the baseline value, but being smaller or larger with increased cut-off values and increased cost and estimate variability depending on the number of FL bidders involved. The FL bidder's expected benefit from unbalancing, on the other hand, increases, when there are fewer bidders in the auction. It also increases when the cut-off rate and discount rate is increased, when there is less variability in the costs and their estimates, and when less data are used in setting the baseline values.
Resumo:
Atmospheric deposition is one of the most important pathways of urban stormwater pollution. Atmospheric deposition which can be in the form of either wet or dry deposition have distinct characteristics in terms of associated particulate sizes, pollutant types and influential parameters. This paper discusses the outcomes of a comprehensive research study undertaken to identify important traffic characteristics and climate factors such as antecedent dry period and rainfall characteristics which influences the characteristics of wet and dry deposition of solids and heavy metals. The outcomes confirmed that Zinc (Zn) is correlated with traffic volume whereas Lead (Pb), Cadmium (Cd), Nickel (Ni), and Copper (Cu) are correlated with traffic congestion. Consequently, reducing traffic congestion will be more effective than reducing traffic volume for improving air quality particularly in relation to Pb, Cd, Ni, and Cu. Zn was found to have the highest atmospheric deposition rate compared to other heavy metals. Zn in dry deposition is associated with relatively larger particle size fractions (>10 µm), whereas Pb, Cd, Ni and Cu are associated with relatively smaller particle size fractions (<10 µm). The analysis further revealed that bulk (wet plus dry) deposition which is correlated with rainfall depth and contains a relatively higher percentage of smaller particles compared to dry deposition which is correlated with the antecedent dry period. As particles subjected to wet deposition are smaller, they disperse over a larger area from the source of origin compared to particles subjected to dry deposition as buoyancy forces become dominant for smaller particles compared to the influence of gravity. Furthermore, exhaust emission particles were found to be primarily associated with bulk deposition compared to dry deposition particles which mainly originate from vehicle component wear.
Resumo:
In the era of a global knowledge economy, urban regions that seek to increase their competitive edge, become destinations for talent and investment and provide prosperity and high quality of life to their inhabitants have little chance of achieving these goals without forming effective knowledge-based urban development strategies. The research reported in this paper aims to address the questions of how a knowledge-based urban development performance measurement can be undertaken and the value contribution of such measurement. The paper focuses on the city of Helsinki. This empirical study analytically investigates Helsinki’s performance from the lens of knowledge-based urban development by comparing this urban region with eight international competitors, Boston, San Francisco, Birmingham, Manchester, Melbourne, Sydney, Toronto, and Vancouver. The results of the study not only reveal a clearer understanding of Helsinki’s benchmarked performance and competitive edge considering the regional policy context along with strategic directions in strengthening its international standing and competitiveness but also provide useful insights for other urban regions that aspire to such development.
Resumo:
The accuracy and reliability of urban stormwater quality modelling outcomes are important for stormwater management decision making. The commonly adopted approach where only a limited number of factors are used to predict urban stormwater quality may not adequately represent the complexity of the quality response to a rainfall event or site-to-site differences to support efficient treatment design. This paper discusses an investigation into the influence of rainfall and catchment characteristics on urban stormwater quality in order to investigate the potential areas for errors in current stormwater quality modelling practices. It was found that the influence of rainfall characteristics on pollutant wash-off is step-wise based on specific thresholds. This means that a modelling approach where the wash-off process is predicted as a continuous function of rainfall intensity and duration is not appropriate. Additionally, other than conventional catchment characteristics, namely, land use and impervious surface fraction, other catchment characteristics such as impervious area layout, urban form and site specific characteristics have an important influence on both, pollutant build-up and wash-off processes. Finally, the use of solids as a surrogate to estimate other pollutant species was found to be inappropriate. Individually considering build-up and wash-off processes for each pollutant species should be the preferred option.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Wheel–rail interaction is one of the most important research topics in railway engineering. It involves track impact response, track vibration and track safety. Track structure failures caused by wheel–rail impact forces can lead to significant economic loss for track owners through damage to rails and to the sleepers beneath. Wheel–rail impact forces occur because of imperfections in the wheels or rails such as wheel flats, irregular wheel profiles, rail corrugations and differences in the heights of rails connected at a welded joint. A wheel flat can cause a large dynamic impact force as well as a forced vibration with a high frequency, which can cause damage to the track structure. In the present work, a three-dimensional (3-D) finite element (FE) model for the impact analysis induced by the wheel flat is developed by use of the finite element analysis (FEA) software package ANSYS and validated by another validated simulation. The effect of wheel flats on impact forces is thoroughly investigated. It is found that the presence of a wheel flat will significantly increase the dynamic impact force on both rail and sleeper. The impact force will monotonically increase with the size of wheel flats. The relationships between the impact force and the wheel flat size are explored from this finite element analysis and they are important for track engineers to improve their understanding of the design and maintenance of the track system.
Resumo:
This research identifies residential mobility behaviour impacts of residential dissonance in Transit Oriented Developments (TODs) vs. non-TODs in Brisbane, Australia. Based on the characteristics of living environments (density, diversity, connectivity, and accessibility) and the travel preferences of 4545 individuals, respondents in 2009 were classified into one of four categories including: TOD consonants, TOD dissonants, non-TOD dissonants, and non-TOD consonants. Binary logistic regression analyses were employed to identify residential mobility behaviour of groups between 2009 and 2011; controlling for time varying covariates. The findings show that both TOD dissonants and TOD consonants move residences at an equal rate. However, TOD dissonants are more likely to move residences to their preferred non-TOD areas. In contrast, non-TOD dissonants not only moved residences at a lower rate, but their rate of mobility to their preferred TOD neighbourhood is also significantly lower due to costs and other associated factors. The findings suggest that discrete land use policy development is required to integrate non-TOD dissonant and TOD dissonant behaviours to support TOD development in Brisbane.
Resumo:
Proxy reports from parents and self-reported data from pupils have often been used interchangeably to identify factors influencing school travel behaviour. However, few studies have examined the validity of proxy reports as an alternative to self-reported data. In addition, despite research that has been conducted in a different context, little is known to date about the impact of different factors on school travel behaviour in a sectarian divided society. This research examines these issues using 1624 questionnaires collected from four independent samples (e.g. primary pupils, parent of primary pupils, secondary pupils, and parent of secondary pupils) across Northern Ireland. An independent sample t test was conducted to identify the differences in data reporting between pupils and parents for different age groups using the reported number of trips for different modes as dependent variables. Multivariate multiple regression analyses were conducted to then identify the impacts of different factors (e.g. gender, rural–urban context, multiple deprivations, and school management type, net residential density, land use diversity, intersection density) on mode choice behaviour in this context. Results show that proxy report is a valid alternative to self-reported data, but only for primary pupils. Land use diversity and rural–urban context were found to be the most important factors in influencing mode choice behaviour.
Resumo:
The state of the practice in safety has advanced rapidly in recent years with the emergence of new tools and processes for improving selection of the most cost-effective safety countermeasures. However, many challenges prevent fair and objective comparisons of countermeasures applied across safety disciplines (e.g. engineering, emergency services, and behavioral measures). These countermeasures operate at different spatial scales, are funded often by different financial sources and agencies, and have associated costs and benefits that are difficult to estimate. This research proposes a methodology by which both behavioral and engineering safety investments are considered and compared in a specific local context. The methodology involves a multi-stage process that enables the analyst to select countermeasures that yield high benefits to costs, are targeted for a particular project, and that may involve costs and benefits that accrue over varying spatial and temporal scales. The methodology is illustrated using a case study from the Geary Boulevard Corridor in San Francisco, California. The case study illustrates that: 1) The methodology enables the identification and assessment of a wide range of safety investment types at the project level; 2) The nature of crash histories lend themselves to the selection of both behavioral and engineering investments, requiring cooperation across agencies; and 3) The results of the cost-benefit analysis are highly sensitive to cost and benefit assumptions, and thus listing and justification of all assumptions is required. It is recommended that a sensitivity analyses be conducted when there is large uncertainty surrounding cost and benefit assumptions.
Resumo:
Dhaka, which is the capital of Bangladesh, is facing serious traffic congestion and whole traffic situation in Dhaka is in chaos. Government has initiated some projects; such as BRT, MRT and elevated expressway; to improve the situation. Road pricing is very popular concept, which can be implemented in Dhaka with BRT and MRT as an integrated manner. Even though it is very popular concept not many countries except some developed countries implemented road pricing practically. None of the developing countries adopted this policy. For success of road pricing it has to be acceptable among the stakeholders. Public are the main stakeholders for road pricing. This paper will explore whether road pricing will be acceptable in Dhaka considering only work trip in Dhaka. A sample of workers had been surveyed randomly. They were asked some demographic questions, such as age, gender, income and educational qualification; how they travelled to work; and whether they would accept road pricing; and if they would not accept road pricing the reasons behind that. Also respondents were given several hypothetical choices to see how respondents react with different road charge by choosing travel mode for their work trip. The methodological approach taken for analysis is qualitative and quantitative analysis. For quantitative analysis Binary Logit Regression analysis was carried out to find out the significant factors for accepting or not accepting road pricing.