117 resultados para court delay
Resumo:
Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.
Resumo:
We report a new approach that uses the single beam Z-scan technique, to discriminate between excited state absorption (ESA) and two and three photon nonlinear absorption. By measuring the apparent delay or advance of the pulse in reaching the detector, the nonlinear absorption can be unambiguously identified as either instantaneous or transient. The simple method does not require a large range of input fluences or sophisticated pulse-probe experimental apparatus. The technique is easily extended to any absorption process dependent on pulse width and to nonlinear refraction measurements. We demonstrate in particular, that the large nonlinear absorption in ZnO nanocones when exposed to nanosecond 532 nm pulses, is due mostly to ESA, not pure two-photon absorption.
Resumo:
In Elders Rural Services Australia Ltd v Gooden [2014] QDC 22 Reid DCJ considered the interaction of the procedures under the Uniform Civil Procedure Rules 1999 (Qld)relating to disclosure by parties to a proceeding and the subpoena process, in the context of a proceeding commenced by originating application.
Resumo:
This article presents an overview of two aspects of the role the internet now plays in the court system - first, the extent to which judges, administrators and court officials at the different levels in the court hierarchy are using the internet to deliver enhanced access to the Australian justice system for the community as a whole, and second, how they have embraced that same technology as an aid for accessing information for better judgment delivery and administration.
Resumo:
In Australian Prudential Regulation Authority v Rural and General Insurance Let [2004] FCA 933, Gyles J considered what he described as "a novel question", namely, whether taking steps to prepare to give oral evidence when subpoenaed to attend for that purpose, including the obtaining of legal advice and assistance, could be recovered by the witness under O 27 r 11 of the Federal Court Rules
Resumo:
In Lambert v Surplice [2004] QDC 092 McGill DCJ considered the extent to which the court should exercise a discretion on an application under s79 of the District Court Act 1967 to transfer a proceeding pending in the Magistrates Court to the District Court.
Resumo:
In Asset Loan Management v Mamap Pty Ltd [2005] QDC 295, McGill DCJ held that costs may be recovered in Magistrates Courts on the indemnity basis. His Honour was satisfied his conclusion in this respect was not precluded by the decision of the Court of Appeal in Beardmore v Franklins Management Services Pty Ltd [2002] QCA 60
Resumo:
In CB Richard Ellis (C) Pty Ltd v Wingate Properties Pty Ltd [2005] QDC 399 McGill DCJ examined whether the court now has a discretion to set aside an irregularly entered default judgment.
Resumo:
The case of Flynn v The Maryborough Sugar Factory Limited [2003] QDC 446 the plaintiff had been awarded damages for personal injuries and there was a charge on those damages under a Commonwealth statute, with a provision in the statute that damages could not be satisfied until the Commonwealth had been paid. The Court considered the point of considerable practical significance of whether interest accrued on the judgment under s48 of the Supreme Court Act 1995 (Qld) before the defendant had obtained clearances under the Commonwealth legislation.
Resumo:
The article examines the decision in Erskine v McDowall [2001] QDC 192, where the Court considered an application for an order that the defendant disclose documents to which she had a right of access under the Freedom of Information Act 1982 (Cth).
Resumo:
The decision in Hook v Boreham & QBE Insurance (Australia) Limited [2006] QDC 304 considered whether the court should go further than order that costs be assessed on the indemnity basis, but should also specify the basis by which those indemnity costs should be determined. The decision makes it clear that under r704(3) of the Uniform Civil Procedure Rules, questions of that nature are ordinarily preserved to the discretion of the Registrar.
Duty to the court and the administration of justice : some examples, implications and clarifications
Resumo:
No liberal democracy can survive without popular trust in its judicial system. The legal profession and the judiciary enjoy a level of independence and autonomy from the executive that makes them both powerful and privileged. A UNIQUE AND ORGANIC DUTY: So long as the courts are seen to fulfil their duty to guard against encroachments by the executive on the freedoms and rights of individual citizens with integrity and credibility, they maintain enough public support to retain their normative authority. But support for those with power and privilege is easily undermined. It is contingent upon trust. Lawyers who breach that trust in ways that go to the heart of the legal system ought to expect to be made examples of and to suffer severe penalties. The good news is that the sorts of breach discussed here should be neither difficult to anticipate nor to avoid – in theory. In practice, smart and honest lawyers sometimes fall foul of these duties for all sorts of understandable (if not condonable) reasons. Law does not get practised in a social or cultural vacuum. Lawyers are people, and people have weaknesses, failings and stresses...
A derivative-free explicit method with order 1.0 for solving stochastic delay differential equations
Resumo:
This thesis reports on an empirically based study of the manner in which Victorian Magistrates Courts constructed occupational health and safety (OHS) issues when hearing prosecutions for offences under the Industrial Safety, Health and Welfare Act 1981 (the ISHWA) and the Occupational Health and Safety Act 1985 (OHSA) from 1983 to 1991. These statutes established OHS standards for employers and other relevant parties. The State government enforced these standards through an OHS inspectorate which had a range of enforcement powers, including prosecution. After outlining the historical development of Victoria’s OHS legislation, the magistracy’s historical role in its enforcement, and the development of an enforcement culture in which inspectors viewed prosecution as a last resort, the study shows how the key provisions of the ISHWA and OHSA required occupiers of workplaces and employers to provide and maintain safe systems of work, including the guarding of dangerous machinery. Using a wide range of empirical research methods and legal materials, it shows how the enforcement policies, procedures and practices of the inspectorate heavily slanted inspectors workplace investigations and hence prosecutions towards a restricted and often superficial, analysis of incidents (or “events”) most of which involved injuries on machinery. There was evidence, however, that after the establishment of the Central Investigation Unit in 1989 cases were more thoroughly investigated and prosecuted. From 1990 the majority of prosecutions were taken under the employer’s general duty provisions, and by 1991 there was evidence that prosecutions were focusing on matters other than machinery guarding.