122 resultados para Public – Private Sectors


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction contracts often provide that decisions under the contract will be made by a certifier. This paper reviews the liability issues when a certifier makes a mistake. We do that in light of recent pronouncements by the High Court of Australia and the New South Wales Court of Appeal on negligence. We look at this question in the context of traditional construction contract arrangements and also consider the implications for Public Private Partnerships and the typical contract arrangements entered into to facilitate these transactions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The 2008 NASA Astrobiology Roadmap provides one way of theorising this developing field, a way which has become the normative model for the discipline: science-and scholarship-driven funding for space. By contrast, a novel re-evaluation of funding policies is undertaken in this article to reframe astrobiology, terraforming and associated space travel and research. Textual visualisation, discourse and numeric analytical methods, and value theory are applied to historical data and contemporary sources to re-investigate significant drivers and constraints on the mechanisms of enabling space exploration. Two data sets are identified and compared: the business objectives and outcomes of major 15th-17th century European joint-stock exploration and trading companies and a case study of a current space industry entrepreneur company. Comparison of these analyses suggests that viable funding policy drivers can exist outside the normative science and scholarship-driven roadmap. The two drivers identified in this study are (1) the intrinsic value of space as a territory to be experienced and enjoyed, not just studied, and (2) the instrumental, commercial value of exploiting these experiences by developing infrastructure and retail revenues. Filtering of these results also offers an investment rationale for companies operating in, or about to enter, the space business marketplace.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Background Not getting enough physical activity leads to poorer health. Regular physical activity can reduce the risk of chronic disease and improve one’s health and well-being. The lack of physical activity is a common and growing problem in many countries. We sought to evaluate the effects of community wide, multi-strategic interventions upon the physical activity patterns of populations. Method We undertook a Cochrane Systematic Review which included an extensive search of databases, including studies which met pre-determined criteria, and conducted independent risk of bias assessment and data extraction. Results After the selection process, 25 studies were included in the review. The strategies varied by the number and type of components and their intensity. No studies were identified as low risk of bias. Sixteen studies were identified as having a high risk of bias and thus untrustworthy. Nine studies were of considered to have an unclear risk of bias and some studies held back data they collected. The effects reported were inconsistent across the studies and the measures. Some of the better designed studies showed no improvement in measures of physical activity. Interventions which have an environmental change component seemed to be a promising direction. Those interventions which were primarily a mass media campaign were less likely to be successful. Conclusions Although numerous studies have been undertaken, there is considerable inconsistency in the findings of the available studies and this is confounded by serious methodological issues within the included studies. Simply combining interventions does not necessarily result in increased physical activity as many such studies, including some long term programs, failed to demonstrate efficacy. There is a clear need for well-designed studies and these studies should focus on the quality of measurement of physical activity. The review is currently being updated with newer studies.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Background Prevention of childhood obesity is a public health priority for Malaysia and many other countries. Physical activity for children is also decreasing at an alarming rate. Both conditions are associated with non-communicable diseases and with significant morbidity and mortality in later life. Systematic reviews of public health interventions provide a useful summary to inform public health practice by combining the results of a range of research studies on a specific intervention into a single report. Systematic reviews are deemed most valuable for health program development and evidence based practice. Unfortunately, many policy makers and practitioners are simply unaware of the evidence: which strategies which are most likely to provide benefit; and which strategies are known to be harmful or useless. This presentation provides a “birds eye” overview based upon recent (since 2007 to present) high quality systematic reviews of public health interventions. Method HealthEvidece.org and the Cochrane Library were searched for systematic reviews which evaluated interventions targeting obesity prevention and increasing physical activity for children. The findings of the included reviews were themed and summarized. Results Seven reviews were identified addressing obesity in the early years, and fifteen reviews addressing obesity more broadly in childhood. Additional reviews were identified aimed at increasing physical activity. The synthesis shows several strategies to be effective, however many popular strategies clearly are not. Several of the reviews were inconclusive due to an absence of robust primary studies. Amongst the findings, interventions undertaken in the school setting appear very promising. Conclusions There is significant evidence from systematic reviews to guide public health practice and policy, and to inform future research.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The buoyancy that the Indian economy experienced between 2000 and 2010, in spite of the global downturn of 2008, is no longer a reality. Growth projections for 2012-13 have been reassessed to 6.5 per cent. This is still higher than most other developed economies of the world (see Figure 1.1), however the growth rate is slowing. The World Bank in its recent forecasts1 expects India’s growth rates not to extend beyond 7.2 % and 7.4 % in the years 2013-14 and 2014-15, respectively. Similarly, the Planning Commission has scaled down the growth target for the 12th Five Year Plan (2012-17) from 9% to 8%. Different reports note different rates, but the consistent message is that the projection of India’s economy is on a downward trend...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Despite the realisation of the potential implications from biosimilars is relatively recent, much has already been written about raising the awareness of differences between biosimilars and originating/ reference listed (innovator) pharmaceuticals. The European Medicines Agency has led the global charge in regulating biosimilars. Regardless of sufficient similarities across international regulations, differences do exist across jurisdictions. The consideration of regulating biosimilars demands a congruent approach across all stages: pre-registration (Australian copyright protection, patent, international obligations), registration (confidential information, international regulators, safety and efficacy), post-registration (Pharmaceutical Benefit Scheme, prescriber and dispenser awareness). Our National Medicines Policy could provide the necessary congruent framework and function for national and international regulation of biosimilars. The Policy concedes that pharmaceuticals will be affected by financial policies and trade considerations, international treaty obligations, industrial policies, education policies and the need for public-private partnerships.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

How does globalization influence transitions toward more sustainable socio-technical regimes in the developing world? This paper argues that transformations of regimes, the networks and institutions governing technological and environmental practices in an industry, can be positively influenced by globalization but it depends on how global forces interact with local socio-political landscapes-the political-economic institutions, values, and regulations broadly guiding an economy and its relationship to the environment. We evaluate these relationships through a comparison of two kinds of socio-political landscapes-the neo-liberal export-led development model commonly found in the developing world and the uniquely Asian capitalist developmental state. We first show how the neo-liberal model overemphasizes the power of market forces to facilitate upgrading and more sustainable industrialization. We then argue that capitalist developmental states in East and Southeast Asia have been better able to harness global economic forces for technological and sustainability transitions through an openness to trade and investment and effective public-private institutions able to link cleaner technologies and environmental standards to production activities in firms. We buttress this argument with firm-level evidence showing the evolution of socio-technical regimes in two industries-cement and electronics. The case studies demonstrate how interactions with OECD firms can contribute to environmental technique effects provided the socio-political landscape is amenable to changes in an industry's regime. Ultimately, we find the process of transition to be complex and contingent; a hard slog not a leap frog toward a potentially more sustainable future. We close by considering the limitations on the capitalist developmental state model and with comments about what else needs to be learned about globalization's role in sustainability transitions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (200913), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction scholars suggest that procurement processes can be used as mechanisms to change construction industry practices. This paper discusses industry changes as a response to the calls for integration of sustainability ideals into construction practices. Because major infrastructure construction has been identified as a key producer of greenhouse gas emissions (GHGE), this study explores collaborative procurement models that have been used to facilitate mitigation of GHGE. The study focuses on the application of non-price incentives and rewards that work together as a binary mechanism. Data were collected using mixed-methods: government document content analysis was complemented with data collected through focus groups and individual interviews with both clients and contractors. This report includes examples of greening procurement agendas for three Australian road authorities relating to collaborative procurement project delivery models. Three collaborative procurement models, Alliance Consortium, Early Contractor Involvement and Public Private Partnerships provide evidence of construction projects that were completed early. It can also be argued that both clients and contractors are rewarded through collaborative project delivery. The incentive of early completion is rewarded with reduction of GHGE. This positive environmental outcome, based on a dual benefit and non-price sustainability criteria, suggests a step towards changed industry practices though the use of green procurement models.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study focuses on designing a community environment education center (CEEC) for Chillingham, as a hub for community transition to sustainability, redressing social fragmentation, youth unemployment, a high eco-footprint and economic rural decline due to globalisation. The ecologically sustainable development framework was delivered by integrating environment education and community development through project-based experiential learning. The development of Chillingham Community Centre involved case study research and incorporated participatory design charrettes, transformative learning, eco-positive development and community-public-private partnerships. This process evolved from community strategic planning in a small rural village buffering world heritage rainforests impacted by a rapidly expanding urban conurbation on Australia’s east coast. This community space encompasses socio-environmental flows connecting people to each other and the ecoscape to grow natural capital, community cohesion and empower eco-governance. Modelling passive solar design, on-site renewable energy/water/nutrient cycling, community garden/market and environment education programs sowed the seeds for a green local economy, demonstrating community capacity to participate in transition to sustainability. A small rural community can demonstrate to other communities that a CEEC enables people to meet their socio-environmental and economic needs locally and sustainably. The ecologically sustainable solution is holistic, all settlements need to be richly biodiverse, locally specific and globally wise.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis is a study about women's participation in Bhutan's new democracy and exposes the patriarchy embedded in Bhutanese society which is reinforced through cultural practices and the legal framework. It reveals the public/private dichotomy, the low educational attainment of girls and the gendered division of labour which derails women's public life. It discloses a masculine driven party politics and the challenges of being a woman in the world of men. Nonetheless, the first trailblazing women parliamentarians demonstrated a principled, feminine, political leadership in a masculine environment. Semi-structured interviews, document review and participant observation methods were used to collect data.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This project examines procurement of creative services in a bureaucratic setting and proposes alternative procedures that better negotiate the tensions between creative and bureaucratised ways of working. The outcome is a project procurement strategy called 'Creative Practice Enabled Procurement' and a prototype industry toolkit 'It's Not Shopping! A Guide to Purchasing Innovation and Creativity'. The research is of benefit to managers and creative practitioners, especially those working in interpretive settings. The goal is to propagate better forms of creative procurement across government and private sectors by providing an evidence-based case for improved, practical alternatives.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Personal and political action on climate change is traditionally thought to be motivated by people accepting its reality and importance. However, convincing the public that climate change is real faces powerful ideological obstacles1, 2, 3, 4, and climate change is slipping in public importance in many countries5, 6. Here we investigate a different approach, identifying whether potential co-benefits of addressing climate change7 could motivate pro-environmental behaviour around the world for both those convinced and unconvinced that climate change is real. We describe an integrated framework for assessing beliefs about co-benefits8, distinguishing social conditions (for example, economic development, reduced pollution or disease) and community character (for example, benevolence, competence). Data from all inhabited continents (24 countries; 6,196 participants) showed that two co-benefit types, Development (economic and scientific advancement) and Benevolence (a more moral and caring community), motivated public, private and financial actions to address climate change to a similar degree as believing climate change is important. Critically, relationships were similar for both convinced and unconvinced participants, showing that co-benefits can motivate action across ideological divides. These relationships were also independent of perceived climate change importance, and could not be explained by political ideology, age, or gender. Communicating co-benefits could motivate action on climate change where traditional approaches have stalled.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.