174 resultados para Performance management systems
Resumo:
We read the excellent review of telemonitoring in chronic heart failure (CHF)1 with interest and commend the authors on the proposed classification of telemedical remote management systems according to the type of data transfer, decision ability and level of integration. However, several points require clarification in relation to our Cochrane review of telemonitoring and structured telephone support2. We included a study by Kielblock3. We corresponded directly with this study team specifically to find out whether or not this was a randomised study and were informed that it was a randomised trial, albeit by date of birth. We note in our review2 that this randomisation method carries a high risk of bias. Post-hoc metaanalyses without these data demonstrate no substantial change to the effect estimates for all cause mortality (original risk ratio (RR) 0·66 [95% CI 0·54, 0·81], p<0·0001; revised RR 0·72 [95% CI 0·57, 0·92], p=0·008), all-cause hospitalisation (original RR 0·91 [95% CI 0·84, 0·99] p=0·02; revised RR 0.92 [95% CI 0·84, 1·02], p=0·10 ) or CHF-related hospitalisation (original RR 0·79 [95% CI 0·67, 0·94] p=0·008; revised RR 0·75 [95% CI 0·60, 0·94] p=0·01). Secondly, we would classify the Tele-HF study4, 5 as structured telephone support, rather than telemonitoring. Again, inclusion of these data alters the point-estimate but not the overall result of the meta-analyses4. Finally, our review2 does not include invasive telemonitoring as the search strategy was not designed to capture these studies. Therefore direct comparison of our review findings with recent studies of these interventions is not recommended.
Resumo:
In keeping with the proliferation of free software development initiatives and the increased interest in the business process management domain, many open source workflow and business process management systems have appeared during the last few years and are now under active development. This upsurge gives rise to two important questions: What are the capabilities of these systems? and How do they compare to each other and to their closed source counterparts? In other words: What is the state-of-the-art in the area?. To gain an insight into these questions, we have conducted an in-depth analysis of three of the major open source workflow management systems – jBPM, OpenWFE, and Enhydra Shark, the results of which are reported here. This analysis is based on the workflow patterns framework and provides a continuation of the series of evaluations performed using the same framework on closed source systems, business process modelling languages, and web-service composition standards. The results from evaluations of the three open source systems are compared with each other and also with the results from evaluations of three representative closed source systems: Staffware, WebSphere MQ, and Oracle BPEL PM. The overall conclusion is that open source systems are targeted more toward developers rather than business analysts. They generally provide less support for the patterns than closed source systems, particularly with respect to the resource perspective, i.e. the various ways in which work is distributed amongst business users and managed through to completion.
Resumo:
Organizations today engage in various forms of alliances to manage their existing business processes or to diversify into new processes to sustain their competitive positions. Many of today’s alliances use the IT resources as their backbone. The results of these alliances are collaborative organizational structures with little or no ownership stakes between the parties. The emergence of Web 2.0 tools is having a profound effect on the nature and form of these alliance structures. These alliances heavily depend on and make radical use of the IT resources in a collaborative environment. This situation requires a deeper understanding of the governance of these IT resources to ensure the sustainability of the collaborative organizational structures. This study first suggests the types of IT governance structures required for collaborative organizational structures. Semi-structured interviews with senior executives who operate in such alliances reveal that co-created IT governance structures are necessary. Such structures include co-created IT-steering committees, co-created operational committees, and inter-organizational performance management and communication systems. The findings paved the way for the development of a model for understanding approaches to governing IT and evaluating the effectiveness for such governance mechanisms in today’s IT dependent alliances. This study presents a sustainable IT-related capabilities approach to assessing the effectiveness of suggested IT governance structures for collaborative alliances. The findings indicate a favourable association between organizations IT governance efforts and their ability to sustain their capabilities to leverage their IT resources. These IT-related capabilities also relate to measures business value at the process and firm level. This makes it possible to infer that collaborative organizations’ IT governance efforts contribute to business value.
Resumo:
Organizations today engage in various forms of alliances to manage their existing business processes or to diversify into new processes to sustain their competitive positions. Many of today’s alliances use the IT resources as their backbone. The results of these alliances are collaborative organizational structures with little or no ownership stakes between the parties. The emergence of Web 2.0 tools is having a profound effect on the nature and form of these alliance structures. These alliances heavily depend on and make radical use of the IT resources in a collaborative environment. This situation requires a deeper understanding of the governance of these IT resources to ensure the sustainability of the collaborative organizational structures. This study reports on the first stage of this initiative. It suggest the types of IT governance structures required for collaborative organizational structures. Semi-structured interviews with senior executives who operate in such alliances reveal that co-created IT governance structures are necessary. Such structures include co-created IT-steering committees, cocreated operational committees, and inter-organizational performance management and communication systems. The findings pave the way for the development of a model for understanding approaches to governing IT and evaluating the effectiveness for such governance mechanisms in today’s IT dependent alliances.
Resumo:
Aspect orientation is an important approach to address complexity of cross-cutting concerns in Information Systems. This approach encapsulates these concerns separately and compose them to the main module when needed. Although there a different works which shows how this separation should be performed in process models, the composition of them is an open area. In this paper, we demonstrate the semantics of a service which enables this composition. The result can also be used as a blueprint to implement the service to support aspect orientation in Business Process Management area.
Resumo:
Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.
Resumo:
Information security policies play an important role in achieving information security. Confidentiality, Integrity, and Availability are classic information security goals attained by enforcing appropriate security policies. Workflow Management Systems (WfMSs) also benefit from inclusion of these policies to maintain the security of business-critical data. However, in typical WfMSs these policies are designed to enforce the organisation’s security requirements but do not consider those of other stakeholders. Privacy is an important security requirement that concerns the subject of data held by an organisation. WfMSs often process sensitive data about individuals and institutions who demand that their data is properly protected, but WfMSs fail to recognise and enforce privacy policies. In this paper, we illustrate existing WfMS privacy weaknesses and introduce WfMS extensions required to enforce data privacy. We have implemented these extensions in the YAWL system and present a case scenario to demonstrate how it can enforce a subject’s privacy policy.
Resumo:
Convergence of pervasive technologies, techno-centric customers and the emergence of digitized channels, overabundance of user friendly retail applications are having a profound impact on retail experience, leading to the advent of ‘everywhere retailing’. With the rapid uptake of digital complimentary assets and smart mobile applications are revolutionizing the relationship of retailers with their customers and suppliers. Retail firms are increasingly investing substantial resources on dynamic Customer Relationship Management systems (D-CRM / U-CRM) to better engage with customers to sense and respond quickly (Agility of the firm) to their demands. However, unlike traditional CRM systems, engagement with U-CRM systems requires that firms be hyper sensitive to volatile customer needs and wants. Following the notions of firm agility, this study attempts to develop a framework to understand such unforeseen benefits and issues of U-CRM. This research-in-progress paper reports an a-priory framework including 62 U-CRM benefits derived through an archival analysis of literature.
Resumo:
Purpose – The purpose of this paper is to develop an effective methodology for implementing lean manufacturing strategies and a leanness evaluation metric using continuous performance measurement (CPM). Design/methodology/approach – Based on five lean principles, a systematic lean implementation methodology for manufacturing organizations has been proposed. A simplified leanness evaluation metric consisting of both efficiency and effectiveness attributes of manufacturing performance has been developed for continuous evaluation of lean implementation. A case study to validate the proposed methodology has been conducted and proposed CPM metric has been used to assess the manufacturing leanness. Findings – Proposed methodology is able to systematically identify manufacturing wastes, select appropriate lean tools, identify relevant performance indicators, achieve significant performance improvement and establish lean culture in the organization. Continuous performance measurement matrices in terms of efficiency and effectiveness are proved to be appropriate methods for continuous evaluation of lean performance. Research limitations/implications – Effectiveness of the method developed has been demonstrated by applying it in a real life assembly process. However, more tests/applications will be necessary to generalize the findings. Practical implications – Results show that applying the methods developed, managers can successfully identify and remove manufacturing wastes from their production processes. By improving process efficiency, they can optimize their resource allocations. Manufacturers now have a validated step by step methodology for successfully implementing lean strategies. Originality/value – According to the authors’ best knowledge, this is the first known study that proposed a systematic lean implementation methodology based on lean principles and continuous improvement techniques. Evaluation of performance improvement by lean strategies is a critical issue. This study develops a simplified leanness evaluation metric considering both efficiency and effectiveness attributes and integrates it with the lean implementation methodology.
Resumo:
Nowadays, process management systems (PMSs) are widely used in many business scenarios, e.g. by government agencies, by insurance companies, and by banks. Despite this widespread usage, the typical application of such systems is predominantly in the context of static scenarios, instead of pervasive and highly dynamic scenarios. Nevertheless, pervasive and highly dynamic scenarios could also benefit from the use of PMSs.
Resumo:
In 2008 we brought together much work at the intersection of entrepreneurship and human resource management (HRM) (Barrett & Mayson, 2008), after calls for more research (Baron, 2003; Katz, Aldrich, Welbourne & Williams, 2000; Tansky & Heneman, 2003). More has been collated since (Soriano, Dobon & Tansky, 2010; Tansky, Soriano & Dobon, 2010). We think it is now time again to regroup, pull conversational threads together and have a critical look at recent research at the intersection of HRM and Entrepreneurship. As editors of International Handbook of Entrepreneurship and HRM (Barrett & Mayson, 2008) we were privileged to collect 23 wonderfully diverse chapters from scholars around the globe addressing a range of issues at the intersection of the two pertinent disciplines or fields: HRM and entrepreneurship. This edition represented a coalescing of ideas that had been swirling about for some time. In three sections, the first dealt with theory and research methods, the second with the nature of HRM in small and entrepreneurial firms and the third with the functional aspects of HRM. At the time we were aware that the handbook did not cover the entire field and many topics were left unexplored. For example, the topic of regulation was generally absent while issues such as career advancement, performance management, organisational change and gender, diversity and ethnicity were also missing. In essence, the majority of those contributions sought to develop an understanding of the context in which particular aspects of HRM can be played out.
Resumo:
The Central Queensland Mine Rehabilitation Group (CQMRG) has hosted mine site rehabilitation inspections combined with technical workshops for more than 20 years. It was recognised at CQMRG's anniversary meeting in April 2013 that the vast body of knowledge held by rehabilitation and closure planning practitioners was being lost as senior rehabilitation experts retire from the industry. It was noted that even more knowledge could be readily lost unless a knowledge management platform was developed to capture, store and enable retrieval of this information. This loss of knowledge results in a significant cost to industry. This project was therefore undertaken to review tools which have the capability to gather the less formal knowledge as well as to make links to existing resources and bibliographic material. This scoping study evaluated eight alternative knowledge management systems to provide guidance on the best method of providing the industry with an up-to-date, good practice, knowledge management system for rehabilitation and closure practices, with capability for information sharing via a portal and discussion forum. This project provides guidance for a larger project which will implement the knowledge management system to meet the requirements of the CQMRG and be transferrable to other regions if applicable. It will also provide the opportunity to identify missing links between existing tools and their application. That is, users may not be aware of how these existing tools can be used to assist with mine rehabilitation planning and implementation and the development of a new platform will help to create those linkages. The outcomes of this project are directed toward providing access to a live repository of rehabilitation practice information which is Central Queensland coal mine-specific, namely: highlighting best practice activities, results of trials and innovative practices; updated legislative requirements; links to practices elsewhere; and informal anecdotal information relevant to particular sites which may be of assistance in the development of rehabilitation of new areas. Solutions to the rehabilitation of challenging spoils/soils will also be provided. The project will also develop a process which can be applied more broadly within the mining sector to other regions and other commodities. Providing a platform for uploading information and holding discussion forums which can be managed by a regional practitioner network enables the new system to be kept alive, driven by users and information needs as they evolve over time. Similar internet-based platforms exist and are managed successfully. The preferred knowledge management system will capture the less formal and more difficult to access knowledge from rehabilitation and mine closure practitioners and stakeholders through the CQMRG and other contributors. It will also provide direct links, and greater accessibility, to more formal sources of knowledge with anticipated cost savings to the industry and improved rehabilitation practices with successful transitioning to closure and post-mining land use.
Resumo:
This paper addresses the regulatory issues arising in developing a new regulatory model for the New South Wales Coal Industry. As such, it identifies the relevant literature on this subject, the options available for reform, and the experience of Australian and key international bodies responsible for the development of regulatory standards in this area. In particular it: Identifies the main shortcomings in the existing regulatory approach; Identifies the potential roles/main strengths and weaknesses of different types of standards (eg specification, performance, process and systems-based rules) and potential “best practice’ combinations of standards; Examines the appropriateness of the current regulatory regime whereby the general OHS legislation (including the general duty provisions) applies to mining in addition to the large body of regulation which is specific to mining; Identifies the importance of, and possible means of addressing, issues of worker participation within the coal mining industry; Draws on the literature on what motivates companies and individuals for the purpose of recommending key provisions for inclusion in new legislation to provide appropriate personal and organisational incentives; Draws on the literature on major hazards facilities to suggest the appropriate roles for OHS management systems and safety reports or comparable approaches (eg mine safety management plans); Draws on the United Kingdom (UK) and United States of America (USA) experience of coal mine safety and its regulation for comparative purposes, and for insights as to what sort of regulation most effectively reduces work related injury and disease in coal mining; Examines the relevant roles of International Labour Organisation (ILO) Conventions; Examines the extent to which different regulatory regimes would be appropriate to open cut and underground coal mining; and Examines options for reform. This paper is focussed specifically on the issues identified above.
Resumo:
New public management (NPFM), with its hands-on, private sector-style performance measurement, output control, parsimonious use of resources, disaggreation of public sector units and greater competition in the public sector, has significantly affected charitable and nonprofit organisations delivering community services (Hood, 1991; Dunleavy, 1994; George & Wilding, 2002). The literature indicates that nonprofit organisations under NPM believe they are doing more for less: while administration is increasing, core costs are not being met; their dependence on government funding comes at the expense of other funding strategies; and there are concerns about proportionality and power asymmetries in the relationship (Kerr & Savelsberg, 2001; Powell & Dalton, 2011; Smith, 2002, p. 175; Morris, 1999, 2000a). Government agencies are under increased pressure to do more with less, demonstrate value for money, measure social outcomes, not merely outputs and minimise political risk (Grant, 2008; McGreogor-Lowndes, 2008). Government-community service organisation relationships are often viewed as 'uneasy alliances' characterised by the pressures that come with the parties' differing roles and expectations and the pressures that come with the parties' differing roles and expectations and the pressurs of funding and security (Productivity Commission, 2010, p. 308; McGregor-Lowndes, 2008, p. 45; Morris, 200a). Significant community services are now delivered to citizens through such relationships, often to the most disadvantaged in the community, and it is important for this to be achieved with equity, efficiently and effectively. On one level, the welfare state was seen as a 'risk management system' for the poor, with the state mitigating the risks of sickness, job loss and old age (Giddens, 1999) with the subsequent neoliberalist outlook shifting this risk back to households (Hacker, 2006). At the core of this risk shift are written contracts. Vincent-Jones (1999,2006) has mapped how NPM is characterised by the use of written contracts for all manner of relations; e.g., relgulation of dealings between government agencies, between individual citizens and the state, and the creation of quais-markets of service providers and infrastructure partners. We take this lens of contracts to examine where risk falls in relation to the outsourcing of community services. First we examine the concept of risk. We consider how risk might be managed and apportioned between governments and community serivce organisations (CSOs) in grant agreements, which are quasiy-market transactions at best. This is informed by insights from the law and economics literature. Then, standard grant agreements covering several years in two jurisdictions - Australia and the United Kingdom - are analysed, to establish the risk allocation between government and CSOs. This is placed in the context of the reform agenda in both jurisdictions. In Australia this context is th enonprofit reforms built around the creation of a national charities regulator, and red tape reduction. In the United Kingdom, the backdrop is the THird Way agenda with its compacts, succeed by Big Society in a climate of austerity. These 'case studies' inform a discussion about who is best placed to bear and manage the risks of community service provision on behalf of government. We conclude by identifying the lessons to be learned from our analysis and possible pathways for further scholarship.
Resumo:
This chapter sets out to identify patterns at play in boardroom discussions around the design and adoption of an accountability system in a nonprofit organisation. To this end, it contributes to the scarce literature showing the backstage of management accounting systems (Berry, 2005), investment policy determining (Kreander, Beattie & McPhail, 2009; Kreander, McPhail & Molyneaux, 2004) and financial planning strategizing (Parker, 2004) or budgeting (Irvine 2005). The paucity of publications is due to issues raised by confidentiality preventing attendance at those meetings (Irvine, 2003), Irvine & Gaffikin, 2006). However, often, the implementation of a new control technology occurs over a long period of time that might exceed the duration of a research project (Quattrone & Hopper, 2001, 2005). Recent trends consisting of having research funded by grants from private institutions or charities have tended to reduce the length of such undertakings to a few months or rarely more than a couple of years (Parker, 2013);