418 resultados para Involuntary clients
Resumo:
This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.
Resumo:
In construction, inter-organisational relationships are of the highest importance. Ethical practice and behaviour is a means for improving inter-organisational relationships by providing a clear understanding of the rights and obligations of all parties, improving productivity, affecting long-term business dealings, and influencing quality, time and costs. Therefore, the ability to build sustainable relationships grounded in ethical practice is important to the construction industry. Establishing ethical standards at the beginning of the procurement process provides an ethical platform for the project life cycle and the relationship between procurers and contractors. Therefore it is important to determine what the ethical issues are in the Australian construction industry from members of the industry themselves; including clients. This “bottom up” approach is not a particularly new concept. Ever since the Gyles Royal Commission in 1992 there has been a considerable effort by government agencies to develop policies to improve the ethical behaviour of the industry.
Resumo:
Thirty-five clients who had received counselling completed a letter to a friend describing in as much detail as possible what they had learned from counselling. The participants' written responses were analysed and classified using the Structure of Learning Outcomes (SOLO) taxonomy. The results suggested that an expanded SOLO offers a promising and exciting way to view the outcomes of counselling within a learning framework. If the SOLO taxonomy is found to be stable in subsequent research, and clients are easily able to be classified using the taxonomy, then this approach may have implications for the process of counselling. To maximise the learning outcomes, counsellors could use strategies and techniques to enhance their clients' learning.
Resumo:
Objective: To describe the extent and nature of demonstrated professional partnerships between occupational therapists and Aboriginal health workers in rural and remote communities of North Queensland. The study identifies ways in which professional partnerships improve client services and enhance occupational therapy outcomes through exploring the aspects of communication, collaboration and bridging cultural boundaries.---------- Design: Data collected via in-depth, semistructured telephone interviews. ---------- Setting: Aboriginal and mainstream health and human service organisations in rural and remote North Queensland. Rural and remote areas were identified using the Accessibility and Remoteness Index of Australia codes. ---------- Participants: Seven participants working in rural and remote areas of North Queensland, comprising four occupational therapists and three Aboriginal health workers. All participants were female. ---------- Results: Participants identified five core themes when describing the extent and nature of professional partnerships between occupational therapists and Aboriginal health workers. Themes include: professional interaction; perception of professional roles; benefits to the client; professional interdependence; and significance of Aboriginal culture. According to participants, when partnerships between occupational therapists and Aboriginal health workers were formed, clients received a more culturally appropriate service, were more comfortable in the presence of the occupational therapist, obtained a greater understanding of occupational therapy assessment and intervention, and felt valued in the health care process. ---------- Conclusions: This study substantiates the necessity for the formation of professional partnerships between occupational therapists and Aboriginal health workers. The findings suggest that participation in professional partnerships has positive implications for occupational therapists working with Aboriginal clients and Aboriginal health workers in rural and remote regions of North Queensland.
Resumo:
The decision as to which procurement system to adopt is a complex and challenging task for clients of construction projects. Despite a plethora of tools and techniques available for selecting a procurement method, clients are still uncertain about what method to adopt for a given construction project to achieve success. This paper examines ‘how and why’ procurement methods are selected by public sector clients in Queensland (QLD) and Western Australia (WA). Findings from workshops with senior managers in procurement selection revealed that traditional lump sum methods (TLS) are preferred even though alternative forms could be better suited for a given project. Participants of the workshops agreed that alternative procurement forms should be considered for projects but an embedded culture of uncertainty avoidance meant the selection of TLS methods. It was perceived that only a limited number of contractors operating in the marketplace have the resources and experience to deliver projects using the non-traditional methods.
Resumo:
There are about 2500 bridges in Queensland, Australia. Majority of these structures require significant repairs around the halfway mark of their design life with probably 1% or less reaching a 100 year design life. (Carse, 2005). This is due to the fact that bridges constructed in aggressive environments such as the coastal regions experience accelerated deterioration. As a result, maintaining the service delivery of these assets has become one of the important issues for the Queensland Department of Main Roads (QDMR).
Resumo:
In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways
Resumo:
Most buildings constructed in Australia must comply with the Building Code of Australia (BCA). Checking for compliance against the BCA is a major task for both designers and building surveyors. This project carries out a prototype research using the EDM Model Checker and the SMC Model Checker for automated design checking against the Building Codes of Australia for use in professional practice. In this project, we develop a means of encoding design requirements and domain specific knowledge for building codes and investigate the flexibility of building models to contain design information. After assessing two implementations of EDM and SMC that check compliance against deemed-to-satisfy provision of building codes relevant to access by people with disabilities, an approach to automated code checking using a shared object-oriented database is established. This project can be applied in other potential areas – including checking a building design for non-compliance of many types of design requirements. Recommendations for future development and use in other potential areas in construction industries are discussed
Resumo:
The quality of office indoor environments is considered to consist of those factors that impact the occupants according to their health and well-being and (by consequence) their productivity. Indoor Environment Quality (IEQ) can be characterized by four indicators: • Indoor air quality indicators • Thermal comfort indicators • Lighting indicators • Noise indicators. Within each indicator, there are specific metrics that can be utilized in determining an acceptable quality of an indoor environment based on existing knowledge and best practice. Examples of these metrics are: indoor air levels of pollutants or odorants; operative temperature and its control; radiant asymmetry; task lighting; glare; ambient noise. The way in which these metrics impact occupants is not fully understood, especially when multiple metrics may interact in their impacts. It can be estimated that the potential cost of lost productivity from poor IEQ may be much in excess of other operating costs of a building. However, the relative productivity impacts of each of the four indicators is largely unknown. The CRC Project ‘Regenerating Construction to Enhance Sustainability’ has a focus on IEQ impacts before and after building refurbishment. This paper provides an overview of IEQ impacts and criteria and the implementation of a CRC project that is currently researching these factors during the refurbishment of a Melbourne office building. IEQ measurements and their impacts will be reported in a future paper
Resumo:
This paper will summarise the findings from a study that explored the link between dwelling design, or type, and energy efficiencies in sub-tropical climates. An increasing number of government and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes at both sub-divisional and dwelling levels. The study used AccuRate, a new thermal modelling tool developed by CSIRO that responds to the need to improve ventilation modelling. The study found that dwellings developed in conjunction with the Departments of Housing and Public Works have set the benchmark. It provides a snapshot of the energy efficiency of a range of dwelling types found in recent subdivisions. However, the trend toward increasing urban densities may reduce the likelihood that cooling breezes will be available to cool dwellings. The findings are relevant to regulators, designers and industry in all states interested in reducing the energy used to cool dwellings in summer.
Resumo:
As our cities expand, developers are transforming more and more land to create our suburbs of the future. Developers and government bodies have a golden opportunity to design suburbs that are not only great places to live, but also are environmentally sensitive and sustainable. This is a unique opportunity, as significant changes after development are constrained by the configuration of the subdivision, and then by the construction of the dwellings. This paper explores some of these issues by presenting initial findings from the CRCCI, Sustainable Subdivisions Project. The Project examines the drivers and barriers that land developers face when trying to achieve sustainable subdivisions. This paper will review the results from a series of industry interviews and workshops and explore possible ways forward. In addition, the possible effect on the way future land subdivision is managed and planned as a result of recent changes in the energy efficiency provisions of the Building Code of Australia will be explored. This paper highlights problems that both builders and land developers may face through poor subdivision design. Finally an innovative program being driven by a major land developer will be introduced. The program aims to deliver over 400 energy and water efficient homes through a series of compulsory and voluntary schemes that the developer is designing, funding and implementing. This program is the first large-scale development in Australia that demonstrates how developers can help achieve environmentally sensitive and sustainable suburbs of the future.
Resumo:
There is evidence that many heating, ventilating & air conditioning (HVAC) systems, installed in larger buildings, have more capacity than is ever required to keep the occupants comfortable. This paper explores the reasons why this can occur, by examining a typical brief/design/documentation process. Over-sized HVAC systems cost more to install and operate and may not be able to control thermal comfort as well as a “right-sized” system. These impacts are evaluated, where data exists. Finally, some suggestions are developed to minimise both the extent of, and the negative impacts of, HVAC system over-sizing, for example: • Challenge “rules of thumb” and/or brief requirements which may be out of date. • Conduct an accurate load estimate, using AIRAH design data, specific to project location, and then resist the temptation to apply “safety factors • Use a load estimation program that accounts for thermal storage and diversification of peak loads for each zone and air handling system. • Select chiller sizes and staged or variable speed pumps and fans to ensure good part load performance. • Allow for unknown future tenancies by designing flexibility into the system, not by over-sizing. For example, generous sizing of distribution pipework and ductwork will allow available capacity to be redistributed. • Provide an auxiliary tenant condenser water loop to handle high load areas. • Consider using an Integrated Design Process, build an integrated load and energy use simulation model and test different operational scenarios • Use comprehensive Life Cycle Cost analysis for selection of the most optimal design solutions. This paper is an interim report on the findings of CRC-CI project 2002-051-B, Right-Sizing HVAC Systems, which is due for completion in January 2006.
Resumo:
Technology is continually changing, and evolving, throughout the entire construction industry; and particularly in the design process. One of the principal manifestations of this is a move away from team working in a shared work space to team working in a virtual space, using increasingly sophisticated electronic media. Due to the significant operating differences when working in shared and virtual spaces adjustments to generic skills utilised by members is a necessity when moving between the two conditions. This paper reports an aspect of a CRC-CI research project based on research of ‘generic skills’ used by individuals and teams when engaging with high bandwidth information and communication technologies (ICT). It aligns with the project’s other two aspects of collaboration in virtual environments: ‘processes’ and ‘models’. The entire project focuses on the early stages of a project (i.e. design) in which models for the project are being developed and revised. The paper summarises the first stage of the research project which reviews literature to identify factors of virtual teaming which may affect team member skills. It concludes that design team participants require ‘appropriate skills’ to function efficiently and effectively, and that the introduction of high band-width technologies reinforces the need for skills mapping and measurement.