525 resultados para Ecosystem management - Australia
Resumo:
The statutory arrangements for the management of natural resources in Australia confer powers of decision-making upon government agencies and, at the same time, restrict how these powers are to be exercised by reference either to stated criteria or in some instances to the public interest. These restrictions perform different functions according to their structure, form and language: for example they may be in the form of jurisdictional, deliberative or purposive rules. This article reviews how the offshore resources legislation of the Commonwealth and some examples of the onshore resources legislation of Queensland address the functions performed by the public interest in determining whether there is compliance with the principle of the rule of law.
Resumo:
This project is led by scientists in conservation decision appraisal and brings together a group of experts working across the Lake Eyre Basin (LEB). The LEB covers a sixth of Australia, with an array of globally significant natural values that are threatened by invasive plants, among other things. Managers at various levels are investing in attempts to control, contain and eradicate these invasive plant species, under severe time and resources limitations. To date there has been no basin-wide assessment of which weed management strategies and locations provide the best investments for maximising outcomes for biodiversity per unit cost. Further, there has been no assessment of the extent of ecosystem intactness that may be lost without effective invasive plant species management strategies. Given that there are insufficient resources to manage all invasive plant species everywhere, this information has the potential to improve current investment decisions. Here, we provide a prioritisation of invasive plant management strategies in the LEB. Prioritisation was based on cost-effectiveness for biodiversity benefits. We identify the key invasive plant species to target to protect ecosystem intactness across the bioregions of the LEB, the level of investment required and the likely reduction in invasive species dominance gained per dollar spent on each strategy. Our focus is on strategies that are technically and socially feasible and reduce the likelihood that high impact invasive plant species will dominate native ecosystems, and therefore change their form and function. The outputs of this work are designed to help guide decision-making and further planning and investment in weed management for the Basin. Experts in weed management, policy-making, community engagement, biodiversity and natural values of the Basin, attended a workshop and agreed upon 12 strategies to manage invasive plants. The strategies focused primarily on 10 weeds which were considered to have a high potential for broad, significant impacts on natural ecosystems in the next 50 years and for which feasible management strategies could be defined. Each strategy consisted of one or more supporting actions, many of which were spatially linked to IBRA (Interim Biogeographical Regionalisation of Australia) bioregions. The first strategy was an over-arching recommendation for improved mapping, information sharing, education and extension efforts in order to facilitate the more specific weed management strategies. The 10 more specific weed management strategies targeted the control and/or eradication of the following high-impact exotic plants: mesquite, parkinsonia, rubber vine, bellyache bush, cacti, mother of millions, chinee apple, athel pine and prickly acacia, as well as a separate strategy for eradicating all invasive plants from one key threatened ecological community, the GAB (Great Artesian Basin dependant) mound springs. Experts estimated the expected biodiversity benefit of each strategy as the reduction in area that an invasive plant species is likely to dominate in over a 50-year period, where dominance was defined as more than 30% coverage at a site. Costs were estimated in present day terms over 50 years largely during follow up discussions post workshop. Cost-effectiveness was then calculated for each strategy in each bioregion by dividing the average expected benefit by the average annual costs. Overall, the total cost of managing 12 invasive plant strategies over the next 50 years was estimated at $1.7 billion. It was estimated that implementation of these strategies would result in a reduction of invasive plant dominance by 17 million ha (a potential 32% reduction), roughly 14% of the LEB. If only targeting Weeds of National Significance (WONS), the total cost was estimated to be $113 million over the next 50 years. Over the next 50 years, $2.3 million was estimated to eradicate all invasive plant species from the Great Artesian Basin Mound Springs threatened ecological community. Prevention and awareness programs were another key strategy targeted across the Basin and estimated at $17.5 million in total over 50 years. The cost of controlling, eradicating and containing buffel grass were the most expensive, over $1.5 billion over 50 years; this strategy was estimated to result in a reduction in buffel grass dominance of a million ha in areas where this species is identified as an environmental problem. Buffel grass has been deliberately planted across the Basin for pasture production and is by far the most widely distributed exotic species. Its management is contentious, having economic value to many graziers while posing serious threats to biodiversity and sites of high cultural and conservation interest. The strategy for containing and locally eradicating buffel grass was a challenge to cost based on expert knowledge, possibly because of the dual nature of this species as a valued pastoral grass and environmental weed. Based on our conversations with experts, it appears that control and eradication programs for this species, in conservation areas, are growing rapidly and that information on the most cost-effective strategies for this species will continue to develop over time. The top five most cost-effective strategies for the entire LEB were for the management of: 1) parkinsonia, 2) chinee apple, 3) mesquite, 4) rubber vine and 5) bellyache bush. Chinee apple and mother of millions are not WONS and have comparatively small populations within the semi-arid bioregions of Queensland. Experts felt that there was an opportunity to eradicate these species before they had the chance to develop into high-impact species within the LEB. Prickly acacia was estimated to have one of the highest benefits, but the costs of this strategy were high, therefore it was ranked 7th overall. The buffel grass strategy was ranked the lowest (10th) in terms of cost effectiveness. The top five most cost-effective strategies within and across the bioregions were the management of: 1) parkinsonia in the Channel Country, 2) parkinsonia in the Desert Uplands, 3) mesquite in the Mitchell Grass Downs, 4) parkinsonia in the Mitchell Grass Downs, and 5) mother of millions in the Desert Uplands. Although actions for several invasive plant species like parkinsonia and prickly acacia were concentrated in the Queensland part of the LEB, the actions involved investing in containment zones to prevent the spread of these species into other states. In the NT and SA bioregions of the LEB, the management of athel pine, parkinsonia and cacti were the main strategies. While outside the scientific research goals of study, this work highlighted a number of important incidental findings that led us to make the following recommendations for future research and implementation of weed management in the Basin: • Ongoing stakeholder engagement, extension and participation is required to ensure this prioritisation effort has a positive impact in affecting on-ground decision making and planning. • Short term funding for weed management was identified as a major reason for failure of current efforts, hence future funding needs to be secure and ongoing. • Improved mapping and information sharing is essential to implement effective weed management. • Due to uncertainties in the outcomes and impacts of management options, strategies should be implemented as part of an adaptive management program. The information provided in this report can be used to guide investment for controlling high-impact invasive plant species for the benefits of biodiversity conservation. We do not present a final prioritisation of invasive plant strategies for the LEB, and we have not addressed the cultural, socio-economic or spatial components necessary for an implementation plan. Cost-effectiveness depends on the objectives used; in our case we used the intactness of ecosystems as a surrogate for expected biodiversity benefits, measured by the extent that each invasive plant species is likely to dominate in a bioregion. When other relevant factors for implementation are considered the priorities may change and some actions may not be appropriate in some locations. We present the costs, ecological benefits and cost-effectiveness of preventing, containing, reducing and eradicating the dominance of high impact invasive plants through realistic management actions over the next 50 years. In doing so, we are able to estimate the size of the weed management problem in the LEB and provide expert-based estimates of the likely outcomes and benefits of implementing weed management strategies. The priorities resulting from this work provide a prospectus for guiding further investment in management and in improving information availability.
Resumo:
Purpose The purpose of this paper is to explore and compare the asset management policies and practices of six Australian states – New South Wales, Victoria, Queensland, South Australia, Western Australia and Tasmania – to improve understanding of the policy context to best shape policy focus and guidelines. Australian state-wide asset management policies and guidelines are an emergent policy domain, generating a substantial body of knowledge. However, these documents are spread across the layers of government and are therefore largely fragmented and lack coherency. Design/methodology/approach The comparative study is based on the thematic mapping technique using the Leximancer software. Findings Asset management policies and guidelines of New South Wales and Victoria have more interconnected themes as compared to other states in Australia. Moreover, based on the findings, New South Wales has covered most of the key concepts in relation to asset management; the remaining five states are yet to develop a comprehensive and integrated approach to asset management policies and guidelines. Research limitations/implications This review and its findings have provided a number of directions on which government policies can now be better constructed and assessed. In doing so, the paper contributes to a coherent way forward to satisfy national emergent and ongoing asset management challenges. This paper outlines a rigorous analytical methodology to inform specific policy changes. Originality/value This paper provides a basis for further research focused on analyzing the context and processes of asset management guidelines and policies.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.
Resumo:
Aim To document current practice by dietitians in Australia and Canada in the nutrition management of Parkinson's disease. This will help identify priority areas for review and development of practice guidelines and direct future research. Methods Current practice in the phases of the Nutrition Care Plan was captured using an online survey distributed to Dietitians Association of Australia members and Practice-Based Evidence in Nutrition subscribers through their email newsletters. The results of the diagnosis, intervention and monitoring phases are presented here. Results Eighty-four dietitians responded. There was consistency in practice for nutrition issues that are encountered in other populations, such as malnutrition and constipation. There was more variation in practice in the nutrition issues that are more specific to Parkinson's disease, such as nutrition and meal interactions with medication. A lack of awareness of emerging treatments, such as deep brain stimulation surgery, appears to exist in the responding dietitians. Conclusions The variation in practice that was present for the nutrition issues specific to Parkinson's disease may reflect the lack of quality evidence and subsequently evidence-based guidelines in these areas. Work to provide background information about treatment options and to translate current evidence for the nutrition issues that are specific to Parkinson's disease into practice recommendations should be completed.
Resumo:
Mitigating the environmental effects of global population growth, climatic change and increasing socio-ecological complexity is a daunting challenge. To tackle this requires synthesis: the integration of disparate information to generate novel insights from heterogeneous, complex situations where there are diverse perspectives. Since 1995, a structured approach to inter-, multi- and trans-disciplinary1 collaboration around big science questions has been supported through synthesis centres around the world. These centres are finding an expanding role due to ever-accumulating data and the need for more and better opportunities to develop transdisciplinary and holistic approaches to solve real-world problems. The Australian Centre for Ecological Analysis and Synthesis (ACEAS
Resumo:
Background: Many preterm neonates display difficulty establishing suck-feeding competence in the weeks following birth. Ineffective management of transitional feeding issues may cause patient complications, and can contribute to increased length of stay. Aims: Given that many neonatal nurseries appear to vary in their neonatal feeding management practices, the aim of this study was to investigate and document the routine level of support and intervention currently provided for preterm neonates with transitional feeding issues across the various level II (special care) nurseries (SCNs) in Queensland, Australia. Methods: A questionnaire was mailed to all Queensland SCNs in 2005 (n = 36). The questionnaire contained a series of closed-choice and short-answer questions designed to obtain information from each SCN regarding their current practices for managing transitional feeding issues in preterm neonates. Results were confirmed during a follow-up phone call. Results: Responses were obtained from 29 SCNs (80.6%). None of these nurseries reported having any formal, written policies regarding the management of transitional feeding issues in preterm neonates. Wide variations were reported in relation to the suck-feeding assessments and interventions used by staff within the various SCNs. Of the 29 nurseries, 4 (13.8%) reported using checklists or assessments to judge readiness for suck-feeds, and 5 (17.2%) reported using pulse oximetry to judge tolerance of suck-feeding attempts. Eighteen SCNs (62.1%) reported offering some form of active intervention to assist neonates with transitional feeding issues, with the most common intervention techniques reported being non-nutritive sucking during tube feeds, pre-feeding oral stimulation, and actively pacing suck-feeds. Twenty-two SCNs (75.4%) reported having access to a lactation consultant to assist mothers with breastfeeding issues. Conclusions: Differences were reported in the routine management of transitional feeding issues in preterm neonates across the various SCNs in Queensland. It is suggested that evidence based guidelines need to be developed, and that, in order to do this, further research studies are required to determine current best practice, as well as to answer remaining questions. © 2008 Elsevier Ireland Ltd. All rights reserved.
Resumo:
The fundamental aim in fisheries management is to determine an optimal fishing effort for sustainably harvesting from a replenishable resource. The current management objective of Australia's Northern Prawn Fishery is to maximize the long-term net economic return following Australian government policy, resulting in an average recent catch of tiger prawn species of about 1,250 tons only. However, the maximum sustainable catch stated from different studies is around 3,000-4,700 tons. We also evaluated the net profit assuming that there was no buyback scheme in 2005 and the fishing fleet was kept at 89 vessels since 2005 and concluded that 40% more catch on average (2006-2009) and an additional total profit of A$ 17 million ( excluding crew cost) could have been gained in addition to the many millions of dollars of savings in the buyback scheme. These findings have great implications for future management in Australia and elsewhere because there is a grave concern of overfishing worldwide.
Resumo:
Australia's history of developing and managing the intellectual property rights of domestic innovations is – at best – mixed. The relevant immaturity of Australia's public sector commercialisation infrastructure has, over recent decades, been the subject of both stinging academic commentary and not insubstantial juridical disbelief. That said, improvements have been observed, and increasingly, private sector involvement in public sector innovation has allowed for a deepening refinement of domestic approaches to IP retention and ongoing management. Rather than a bare critique of Australia's IP management track-record, or a call for specific law reform, this manual engages at a more practical level some of the foundational questions that ought be asked by entities involved in the 'cleantech' industries. Beginning simply at what is IP and why it matters, this manual examines the models of IP management available to market participants around the world. The process of IP management is defined and assessed through a commercial lens; assessing the 'pros' and 'cons' of each management choice with a view to equipping the reader to determine which approach may be best adapted to their given clean tech project. The manual concludes with a brief survey of alternative models of Intellectual Property management, including relevant examples from overseas and prominent suggestions arising out of the academic discourse. It appears inevitable that the global warming challenge will prompt specific legislative, regulatory and multi-lateral responses by nation states, however, the ultimate form of any such response remains a highly contested political and social issue. Accordingly, the structure of this manual, and the discussion points raised herein, seek introduce the reader to some of the more contentious debates occurring around the world at the intersection between IP and climate change.
Resumo:
Ecosystem based management requires the integration of various types of assessment indicators. Understanding stakeholders' information preferences is important, in selecting those indicators that best support management and policy. Both the preferences of decision-makers and the general public may matter, in democratic participatory management institutions. This paper presents a multi-criteria analysis aimed at quantifying the relative importance to these groups of economic, ecological and socio-economic indicators usually considered when managing ecosystem services in a coastal development context. The Analytic Hierarchy Process (AHP) is applied within two nationwide surveys in Australia, and preferences of both the general public and decision-makers for these indicators are elicited and compared. Results show that, on average across both groups, the priority in assessing a generic coastal development project is for the ecological assessment of its impacts on marine biodiversity. Ecological assessment indicators are globally preferred to both economic and socio-economic indicators regardless of the nature of the impacts studied. These results are observed for a significantly larger proportion of decision-maker than general public respondents, questioning the extent to which the general public's preferences are well reflected in decision-making processes.
Resumo:
This paper introduces a policy-making support tool called ‘Micro-level Urban ecosystem Sustainability IndeX (MUSIX)’. The index serves as a sustainability assessment model that monitors six aspects of urban ecosystems, hydrology, ecology, pollution, location, design, and efficiency based on parcel-scale indicators. This index is applied in a case study investigation in the Gold Coast City, Queensland, Australia. The outcomes reveal that there are major environmental problems caused by increased impervious surfaces from growing urban development in the study area. The findings suggest that increased impervious surfaces are linked to increased surface runoff, car dependency, transport-related pollution, poor public transport accessibility, and unsustainable built environment. This paper presents how the MUSIX outputs can be used to guide policy-making through the evaluation of existing policies.
Resumo:
FRDC project 2008/306 Building economic capability to improve the management of marine resources in Australia was developed and approved in response to the widespread recognition and acknowledgement of the importance of incorporating economic considerations into marine management in Australia and of the persistent undersupply of suitably trained and qualified individuals capable of providing this input. The need to address this shortfall received broad based support and following widespread stakeholder consultation and building on previous unsuccessful State-based initiatives, a collaborative, cross-jurisdictional cross-institutional capability building model was developed. The resulting project sits within the People Development Program as part of FRDC’s ‘investment in RD&E to develop the capabilities of the people to whom the industry entrusts its future’, and has addressed its objectives largely through three core activities: 1. The Fisheries Economics Graduate Research Training Program which provides research training in fisheries/marine economics through enrolment in postgraduate higher degree studies at the three participating Universities; 2. The Fisheries Economics Professional Training Program which aims to improve the economic literacy of non-economist marine sector stakeholders and was implemented in collaboration with the Seafood Cooperative Research Centre through the Future Harvest Masterclass in Fisheries Economics; and, 3. The Australian Fisheries Economics Network (FishEcon) which aims to strengthen research in the area of fisheries economics by creating a forum in which fisheries economists, fisheries managers and Ph.D. students can share research ideas and results, as well as news of upcoming research opportunities and events. These activities were undertaken by a core Project team, comprising economic researchers and teachers from each of the four participating institutions (namely the University of Tasmania, the University of Adelaide, Queensland University of Technology and the Commonwealth Scientific and Industrial Research Organisation), spanning three States and the Commonwealth. The Project team reported to and was guided by a project Steering Committee. Commensurate with the long term nature of the project objectives and some of its activities the project was extended (without additional resources) in 2012 to 30th June 2015.
Resumo:
Cool roof coatings have a beneficial impact on reducing the heat load of a range of building types, resulting in reduced cooling energy loads. This study seeks to understand the extent to which cool roof coatings could be used as a residential demand side management (DSM) strategy for retrofitting existing housing in a constrained network area in tropical Australia where peak electrical demand is heavily influenced by residential cooling loads. In particular this study seeks to determine whether simulation software used for building regulation purposes can provide networks with the ‘impact certainty’ required by their DSM principles. The building simulation method is supported by a field experiment. Both numerical and experimental data confirm reductions in total consumption (kWh) and energy demand (kW). The nature of the regulated simulation software, combined with the diverse nature of residential buildings and their patterns of occupancy, however, mean that simulated results cannot be extrapolated to quantify benefits to a broader distribution network. The study suggests that building data gained from regulatory simulations could be a useful guide for potential impacts of widespread application of cool roof coatings in this region. The practical realization of these positive impacts, however, would require changes to the current business model for the evaluation of DSM strategies. The study provides seven key recommendations that encourage distribution networks to think beyond their infrastructure boundaries, recognising that the broader energy system also includes buildings, appliances and people.