Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Residents, businesses, local, state and national government stakeholders all want to have their say when airports expand or develop. While stakeholder engagement is increasingly a strategy employed for managing the tensions attracted to airport development, different stakeholders have different expectations and demands of airports. This requires different approaches to stakeholder engagement. Identifying the public interests that are at stake in developing airports provides an initial step towards building a platform for selecting and applying stakeholder engagement strategies in airport and more general infrastructure contexts. This paper uses the existing literature of public interests and values to build a general typology of public values for the stakeholders of airport development. A range of semi-privatised and state owned airport case studies from Europe have been used to demonstrate the universal nature of the identified values. The result is a framework that identifies both the substantive and procedural values, separated into local, state/regional and national levels of interest. The typology provides a generalised view of public interests in airport development; however, the public interests identified may be limited to more western oriented societies due to the skew of airport cases reviewed. Contributions are made to the literature with a typology of public values derived from existing knowledge and explored using empirical case examples. The provided typology enables research of airport development decision-making to delineate public interests both within and between stakeholder groups, and helps to explain the different perspectives that stakeholders have towards airport development. Future research may focus on refining the typology for different types of airport governance structures, such as differences between public values in state and market-led airport development; include more airport cases from eastern societies to draw parallels or differences between western and eastern societies; or utilise the typology as a framework for analysing changes in public interests of airports over time.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Residents, businesses, local, state and national government stakeholders all want to have their say when airports expand or develop. While stakeholder engagement is increasingly a strategy employed for managing the tensions attracted to airport development, different stakeholders have different expectations and demands of airports. This requires different approaches to stakeholder engagement. Identifying the public values that are at stake in developing airports provides an initial step towards building a platform for selecting and applying stakeholder engagement strategies in airport and more general infrastructure contexts. -------- This paper uses the existing literature of public values to build a general typology of public values for the stakeholders of airport development. A range of semi-privatised and state owned airport case studies from Europe have been used to demonstrate the universal nature of the identified values. The result is a framework that identifies both the substantive and procedural values, separated into local, state/regional and national levels of interest. The typology provides a generalised view of public values in airport development; however, the public values identified may be limited to more western oriented societies due to the skew of airport cases reviewed. --------- Contributions are made to the literature with a typology of public values derived from existing knowledge and explored using empirical case examples. The provided typology enables research of airport development decision-making to delineate public values both within and between stakeholder groups, and helps to explain the different perspectives that stakeholders have towards airport development. Future research may focus on refining the typology for different types of airport governance structures, such as differences between public values in state and market-led airport development; include more airport cases from eastern societies to draw parallels or differences between western and eastern societies; or utilise the typology as a framework for analysing changes in public values of airports over time.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background: The quality of stormwater runoff from ports is significant as it can be an important source of pollution to the marine environment. This is also a significant issue for the Port of Brisbane as it is located in an area of high environmental values. Therefore, it is imperative to develop an in-depth understanding of stormwater runoff quality to ensure that appropriate strategies are in place for quality improvement. ---------------- The Port currently has a network of stormwater sample collection points where event based samples together with grab samples are tested for a range of water quality parameters. Whilst this information provides a ‘snapshot’ of the pollutants being washed from the catchment/s, it does not allow for a quantifiable assessment of total contaminant loads being discharged to the waters of Moreton Bay. It also does not represent pollutant build-up and wash-off from the different land uses across a broader range of rainfall events which might be expected. As such, it is difficult to relate stormwater quality to different pollutant sources within the Port environment. ----------------- Consequently, this would make the source tracking of pollutants to receiving waters extremely difficult and in turn the ability to implement appropriate mitigation measures. Also, without this detailed understanding, the efficacy of the various stormwater quality mitigation measures implemented cannot be determined with certainty. --------------- Current knowledge on port stormwater runoff quality Currently, little knowledge exists with regards to the pollutant generation capacity specific to port land uses as these do not necessarily compare well with conventional urban industrial or commercial land use due to the specific nature of port activities such as inter-modal operations and cargo management. Furthermore, traffic characteristics in a port area are different to a conventional urban area. Consequently, as data inputs based on an industrial and commercial land uses for modelling purposes is questionable. ------------------ A comprehensive review of published research failed to locate any investigations undertaken with regards to pollutant build-up and wash-off for port specific land uses. Furthermore, there is very limited information made available by various ports worldwide about the pollution generation potential of their facilities. Published work in this area has essentially focussed on the water quality or environmental values in the receiving waters such as the downstream bay or estuary. ----------------- The Project: The research project is an outcome of the collaborative Partnership between the Port of Brisbane Corporation (POBC) and Queensland University of Technology (QUT). A key feature of this Partnership is the undertaking of ‘cutting edge’ research to strengthen the environmental custodianship of the Port area. This project aims to develop a port specific stormwater quality model to allow informed decision making in relation to stormwater quality improvement in the context of the increased growth of the Port. --------------- Stage 1 of the research project focussed on the assessment of pollutant build-up and wash-off using rainfall simulation from the current Port of Brisbane facilities with the longer-term objective of contributing to the development of ecological risk mitigation strategies for future expansion scenarios. Investigation of complex processes such as pollutant wash-off using naturally occurring rainfall events has inherent difficulties. These can be overcome using simulated rainfall for the investigations. ----------------- The deliverables for Stage 1 included the following: * Pollutant build-up and wash-off profiles for six primary land uses within the Port of Brisbane to be used for water quality model development. * Recommendations with regards to future stormwater quality monitoring and pollution mitigation measures. The outcomes are expected to deliver the following benefits to the Port of Brisbane: * The availability of Port specific pollutant build-up and wash-off data will enable the implementation of customised stormwater pollution mitigation strategies. * The water quality data collected would form the baseline data for a Port specific water quality model for mitigation and predictive purposes. * To be at the cutting-edge in terms of water quality management and environmental best practice in the context of port infrastructure. ---------------- Conclusions: The important conclusions from the study are: * It confirmed that the Port environment is unique in terms of pollutant characteristics and is not comparable to typical urban land uses. * For most pollutant types, the Port land uses exhibited lower pollutant concentrations when compared to typical urban land uses. * The pollutant characteristics varied across the different land uses and were not consistent in terms of the land use. Hence, the implementation of stereotypical structural water quality improvement devices could be of limited value. * The <150m particle size range was predominant in suspended solids for pollutant build-up as well as wash-off. Therefore, if suspended solids are targeted as the surrogate parameter for water quality improvement, this specific particle size range needs to be removed. ------------------- Recommendations: Based on the study results the following preliminary recommendations are made: * Due to the appreciable variation in pollutant characteristics for different port land uses, any water quality monitoring stations should preferably be located such that source areas can be easily identified. * The study results having identified significant pollutants for the different land uses should enable the development of a more customised water quality monitoring and testing regime targeting the critical pollutants. * A ‘one size fits all’ approach may not be appropriate for the different port land uses due to the varying pollutant characteristics. As such, pollution mitigation will need to be specifically tailored to suit the specific land use. * Any structural measures implemented for pollution mitigation to be effective should have the capability to remove suspended solids of size <150m. * Based on the results presented and the particularly the fact that the Port land uses cannot be compared to conventional urban land uses in relation to pollutant generation, consideration should be given to the development of a port specific water quality model.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The legal power to declare war has traditionally been a part of a prerogative to be exercised solely on advice that passed from the King to the Governor-General no later than 1942. In 2003, the Governor- General was not involved in the decision by the Prime Minister and Cabinet to commit Australian troops to the invasion of Iraq. The authors explore the alternative legal means by which Australia can go to war - means the government in fact used in 2003 - and the constitutional basis of those means. While the prerogative power can be regulated and/or devolved by legislation, and just possibly by practice, there does not seem to be a sound legal basis to assert that the power has been devolved to any other person. It appears that in 2003 the Defence Minister used his legal powers under the Defence Act 1903 (Cth) (as amended in 1975) to give instructions to the service head(s). A powerful argument could be made that the relevant sections of the Defence Act were not intended to be used for the decision to go to war, and that such instructions are for peacetime or in bello decisions. If so, the power to make war remains within the prerogative to be exercised on advice. Interviews with the then Governor-General indicate that Prime Minister Howard had planned to take the matter to the Federal Executive Council 'for noting', but did not do so after the Governor-General sought the views of the then Attorney-General about relevant issues of international law. The exchange raises many issues, but those of interest concern the kinds of questions the Governor-General could and should ask about proposed international action and whether they in any way mirror the assurances that are uncontroversially required for domestic action. In 2003, the Governor-General's scrutiny was the only independent scrutiny available because the legality of the decision to go to war was not a matter that could be determined in the High Court, and the federal government had taken action in March 2002 that effectively prevented the matter coming before the International Court of Justice

Relevância:

40.00% 40.00%

Publicador:

Resumo:

With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The concept of asset management is not a new but an evolving idea that has been attracting attention of many organisations operating and/or owning some kind of infrastructure assets. The term asset management have been used widely with fundamental differences in interpretation and usage. Regardless of the context of the usage of the term, asset management implies the process of optimising return by scrutinising performance and making key strategic decisions throughout all phases of an assets lifecycle (Sarfi and Tao, 2004). Hence, asset management is a philosophy and discipline through which organisations are enabled to more effectively deploy their resources to provide higher levels of customer service and reliability while balancing financial objectives. In Australia, asset management made its way into the public works in 1993 when the Australian Accounting Standard Board issued the Australian Accounting Standard 27 – AAS27. Standard AAS27 required government agencies to capitalise and depreciate assets rather than expense them against earnings. This development has indirectly forced organisations managing infrastructure assets to consider the useful life and cost effectiveness of asset investments. The Australian State Treasuries and the Australian National Audit Office was the first organisation to formalise the concepts and principles of asset management in Australia in which they defined asset management as “ a systematic, structured process covering the whole life of an asset”(Australian National Audit Office, 1996). This initiative led other Government bodies and industry sectors to develop, refine and apply the concept of asset management in the management of their respective infrastructure assets. Hence, it can be argued that the concept of asset management has emerged as a separate and recognised field of management during the late 1990s. In comparison to other disciplines such as construction, facilities, maintenance, project management, economics, finance, to name a few, asset management is a relatively new discipline and is clearly a contemporary topic. The primary contributors to the literature in asset management are largely government organisations and industry practitioners. These contributions take the form of guidelines and reports on the best practice of asset management. More recently, some of these best practices have been made to become a standard such as the PAS 55 (IAM, 2004, IAM, 2008b) in UK. As such, current literature in this field tends to lack well-grounded theories. To-date, while receiving relatively more interest and attention from empirical researchers, the advancement of this field, particularly in terms of the volume of academic and theoretical development is at best moderate. A plausible reason for the lack of advancement is that many researchers and practitioners are still unaware of, or unimpressed by, the contribution that asset management can make to the performance of infrastructure asset. This paper seeks to explore the practices of organisations that manage infrastructure assets to develop a framework of strategic infrastructure asset management processes. It will begin by examining the development of asset management. This is followed by the discussion on the method to be adopted for this paper. Next, is the discussion of the result form case studies. It first describes the goals of infrastructure asset management and how they can support the broader business goals. Following this, a set of core processes that can support the achievement of business goals are provided. These core processes are synthesised based on the practices of asset managers in the case study organisations.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Most infrastructure project developments are complex in nature, particularly in the planning phase. During this stage, many vague alternatives are tabled - from the strategic to operational level. Human judgement and decision making are characterised by biases, errors and the use of heuristics. These factors are intangible and hard to measure because they are subjective and qualitative in nature. The problem with human judgement becomes more complex when a group of people are involved. The variety of different stakeholders may cause conflict due to differences in personal judgements. Hence, the available alternatives increase the complexities of the decision making process. Therefore, it is desirable to find ways of enhancing the efficiency of decision making to avoid misunderstandings and conflict within organisations. As a result, numerous attempts have been made to solve problems in this area by leveraging technologies such as decision support systems. However, most construction project management decision support systems only concentrate on model development and neglect fundamentals of computing such as requirement engineering, data communication, data management and human centred computing. Thus, decision support systems are complicated and are less efficient in supporting the decision making of project team members. It is desirable for decision support systems to be simpler, to provide a better collaborative platform, to allow for efficient data manipulation, and to adequately reflect user needs. In this chapter, a framework for a more desirable decision support system environment is presented. Some key issues related to decision support system implementation are also described.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Rapidly developing information and telecommunication technologies and their platforms in the late 20th Century helped improve urban infrastructure management and influenced quality of life. Telecommunication technologies make it possible for people to deliver text, audio and video material using wired, wireless or fibre-optic networks. Technologies convergence amongst these digital devices continues to create new ways in which the information and telecommunication technologies are used. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices such as mobile phones. This chapter discusses the recent developments in telecommunication networks and trends in convergence technologies, their implications for urban infrastructure planning, and for the quality of life of urban residents.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Polarising the issue of governance is the increasingly acknowledged role of airports in regional economic development, both as significant sources of direct employment and as attractants of commerce through enhanced mobility (Vickerman, Spiekermann & Wegener 1999; Hakfoort, Poot & Rietveld 2001). Most airports were once considered spatially removed from their cities, but as cities have expanded their airports no longer sit distinct of the urban environment. This newfound spatial proximity means that decisions for land use and development on either city or airport land are likely to have impacts that affect one another in either or both the short- or long-term (Stevens, Baker and Freestone 2007). These impacts increase the demand for decision making to find ways of integrating strategies for future development to ensure that airport developments do not impede the sustainable growth of its city, and likewise that city developments do not impede the sustainable growth of its airport (Gillen 2006). However questions of how, under what conditions, and to what extent decision making integration might be suitable for “airport regions” are yet to be explored let alone answered.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The economiser is a critical component for efficient operation of coal-fired power stations. It consists of a large system of water-filled tubes which extract heat from the exhaust gases. When it fails, usually due to erosion causing a leak, the entire power station must be shut down to effect repairs. Not only are such repairs highly expensive, but the overall repair costs are significantly affected by fluctuations in electricity market prices, due to revenue lost during the outage. As a result, decisions about when to repair an economiser can alter the repair costs by millions of dollars. Therefore, economiser repair decisions are critical and must be optimised. However, making optimal repair decisions is difficult because economiser leaks are a type of interactive failure. If left unfixed, a leak in a tube can cause additional leaks in adjacent tubes which will need more time to repair. In addition, when choosing repair times, one also needs to consider a number of other uncertain inputs such as future electricity market prices and demands. Although many different decision models and methodologies have been developed, an effective decision-making method specifically for economiser repairs has yet to be defined. In this paper, we describe a Decision Tree based method to meet this need. An industrial case study is presented to demonstrate the application of our method.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

From 27 January to 8 February during the summer of 2009, southern Australia experienced one of the nation‘s most severe heatwaves. Governments, councils, utilities, hospitals and emergency response organisations and the community were largely underprepared for an extreme event of this magnitude. This case study targets the experience and challenges faced by decision makers and policy makers and focuses on the major metropolitan areas affected by the heatwave — Melbourne and Adelaide. The study examines the 2009 heatwave‘s characteristics; its impacts (on human health, infrastructure and human services); the degree of adaptive capacity (vulnerability and resilience) of various sectors, communities and individuals; and the reactive responses of government and emergency and associated services and their effectiveness. Barriers and challenges to adaptation and increasing resilience are also identified and further areas for research are suggested. This study does not include details of the heatwave‘s effects beyond Victoria and South Australia, or its economic impacts, or of Victoria‘s 'Black Saturday‘ bushfires.