800 resultados para Construction Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Midwest Independent Transmission System Operator (MISO) has experienced significant amounts of wind power development within the last decade. The MISO footprint spans the majority of the upper Midwest region of the country, from the Dakotas to Indiana and as far east as Michigan. These areas have a rich wind energy resource. States in the MISO footprint have passed laws or set goals that require load serving entities to supply a portion of their load using renewable energy. In order to meet these requirements, significant investments are needed to build the transmission infrastructure necessary to deliver the power from these often remote wind energy resources to the load centers. This paper presents some of the transmission planning related work done at MISO which was largely influenced by current and future needs for increased wind power generation in the footprint. Specifically, topics covered are generator interconnection, long-term planning coordination, and cost-allocation for new transmission lines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the past few years, the Midwest ISO has experienced a surge in requests to interconnect large amounts of wind generation, driven largely by a favorable political environment and an abundant wind resource in the Midwestern US. This tremendous influx of proposed generators along with a highly constrained transmission system adversely impacted interconnection queue processing, resulting in an unmanageable backlog. Under these circumstances, Midwest ISO successfully reformed the interconnection tariff to improve cycle times and provide increased certainty to interconnection customers. One of the key features of the reformed queue process is the System Planning and Analysis (SPA) phase which allows integration of the interconnection studies with regional transmission planning. This paper presents a brief background of the queue reform effort and then delves deeply in to the work performed at the Midwest ISO during the first SPA cycle - the study approach, the challenges faced in having to study over 50,000 MWs of wind generation and the effective solutions designed to complete these studies within tariff timelines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study tested the utility of the Theory of Planned Behaviour (TPB) to predict mothers’ decisions to ensure their child engages in sun-protective behaviours. Mothers (N = 162) of children aged four or five years completed standard TPB items (attitude, subjective norm, perceived behavioural control, intention) and additional variables of role construction, mothers’ own sun safe behaviour, planning and past behaviour. One week later, participants (N = 116) reported their behaviour. Results found support for the TPB constructs, role construction, past behaviour and the mediating role of planning. These findings can inform strategies to prevent skin cancer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This case study reports on the impact and business transformation of an IMP³rove assessment and follow-up workshop on Australian SME LEVESYS (www.levesys.com), which was undertaken by QMI Solutions. Innovation was not a foreign term to the company, which focuses on the development of enterprise resource planning (ERP) software for the Australian construction sector. However, before seeing and undergoing the IMP³rove process, this company had difficulty articulating their innovation problems and, therefore, had not achieved growth targets from its R&D efforts. This case study highlights the role of IMP³rove in assisting LEVESYS to take the first step in transforming itself through innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is an industry of major strategic importance. Its level of productivity has a significant effect on national economic growth. Productivity indicators are examined. The indicators consist of labour productivity, capital productivity, labour competitiveness, capital intensity and added value content of data, which are obtained from the published census/biannual surveys of the construction industry between the years 1999 and 2011 from the Department of Statistics of Malaysia. The results indicated that there is an improvement in the labour productivity, but the value-added content is declining. The civil engineering and special trades subsectors are more productive than the residential and non-residential subsectors in terms of labour productivity because machine-for-labour substitution is a more important process in those subsectors. The capital-intensive characteristics of civil engineering and special trade works enable these subsectors to achieve higher added value per labour cost but not the capital productivity. The added value per labour cost is lower in larger organizations despite higher capital productivity. However, the capital intensity is lower and unit labour cost is higher in the larger organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Problem, research strategy, and findings: The privatization of airports in Australia included airport property development rights, regulated only by federal, not local, land use control. Airports then developed commercial and retail centers outside local community plans, resulting in a history of poor coordination of planning and reflecting strong differences between public and private values in the role of the airport. Private owners embraced the concept of an Airport City, envisioning the airport as a portal of global infrastructure, whereas public planning agencies are struggling with infrastructure coordination and the development of real estate outside of the local planning regulations. Stakeholder workshops were conducted in each of the cases where key stakeholders from airports, regulating agencies, state and local governments participated in identifying key issues impacting the planning in and around airports. This research demonstrates that if modes of infrastructure provision change significantly (such as through privatization of public services), that transformation would best be accompanied by comprehensive changes in planning regimes to accommodate metropolitan and airport interdependencies. Privatization has exacerbated the poor coordination of planning in the past, and a focus on coordination between public and private infrastructure planning is needed to overcome differences in values and interests. Takeaway for practice: Governance styles differ considerably between public agencies and private corporations. Planners should understand the drivers and value differences to better coordinate infrastructure delivery and effective planning. Research support: The Airport Metropolis Research Project under the Australian Research Council's Linkage Projects funding scheme (LP0775225).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With significant population growth experienced in South East Queensland over the past two decades and a high rate of growth expected to continue in coming decades, the Queensland Government is promoting urban consolidation planning policies to manage growth sustainably. Multi-residential buildings will play an important role in facilitating the increased densities which urban consolidation policies imply. However, a major flood event in January 2011 has brought to light the vulnerability of certain types of multi-residential typologies to power outages. The crisis conditions exposed how contemporary building design and construction practices, coupled with regulatory and planning issues, appear to have compromised the resilience and habitability of multi-storey residential buildings. In the greater urban area of Brisbane, Queensland, the debilitating dependence that certain types of apartment buildings have on mains electricity was highlighted by residents’ experiences of the Brisbane River flood disaster, before, during and after the event. This research examined high density residential buildings in West End, Brisbane, an inner city suburb which was severely affected by the flood and is earmarked for significant urban densification under the Brisbane City Plan. Medium-to-high-density residential buildings in the suburb were mapped in flooded and non-flooded locations and a database containing information about the buildings was created. Parameters included date of construction, number of storeys, systems of access and circulation, and potential for access to natural light and ventilation for habitable areas. A series of semi-structured interviews were conducted with residents involved in the owners’ management committees of several buildings to verify information the mapping could not provide. The interviews identified a number of critical systems failures due to power outage which had a significant impact on residents’ wellbeing, comfort and safety. Building services such as lifts, running water, fire alarms, security systems and air-conditioning ceased to operate when power was disconnected to neighbourhoods and buildings in anticipation of rising flood waters. Lack of access to buildings and dwellings, lack of safety, lack of building security, and lack of thermal comfort affected many residents whether or not their buildings were actually subjected to inundation, with some buildings rendered uninhabitable for a prolonged period. The extent of the impact on residents was dramatically influenced by the scale and type of building inhabited, with those dwelling in buildings under a 25m height limit, with a single lift, found to be most affected. The energy-dependency and strong trend of increasing power demands of high-rise buildings is well-documented. Extended electricity outages such as the one brought about by the 2011 flood in Queensland are likely to happen more frequently than the 50-year average of the flood event itself. Electricity blackouts can result from a number of man-made or natural causes, including shortages caused by demand exceeding supply. This paper highlights the vulnerability of energy-dependent buildings to power outages and investigates options for energy security for occupants of multi-storey buildings and makes recommendations to increase resilience and general liveability in multi-residential buildings in the subtropics through design modifications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the advent of large-scale wind farms and their integration into electrical grids, more uncertainties, constraints and objectives must be considered in power system development. It is therefore necessary to introduce risk-control strategies into the planning of transmission systems connected with wind power generators. This paper presents a probability-based multi-objective model equipped with three risk-control strategies. The model is developed to evaluate and enhance the ability of the transmission system to protect against overload risks when wind power is integrated into the power system. The model involves: (i) defining the uncertainties associated with wind power generators with probability measures and calculating the probabilistic power flow with the combined use of cumulants and Gram-Charlier series; (ii) developing three risk-control strategies by specifying the smallest acceptable non-overload probability for each branch and the whole system, and specifying the non-overload margin for all branches in the whole system; (iii) formulating an overload risk index based on the non-overload probability and the non-overload margin defined; and (iv) developing a multi-objective transmission system expansion planning (TSEP) model with the objective functions composed of transmission investment and the overload risk index. The presented work represents a superior risk-control model for TSEP in terms of security, reliability and economy. The transmission expansion planning model with the three risk-control strategies demonstrates its feasibility in the case study using two typical power systems

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Precise protein quantification and recommendation is essential in clinical dietetics, particularly in the management of individuals with chronic kidney disease, malnutrition, burns, wounds, pressure ulcers, and those in active sports. The Expedited 10g Protein Counter (EP-10) was developed to simplify the quantification of dietary protein for assessment and recommendation of protein intake.1 Instead of using separate protein exchanges for different food groups to quantify the dietary protein intake of an individual, every exchange in the EP-10 accounts for an exchange each of 3g non-protein-rich food and 7g protein-rich food (Table 1). The EP-10 was recently validated and published in the Journal of Renal Nutrition recently.1 This study demonstrated that using the EP-10 for dietary protein intake quantification had clinically acceptable validity and reliability when compared with the conventional 7g protein exchange while requiring less time.2 In clinical practice, the use of efficient, accurate and practical methods to facilitate assessment and treatment plans is important. The EP-10 can be easily implemented in the nutrition assessment and recommendation for a patient in the clinical setting. This patient education tool was adapted from materials printed in the Journal of Renal Nutrition.1 The tool may be used as presented or adapted to assist patients to achieve their recommended daily protein intake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainable development has long been promoted as the best answer to the world’s environmental problems. This term has generated mass appeal as it implies that both the development of the built environment and its associated resource consumption can be achieved without jeopardising the natural environment. In the urban context, sustainability issues have been reflected in the promotion of sustainable urban development, which emphasises the sensible exploitation of scarce natural resources for urbanisation in a manner that allows future generations to repeat the process. This chapter highlights attempts to promote sustainable urban development through an integration of three important considerations: planning, development and the ecosystem. It highlights the fact that spatial planning processes were traditionally driven by economic and social objectives, and rarely involved promoting the sustainability agenda to achieve a sustainable urban future. As a result, rapid urbanisation has created a variety of pressures on the ecosystem upon which we rely. It is believed that the integration of the urban planning and development processes within the limitations of the ecosystem, monitored by a sustainability assessment mechanism, would offer a better approach to maintaining sustainable resource use without compromising urban development.