619 resultados para Treatment planning
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Background: The incidence of mandibular fractures in the Northern Territory of Australia is very high, especially among Indigenous people. Alcohol intoxication is implicated in the majority of facial injuries, and substance use is therefore an important target for secondary prevention. The current study tests the efficacy of a brief therapy, Motivational Care Planning, in improving wellbeing and substance misuse in youth and adults hospitalised with alcohol-related facial trauma. Methods and design: The study is a randomised controlled trial with 6 months of follow-up, to examine the effectiveness of a brief and culturally adapted intervention in improving outcomes for trauma patients with at-risk drinking admitted to the Royal Darwin Hospital maxillofacial surgery unit. Potential participants are identified using AUDIT-C questionnaire. Eligible participants are randomised to either Motivational Care Planning (MCP) or Treatment as Usual (TAU). The outcome measures will include quantity and frequency of alcohol and other substance use by Timeline Followback. The recruitment target is 154 participants, which with 20% dropout, is hoped to provide 124 people receiving treatment and follow-up. Discussion: This project introduces screening and brief interventions for high-risk drinkers admitted to the hospital with facial trauma. It introduces a practical approach to integrating brief interventions in the hospital setting, and has potential to demonstrate significant benefits for at-risk drinkers with facial trauma.
Resumo:
Australian airports have emerged as important urban activity centres over the past decade as a result of privatisation. A range of reciprocal airport and regional impacts now pose considerable challenges for both airport operation and the surrounding urban and regional environment. The airport can no longer be managed solely as a specialised transport entity in isolation from the metropolis that it serves. In 2007 a multidisciplinary Australian Research Council Linkage Project (LP 0775225) was funded to investigate the changing role of airports in Australia. This thesis is but one component of this collaborative research effort. Here the issues surrounding the policy and practice of airport and regional land use planning are explored, analysed and detailed. This research, for the first time, assembles a distinct progression of the wider social, economic, technological and environmental roles of the airport within the Australian airport literature from 1914 – 2011. It recognises that while the list of airport and regional impacts has grown through time, treatment within practice and the literature has largely remained highly specialised and contained within disciplinary paradigms. The first publication of the thesis (Chapter 2) acknowledges that the changing role of airports demands the establishment of new models of airport planning and development. It argues that practice and research requires a better understanding of the reciprocal impacts of airports and their urban catchments. The second publication (Chapter 3) highlights that there is ad hoc examination and media attention of high profile airport and regional conflict, but little empirical analysis or understanding of the extent to which all privatised Australian airports are intending to develop. The conceptual and methodological significance of this research is the development of a national land use classification system for on-airport development. This paper establishes the extent of on-airport development in Australia, providing insight into the changing land use and economic roles of privatised airports. The third publication (Chapter 4) details new and significant interdependencies for airport and regional development in consideration of the progression of airports as activity centres. Here the model of an ‘airport metropolis’ is offered as an organising device and theoretical contribution for comprehending the complexity and planning of airport and regional development. It delivers a conceptual framework for both research and policy, which acknowledges the reciprocal impacts of economic development, land use, infrastructure and governance ‘interfaces’. In a timely and significant concurrence with this research the Australian Government announced and delivered a National Aviation Policy Review (2008 – 2009). As such the fourth publication (Chapter 5) focuses on the airport and urban planning aspects of the review. This paper also highlights the overall policy intention of facilitating broader airport and regional collaborative processes. This communicative turn in airport policy is significant in light of the communicative theoretical framework of the thesis. The fifth paper of the thesis (Chapter 6) examines three Australian case studies (Brisbane, Adelaide and Canberra) to detail the context of airport and regional land use planning and to apply the airport metropolis model as a framework for research. Through the use of Land Use Forums, over 120 airport and regional stakeholders are brought together to detail their perspectives and interactions with airport and regional land use planning. An inductive thematic analysis of the results identifies three significant themes which contribute to the fragmentation of airport and regional and land use planning: 1) inadequate coordination and disjointed decision-making; 2) current legislative and policy frameworks; and 3) competing stakeholder priorities and interests. Building on this new knowledge, Chapter 7 details the perceptions of airport and local, state and territory government stakeholders to land use relationships, processes and outcomes. A series of semi-structured interviews are undertaken in each of the case studies to inform this research. The potential implications for ongoing communicative practice are discussed in conclusion. The following thesis represents an incremental and cumulative research process which delivers new knowledge for the practical understanding and research interpretation of airport and regional land use planning practice and policy. It has developed and applied a robust conceptual framework which delivers significant direction for all stakeholders to better comprehend the relevance of airports in the urban character and design of our cities.
Resumo:
The planning of IMRT treatments requires a compromise between dose conformity (complexity) and deliverability. This study investigates established and novel treatment complexity metrics for 122 IMRT beams from prostate treatment plans. The Treatment and Dose Assessor software was used to extract the necessary data from exported treatment plan files and calculate the metrics. For most of the metrics, there was strong overlap between the calculated values for plans that passed and failed their quality assurance (QA) tests. However, statistically significant variation between plans that passed and failed QA measurements was found for the established modulation index and for a novel metric describing the proportion of small apertures in each beam. The ‘small aperture score’ provided threshold values which successfully distinguished deliverable treatment plans from plans that did not pass QA, with a low false negative rate.
Resumo:
Purpose To establish whether the use of a passive or active technique of planning target volume (PTV) definition and treatment methods for non-small cell lung cancer (NSCLC) deliver the most effective results. This literature review assesses the advantages and disadvantages in recent studies of each, while assessing the validity of the two approaches for planning and treatment. Methods A systematic review of literature focusing on the planning and treatment of radiation therapy to NSCLC tumours. Different approaches which have been published in recent articles are subjected to critical appraisal in order to determine their relative efficacy. Results Free-breathing (FB) is the optimal method to perform planning scans for patients and departments, as it involves no significant increase in cost, workload or education. Maximum intensity projection (MIP) is the fastest form of delineation, however it is noted to be less accurate than the ten-phase overlap approach for computed tomography (CT). Although gating has proven to reduce margins and facilitate sparing of organs at risk, treatment times can be longer and planning time can be as much as 15 times higher for intensity modulated radiation therapy (IMRT). This raises issues with patient comfort and stabilisation, impacting on the chance of geometric miss. Stereotactic treatments can take up to 3 hours to treat, along with increases in planning and treatment, as well as the additional hardware, software and training required. Conclusion Four-dimensional computed tomography (4DCT) is superior to 3DCT, with the passive FB approach for PTV delineation and treatment optimal. Departments should use a combination of MIP with visual confirmation ensuring coverage for stage 1 disease. Stages 2-3 should be delineated using ten-phases overlaid. Stereotactic and gated treatments for early stage disease should be used accordingly; FB-IMRT is optimal for latter stage disease.
Resumo:
Objectives To examine the level of knowledge of doctors about the law on withholding and withdrawing life-sustaining treatment from adults who lack decision-making capacity, and factors associated with a higher level of knowledge. Design, setting and participants Postal survey of all specialists in emergency medicine, geriatric medicine, intensive care, medical oncology, palliative medicine, renal medicine and respiratory medicine on the AMPCo Direct database in New South Wales, Victoria and Queensland. Survey initially posted to participants on 18 July 2012 and closed on 31 January 2013. Main outcome measures Medical specialists’ levels of knowledge about the law, based on their responses to two survey questions. Results Overall response rate was 32%. For the seven statements contained in the two questions about the law, the mean knowledge score was 3.26 out of 7. State and specialty were the strongest predictors of legal knowledge. Conclusions Among doctors who practise in the end-of-life field, there are some significant knowledge gaps about the law on withholding and withdrawing life-sustaining treatment from adults who lack decision-making capacity. Significant consequences for both patients and doctors can flow from a failure to comply with the law. Steps should be taken to improve doctors’ legal knowledge in this area and to harmonise the law across Australia.
Resumo:
Background: To effectively care for people who are terminally ill, including those without decision-making capacity, palliative care physicians must know and understand the legal standing of Advance Care Planning (ACP) in their jurisdiction of practice. This includes the use of advance directives/living wills (ADs) and substitute decision-makers (SDMs) who can legally consent to or refuse treatment if there is no valid AD. Aim: The study aimed to investigate the knowledge, attitudes and practices of medical specialists most often involved in end-of-life care in relation to the law on withholding/ withdrawing life-sustaining treatment (WWLST) from adults without decision-making capacity. Design/participants: A pre-piloted survey was posted to specialists in palliative, emergency, geriatric, renal and respiratory medicine, intensive care and medical oncology in three Australian States. Surveys were analysed using SPSS20 and SAS 9.3. Results: The overall response rate was 32% (867/2702); 52% from palliative care specialists. Palliative Care specialists and Geriatricians had significantly more positive attitudes towards the law (χ242 = 94.352; p < 0.001) and higher levels of knowledge about the WWLST law (χ27 = 30.033; p < 0.001), than did the other specialists, while still having critical gaps in their knowledge. Conclusions: A high level of knowledge of the law is essential to ensure that patients’ wishes and decisions, expressed through ACP, are respected to the maximum extent possible within the law, thereby according with the principles and philosophy of palliative care. It is also essential to protect health professionals from legal action resulting from unauthorised provision or removal of treatment.