430 resultados para Public contracts Queensland
Resumo:
This thesis examines the changing relationships between television, politics, audiences and the public sphere. Premised on the notion that mediated politics is now understood “in new ways by new voices” (Jones, 2005: 4), and appropriating what McNair (2003) calls a “chaos theory” of journalism sociology, this thesis explores how two different contemporary Australian political television programs (Sunrise and The Chaser’s War on Everything) are viewed, understood, and used by audiences. In analysing these programs from textual, industry and audience perspectives, this thesis argues that journalism has been largely thought about in overly simplistic binary terms which have failed to reflect the reality of audiences’ news consumption patterns. The findings of this thesis suggest that both ‘soft’ infotainment (Sunrise) and ‘frivolous’ satire (The Chaser’s War on Everything) are used by audiences in intricate ways as sources of political information, and thus these TV programs (and those like them) should be seen as legitimate and valuable forms of public knowledge production. It therefore might be more worthwhile for scholars to think about, research and teach journalism in the plural: as a series of complementary or antagonistic journalisms, rather than as a single coherent entity.
Resumo:
Encouraging Ethics and Preventing Corruption brings theory and practice together in addressing the question: How are we to be ethical in public life and through public institutions? It is a major contribution to public sector ethics within Australia and internationally because it provides an exhaustive analysis of reform across a decade in one jurisdiction, Queensland, and then proceeds to itemise a best practice integrity system or ethics regime. Drawing on the extensive research of two of Australia's leading practical ethicists, this text is essential reading for all students and practitioners of applied and professional ethics in the public sphere. Part A of the text provides a preferred theoretical and conceptual framework which both justifies and guides the development of a public sector ethics regime. Part B examines the place of the individual within a world of institutional ethics. Part C outlines the Queensland governance reforms introduced since 1989 following the Fitzgerald Inquiry which exposed corruption in the police and ministry. The final chapter, the 'Epilogue', gathers the insights of earlier chapters and suggests a more explicitly ethics-centred approach to governance reform that may take us 'beyond best practice'. Clearly, while it is the Australian context we have in mind, we are confident that this is a text which addresses the quest for integrity and ethics in government wherever society is committed to social and liberal democratic ideals.
Resumo:
This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.
Resumo:
This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.
Resumo:
The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.
Resumo:
With the rising levels of CO2 in the atmosphere, low-emission technologies with carbon dioxide capture and storage (CCS) provide one option for transforming the global energy infrastructure into a more environmentally, climate sustainable system. However, like many technology innovations, there is a social risk to the acceptance of CCS. This article presents the findings of an engagement process using facilitated workshops conducted in two communities in rural Queensland, Australia, where a demonstration project for IGCC with CCS has been announced. The findings demonstrate that workshop participants were concerned about climate change and wanted leadership from government and industry to address the issue. After the workshops, participants reported increased knowledge and more positive attitudes towards CCS, expressing support for the demonstration project to continue in their local area. The process developed is one that could be utilized around the world to successfully engage communities on the low carbon emission technology options.
Resumo:
This report undertakes an exploratory analysis of Construction Innovation research projects in order to answer the question “What are the public policy implications of Construction Innovation research?”
Resumo:
The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.
Resumo:
The rate of water reform in Australia is gathering pace with Federal and State initiatives promoting a more integrated approach to water management. This approach encompasses a more competitive environment and a greater role for the private sector. There is a growing recognition of the importance of water recycling in these initiatives and the need to provide opportunities for its development. In March 2008 the Productivity Commission published its discussion paper on urban water reform (Productivity Commission, 2008). The paper cited inadequate institutional arrangements for the management of Australian urban water resources and noted the benefits to be gained from a comprehensive public review of urban water management. This development can be supported through the promotion of a sewer mining industry. This industry, offers flexible and innovative solutions to water recycling demands in a variety of situations and structures. In addition it has the capability of satisfying government competition and private sector policy initiatives.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.
Resumo:
Establishing a framework for measuring the performance of public sector programs is fraught with dangers. Many public sector organisations are satisfied with measuring activity in programs and fail to see the need for establishing a framework that will meet the needs of participants and measure outcomes as well as activities. This paper explores how a government department in Queensland went about establishing a performance management framework to measure the outcomes and activities in a program that was a public private partnership. Findings indicate that using an iterative consultative approach performance measure can be put in place that are meaningful and assist the participants to review the program.
Resumo:
As the problems involving infrastructure delivery have become more complex and contentious, there has been an acknowledgement that these problems cannot be resolved by any one body working alone. This understanding has driven multi-sectoral collaboration and has led to an expansion of the set of actors, including stakeholders, who are now involved in delivery of infrastructure projects and services. However, more needs to be understood about how to include stakeholders in these processes and the optimal ways of developing the requisite combination of stakeholders to achieve effective outcomes. This thesis draws on stakeholder theory and governance network theory to obtain insights into how three networks delivering public outcomes within the Roads Alliance in Queensland engage with stakeholders in the delivery of complex and sensitive infrastructure services and projects. New knowledge about stakeholders will be obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory (Mitchell, Agle, and Wood, 1997), ladder of stakeholder management and engagement (Friedman and Miles, 2006) and the model of stakeholder engagement and moral treatment of stakeholders (Greenwood, 2007). By applying this model, the broad research question: “Who or what decides how stakeholders are optimally engaged by governance networks delivering public outcomes?” will be addressed. The case studies will test a theoretical model of stakeholder salience and engagement which links strategic management decisions about stakeholder salience with the quality and quantity of engagement strategies for engaging different types of stakeholders. The outcomes of this research will contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory will be extended by showing how governance networks interact with stakeholders through the concepts of stakeholder salience and engagement. From a practical perspective this research will provide governance networks with an indication of how to optimise engagement with different types of stakeholders.
Resumo:
Background: Although low back pain (LBP) is an important issue for the health profession, few studies have examined LBP among occupational therapy students. Purpose. To investigate the prevalence and distribution of LBP, its adverse sequelae; and to identify potential risk factors.----------- Methods: In 2005, a self-reported questionnaire was administered to occupational therapy students in Northern Queensland.----------- Findings: The 12-month period-prevalence of LBP was 64.6%. Nearly half (46.9%) had experienced pain for over 2 days, 38.8% suffered LBP that affected their daily lives, and 24.5% had sought medical treatment. The prevalence of LBP ranged from 45.5 to 77.1% (p=0.004), while the prevalence of LBP symptoms persisting longer than two days was 34.1 to 62.5% (p=0.020). Logistic regression analysis indicated that year of study and weekly computer usage were statistically-significant LBP risk factors.----------- Implications: The occupational therapy profession will need to further investigate the high prevalence of student LBP identified in this study.