192 resultados para Hospitals -- Australia -- Risk management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Arguing the value of effective HRM practice has long been a focus in the HRM literature. However, there is also a case for identifying the risks presented by inappropriate or absent HRM practices. Although risk management has been established in the broader management literature for over two decades, human resource related risks have not featured as prominently as other types of risks. HRM as a discipline has a role to play in addressing this situation and raising awareness of human resource issues as risks for the organization. A review of papers published since the year 2000 in a broad range of high quality management journals, identifies that limited research has thus far taken a risk management perspective on human resources. Although the HRM and risk management disciplines stand to benefit from drawing the two areas together, this review concludes that further research and development of the phenomenon of human resource risk management is needed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Directors and Officers Liability Insurance (“D&O insurance”) has grown and evolved rapidly over the past 80 years to assume an important position in most corporations’ corporate governance and risk management strategies. This article focuses upon certain topical matters of particular concern to directors and officers including the availability of defence costs where a D&O policy is subject to a statutory charge; the commercial desirability of stand-alone “A-side” coverage, being the cover provided directly to directors and officers for loss resulting from claims made against them for wrongful acts; the impact of fraud and/or dishonesty upon D&O cover; and disclosure of the nature and extent of D&O cover to the directors and officers themselves and to third parties – in the latter case such access frequently being necessary to determine the economic viability of pursuing a proposed action against a company and its directors and officers.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Protection of “critical infrastructure” has become a major issue for govern- ments worldwide. Yet in Australia, as in many other countries, including the United States, an estimated 90% of critical infrastructure is privately owned or operated commercially – in other words, critical infrastructure protection is not the exclusive domain of government. As a result, information sharing between government and the private sector has become a vitally important component of effective risk management. However, establishing effective arrangements of this kind between the public and private sector needs to take account of existing regimes of access and public disclosure which relate to government-held documents; in particular, that which is established by freedom of information (FOI) legislation. This article examines the extent to which the current Commonwealth FOI regime is likely to act as an impediment to the private sector operators of critical infrastructure participat- ing in government-operated information sharing arrangements. By examining developments in other jurisdictions, principally the United States, the article considers whether amendments to the current Australian FOI regime are necessary to ensure effective participation, consistent with the underlying object and purpose of FOI.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Accessibility to housing for low to moderate income groups in Australia has been experiencing a severe decline since 2001. On the supply side, the public sector has been reducing its commitment to the direct provision of public housing. Despite high demand for affordable housing, there has been limited supply generated by non-government housing providers. One possible solution to promote an increase in affordable housing supply, like other infrastructure, is through the development of multi-stakeholder partnerships and private financing. This research aims to identify current issues underlying decision-making criteria for building multi-stakeholder partnerships to deliver affordable housing projects. It also investigates strategies for minimising risk and ensuring the financial outcomes of these partnership arrangements. A mix of qualitative in-depth interviews and quantitative surveys has been used as the main method to explore stakeholder experiences regarding their involvement in partnership arrangements in the affordable housing sector in Queensland. Two sets of interviews were conducted following an exploratory pilot study: one set in 2003-2004 and the other in 2007-2008. There were nineteen respondents representing government, private and not-for-profit organisations in the first stage interviews and surveys. The second stage interviews were focussed on twenty-two housing providers in South East Queensland. Initial analyses have been conducted using thematic and statistical analyses. This study extends the use of existing decision making tools and combines the use of a Soft System Framework to analyse the ideal state questionnaires using qualitative thematic analysis. Soft System Methodology (SSM) has been used to analyse this unstructured complex problem by using systematic thinking to develop a conceptual model and carrying it to the real world situations to solve the problem. This research found that the diversity of stakeholder capability and their level of risk acceptance will allow partnerships to develop the best synergies and a degree of collaboration which achieves the required financial return within acceptable risk parameters. However, some of the negativity attached to future commitment to such partnerships has been found to be the anticipation of a worse outcome than that expected from independent action. Many interviewees agree that housing providers' fear of financial risk and community rejection has been central to dampening their enthusiasm for entering such investment projects. The creation of a mixed-use development structure will mitigate both risk and return as the commercial income will subsidise the affordable housing development and will normalise concentration of marginalised low-income people who live in a prime location with an award winning design. In addition, tenant support schemes and rent-to-buy incentive programs will encourage them to secure their tenancies and significantly reduce the risk of rent arrears and property damage. There is also a breakthrough investment vehicle offered by the social developer which sells the non-physical but financial product to individual and institutional investors to mitigate further financial risk. Finally, this study recommends modification of the current value-for-money framework in favour of broader partnership arrangements which are more closely aligned with risk minimisation strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The annual income return for rural property is based on two major factors being commodity prices and production yields. Commodity prices paid to rural producers can vary depending on the agricultural policies of their respective countries. Free trade countries, such as Australia and New Zealand are subject to the volatility of the world commodity markets to a greater extent than those farmers in protected or subsidised markets. In countries where rural production is protected or subsidised the annual income received by rural producers has been relatively stable. However, the high cost of agricultural protection is now being questioned, particularly in relation to the increasing economic costs of government services such as health, education and housing. When combined with the agricultural production limitations of climate, topography, chemical residues and disease issues, the impact of commodity prices on rural property income is crucial in the ability of rural producers to enter into or expand their holdings in agricultural land. These problems are then reflected in the volatility of the rural land capital returns and the investment performance of this property class. This paper will address the total and capital return performance of a major agricultural area and compare these returns on the basis of both location of land and land use. The comparison will be used to determine if location or actual land use has a greater influence on rural property capital returns. This performance analysis is based on over 35,000 rural sales transactions. These transactions cover all market based rural property transactions in New South Wales, Australia for the period January 1990 to December 2008. Correlation analysis and investment performance analysis has also been carried out to determine the possible relationships between location and land use and subsequent changes in rural land capital values.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the increasing complexity of modern day threats and the growing sophistication of interlinked and interdependent operating environments, Business Continuity Management (BCM) has emerged as a new discipline, offering a strategic approach to safeguarding organisational functions. Of significant interest is the application of BCM frameworks and strategies within critical infrastructure, and in particular the aviation industry. Given the increased focus on security and safety for critical infrastructures, research into the adoption of BCM principles within an airport environment provides valuable management outcomes and research into a previously neglected area of inquisition. This research has used a single case study methodology to identify possible impediments to BCM adoption and implementation by the Brisbane Airport Corporation (BAC). It has identified a number of misalignments between the required breadth of focus for a BCM program, identified differing views on specific roles and responsibilities required during a major disruptive event and illustrated the complexities of the Brisbane Airport which impede the understanding and implementation of effective Business Continuity Management Strategies.