748 resultados para Green construction
Resumo:
We show the first deterministic construction of an unconditionally secure multiparty computation (MPC) protocol in the passive adversarial model over black-box non-Abelian groups which is both optimal (secure against an adversary who possesses any t
Resumo:
Urban green infrastructure can help cities adapt to climate change. Spatial planning can play an important role in utilizing green infrastructure for adaptation. Yet climate change risks represent a different sort of challenge for planning institutions. This paper aims to address two issues arising from this challenge. First, it defines the concept of green infrastructure within the context of climate adaptation. Second, it identifies and puts into perspective institutional barriers to adopting green infrastructure for climate adaptation, including path dependence. We begin by arguing that there is growing confusion among planners and policy makers about what constitutes green infrastructure. Definitional ambiguity may contribute to inaction on climate change adaptation, because it muddies existing programs and initiatives that are to do with green-space more broadly, which in turn feeds path dependency. We then report empirical findings about how planners perceive the institutional challenge arising from climate change and the adoption of green infrastructure as an adaptive response. The paper concludes that spatial planners generally recognize multiple rationales associated with green infrastructure. However they are not particularly keen on institutional innovation and there is a tendency for path dependence. We propose a conceptual model that explicitly recognizes such institutional factors. This paper contributes to the literature by showing that agency and institutional dimensions are a limiting factor in advancing the concept of green infrastructure within the context of climate change adaptation.
Resumo:
Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.
Resumo:
This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large scale highway agency. Three dimensions of DRB impact were assessed: (1)influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10 year period (2000-2009).
Resumo:
This project developed and assessed a standard operating procedure for monitoring microbiological aerosol levels and dispersal from Australian industrial composting facilities. Development occurred via seasonal monitoring of such operations with evaluation of optimal microbial indicator organisms, sampling and analysis logistics. The resultant procedure allows practical end-user assessment of compost-associated bioaerosol levels, and potential health risks to proximal residential populations encroaching on such composting facilities and on-site industrial operations personnel.
Resumo:
This paper discusses a Dumber of key issues for the development of robust, obstacle detection systems for autonomous mining and construction vehicles. A taxonomy of obstacle detection systems is described; An overview of the state-of- the-art in obstacle detection for outdoor autonomous vehicles is presented with their applicability to the mining and construction environments noted. The issue of so-called fail-safe obstacle detection is then discussed. Finally, we describe the development of an obstacle detection system for a mining vehicle.
Resumo:
This paper discusses the issue of sensing and control for stabilizing a swinging load. Our work has focused in particular on the dragline as used for overburden stripping in open-pit coal mining, but many of the principles would also be applicable to construction cranes. Results obtained from experimental work on a full-scale production dragline are presented.
Resumo:
Road infrastructure is a major contributor of greenhouse gas (GHG) around the world. Once constructed, a road becomes a part of a road network and is subjected to recurrent maintenance/rehabilitation activities. Studies to date are mostly aimed at the development of sustainability indicators that deal with the material and construction phases of a road when it is constructed. The operation phase is infrequently studied and there is a need for sustainability indicators to be developed relating to this phase to better understand the GHG emissions as a proper response to the climate change phenomena. During the operation phase, maintenance/rehabilitation activities are undertaken based on certain agreed intervention criteria that do not include environmental implications relating to the climate change aspect properly. Availability of appropriate indicators may, therefore, assist in sustainable road asset maintenance management. This paper presents the findings of a literature based study and has proposed a way forward to develop a key “road operation phase” environmental indicator, which can contribute to road operation phase carbon footprint management based on a comprehensive road life cycle system boundary model. The proposed indicator can address multiple aspects of high impact road operation life environmental components such as: pavement rolling resistance, albedo, material, traffic congestion and lighting, based on availability of relevant scientific knowledge. Development of the indicator to appropriate level would offset the impacts of these components significantly and contribute to sustainable road operation management.
Resumo:
3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.
Resumo:
Observing the working procedure of construction workers is an effective means of maintaining the safety performance of a construction project. It is also difficult to achieve due to a high worker-to-safety-officer ratio. There is an imminent need for the development of a tool to assist in the real-time monitoring of workers, in order to reduce the number of construction accidents. The development and application of a real time locating system (RTLS) based on the Chirp Spread Spectrum (CSS) technique is described in this paper for tracking the real-time position of workers on construction sites. Experiments and tests were carried out both on- and off-site to verify the accuracy of static and dynamic targets by the system, indicating an average error of within one metre. Experiments were also carried out to verify the ability of the system to identify workers’ unsafe behaviours. Wireless data transfer was used to simplify the deployment of the system. The system was deployed in a public residential construction project and proved to be quick and simple to use. The cost of the developed system is also reported to be reasonable (around 1800USD) in this study and is much cheaper than the cost of other RTLS. In addition, the CCS technique is shown to provide an economical solution with reasonable accuracy compared with other positioning systems, such as ultra wideband. The study verifies the potential of the CCS technique to provide an effective and economical aid in the improvement of safety management in the construction industry.
Resumo:
Construction is one of the most hazardous industries due to its dynamic, temporary, and decentralized nature. The Hong Kong Commissioner for Labor identifies worker behavior as the root cause of construction accidents. Behavior-based safety (BBS) is one effective approach in managing employee safety issues. However, there is little research on the application of BBS in the construction industry. This research proposes an extension of the BBS approach, proactive behavior-based safety (PBBS), to improve construction safety. PBBS integrates the theory of BBS with the technology of Proactive Construction Management System (PCMS). The innovations of PBBS are: (1) automatically monitoring location-based behaviors; (2)quantitatively measuring safety performance; (3) investigating potential causes of unsafe behaviors; and (4) improving the efficiency of safety management. A pilot study of a Hong Kong construction site practicing PBBS was conducted. The experiment results showed that PBBS performed well on construction accident prevention and the Safety Index (SI) of the two project teams, with increased improvements by 36.07% and 44.70% respectively. It is concluded that PBBS is effective and adaptable to construction industry.
Resumo:
With the increasing competitiveness in global markets, many developing nations are striving to constantly improve their services in search for the next competitive edge. As a result, the demand and need for Business Process Management (BPM) in these regions is seeing a rapid rise. Yet there exists a lack of professional expertise and knowledge to cater to that need. Therefore, the development of well-structured BPM training/ education programs has become an urgent requirement for these industries. Furthermore, the lack of textbooks or other self-educating material, that go beyond the basics of BPM, further ratifies the need for case based teaching and related cases that enable the next generation of professionals in these countries. Teaching cases create an authentic learning environment where complexities and challenges of the ‘real world’ can be presented in a narrative, enabling students to evolve crucial skills such as problem analysis, problem solving, creativity within constraints as well as the application of appropriate tools (BPMN) and techniques (including best practices and benchmarking) within richer and real scenarios. The aim of this paper is to provide a comprehensive teaching case demonstrating the means to tackle any developing nation’s legacy government process undermined by inefficiency and ineffectiveness. The paper also includes thorough teaching notes The article is presented in three main parts: (i) Introduction - that provides a brief background setting the context of this paper, (ii) The Teaching Case, and (iii) Teaching notes.
Resumo:
A recurring feature of modern practice is occupational stress of project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Previous research outside the construction industry has involved the use of a psychology perceived stress questionnaire (PSQ) to measure occupational stress, resulting in the identification of one stressor – demand - and three sub-dimensional emotional reactions in terms of worry, tension and joy. The PSQ is translated into Chinese with a back translation technique and used in a survey of young construction cost professionals in China. Principal component analysis and confirmatory factor analysis are used to test the divisibility of occupational stress - little mentioned in previous research on stress in the construction context. In addition, structural equation modelling is used to assess nomological validity by testing the effects of the three dimensions on organizational commitment, the main finding of which is that lack of joy has the sole significant effect. The three-dimensional measurement framework facilitates the standardizing measurement of occupational stress. Further research will establish if the findings are also applicable in other settings and explore the relations between stress dimensions and other managerial concepts.
Resumo:
Purpose Performance heterogeneity between collaborative infrastructure projects is typically examined by considering procurement systems and their governance mechanisms at static points in time. The literature neglects to consider the impact of dynamic learning capability, which is thought to reconfigure governance mechanisms over time in response to evolving market conditions. This conceptual paper proposes a new model to show how continuous joint learning of participant organisations improves project performance. Design/methodology/approach There are two stages of conceptual development. In the first stage, the management literature is analysed to explain the Standard Model of dynamic learning capability that emphasises three learning phases for organisations. This Standard Model is extended to derive a novel Circular Model of dynamic learning capability that shows a new feedback loop between performance and learning. In the second stage, the construction management literature is consulted, adding project lifecycle, stakeholder diversity and three organisational levels to the analysis, to arrive at the Collaborative Model of dynamic learning capability. Findings The Collaborative Model should enable construction organisations to successfully adapt and perform under changing market conditions. The complexity of learning cycles results in capabilities that are imperfectly imitable between organisations, explaining performance heterogeneity on projects. Originality/value The Collaborative Model provides a theoretically substantiated description of project performance, driven by the evolution of procurement systems and governance mechanisms. The Model’s empirical value will be tested in future research.
Resumo:
This thesis provides a review of 199 papers published on Green IT/IS between 2007−2014, in order to present taxonomy of segments in Green IT/IS publications, where the segments are later used for multiple analyses to facilitate future research and to provide a retrospective analysis of existing knowledge and gaps thereof. This research also attempts to make a unique contribution to our understanding of Green IT/IS, by consolidating papers it observes current patterns of literature through approach analysis and segmentation, as well as allocating studies to the technology, process, or outcome (TPO) stage. Highlighting the necessity of a consolidated approach, these classification systems have been combined into a TPO matrix so that the studies could be arranged according to which stage of the Green IT/IS cycle they were focused on. We believe that these analyses will provide a solid platform from which future Green IT/IS research can be launched.