985 resultados para Enrollment Management
Resumo:
No matter how aspirational they are, management accountants face a series of roadblocks in the course of building careers in organisations. Experts reveal the four key obstacles that need to be addressed in the course of becoming global leaders.
Resumo:
Aspect orientation is an important approach to address complexity of cross-cutting concerns in Information Systems. This approach encapsulates these concerns separately and compose them to the main module when needed. Although there a different works which shows how this separation should be performed in process models, the composition of them is an open area. In this paper, we demonstrate the semantics of a service which enables this composition. The result can also be used as a blueprint to implement the service to support aspect orientation in Business Process Management area.
Resumo:
Reducing complexity in Information Systems is a main concern in both research and industry. One strategy for reducing complexity is separation of concerns. This strategy advocates separating various concerns, like security and privacy, from the main concern. It results in less complex, easily maintainable, and more reusable Information Systems. Separation of concerns is addressed through the Aspect Oriented paradigm. This paradigm has been well researched and implemented in programming, where languages such as AspectJ have been developed. However, the rsearch on aspect orientation for Business Process Management is still at its beginning. While some efforts have been made proposing Aspect Oriented Business Process Modelling, it has not yet been investigated how to enact such process models in a Workflow Management System. In this paper, we define a set of requirements that specifies the execution of aspect oriented business process models. We create a Coloured Petri Net specification for the semantics of so-called Aspect Service that fulfils these requirements. Such a service extends the capability of a Workflow Management System with support for execution of aspect oriented business process models. The design specification of the Aspect Service is also inspected through state space analysis.
Resumo:
The research team recognized the value of network-level Falling Weight Deflectometer (FWD) testing to evaluate the structural condition trends of flexible pavements. However, practical limitations due to the cost of testing, traffic control and safety concerns and the ability to test a large network may discourage some agencies from conducting the network-level FWD testing. For this reason, the surrogate measure of the Structural Condition Index (SCI) is suggested for use. The main purpose of the research presented in this paper is to investigate data mining strategies and to develop a prediction method of the structural condition trends for network-level applications which does not require FWD testing. The research team first evaluated the existing and historical pavement condition, distress, ride, traffic and other data attributes in the Texas Department of Transportation (TxDOT) Pavement Maintenance Information System (PMIS), applied data mining strategies to the data, discovered useful patterns and knowledge for SCI value prediction, and finally provided a reasonable measure of pavement structural condition which is correlated to the SCI. To evaluate the performance of the developed prediction approach, a case study was conducted using the SCI data calculated from the FWD data collected on flexible pavements over a 5-year period (2005 – 09) from 354 PMIS sections representing 37 pavement sections on the Texas highway system. The preliminary study results showed that the proposed approach can be used as a supportive pavement structural index in the event when FWD deflection data is not available and help pavement managers identify the timing and appropriate treatment level of preventive maintenance activities.
Resumo:
Networks have come to the fore as a means by which government can achieve its strategic objectives, particularly when addressing complex or “wicked” issues. Such joined-up arrangements differ in their operations from other forms of organizing as they require collaborative effort to deliver the collaborative advantage. Strategic Human Resource Management is concerned with the matching of human resource practices to the strategic direction of organizations. It is argued that the strategic direction of government has been towards network involvement and that, as a result, a reconfiguration of Human Resource Management practices is needed to support this new direction. Drawing on eight network case studies findings are presented in relation to the roles government is expected to play in networks and conclusions are drawn about what types of human resource management practices would best support those roles. Implications for Strategic Human Resource Management are posited.
Resumo:
This important research is published at a critical time in the history of PRINCE2. The world’s project managers are under incredible scrutiny and pressure to ensure their projects deliver quality on time and on budget – and even more so during a world recession. The research shows that PRINCE2 goes a long way to helping them achieve these goals. Although its origins began in the UK, PRINCE2 now has a truly international reach. We are delighted that the Queensland University of Technology (QUT) has undertaken this global, thorough and informative research project. While it highlights the strengths of the methodology itself, the report also looks at the challenges organisations face when using a project management method such as PRINCE2. We’re sure the challenges will resonate with project managers around the world. Securing executive support to champion the adoption of PRINCE2, creating a robust business case and prioritising project governance are key issues that all project managers will grapple with during their career. The research also shows that to be thoroughly effective, organisations need to properly embed PRINCE2 and tailor it to suit their particular circumstances. Many successful organisations have sought the effective help of accredited consulting organisations to assist them in developing a programme to tailor and inculcate this method into their organisational culture. The latest version incorporates a whole chapter on tailoring PRINCE2. We believe that the publication of PRINCE2 Directing Successful Projects using PRINCE2 and the development of further support in the form of materials, mentoring and training for senior executives will be of significant benefit to contemporary project based organisations. The APM Group has already developed a qualification for sponsors in conjunction with the UK’s Home Office to help with this.
Resumo:
- Preface by Richard T. Watson - Discusses the emerging challenges of designing “green” business processes - Presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes - Provides insights from cases where organizations successfully engaged in more sustainable business practices Green Business Process Management – Towards the Sustainable Enterprise" consolidates the global state-of-the-art knowledge about how business processes can be managed and improved in light of sustainability objectives. Business organizations, a dominant part of our society, have always been a major contributor to the degradation of our natural environment, through the resource consumption, greenhouse emissions, and wastage production associated with their business processes. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable business processes. Finding solutions to this organizational design problem is the key challenge of Green Business Process Management. This book discusses the emerging challenges of designing “green” business processes, presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes, and provides insights from cases where organizations successfully engaged in more sustainable business practices. The book is of relevance to both practitioners and academics who are interested in understanding, designing, and implementing “green” business processes. It also constitutes a valuable resource for students and lecturers in the fields of information systems, management, and sustainable development.
Resumo:
In managing their operations, organizations have traditionally focused on economic imperatives in terms of time, cost, efficiency, and quality. In doing so, they have been a major contributor to environmental degradation caused by re-source consumption, greenhouse emissions, and wastage. As a consequence, or-ganizations are increasingly encouraged to improve their operations also from an ecological perspective, and thus to consider environmental sustainability as an additional management imperative. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable processes, which we call the challenge of Green Business Process Management (Green BPM). This chapter elaborates on the challenge and perspec-tive of Green BPM, and explores the contributions that business process management can provide to creating environmentally sustainable organizations. Our key premise is that business as well as information technology managers need to engage in a process-focused discussion to enable a common, comprehensive understanding of organizational processes, and the process-centered opportunities for making these processes, and ultimately the organization as a process-centric entity, “green.” Through our review of the key BPM capability areas and how they can be framed in terms of environmental sustainability considerations, we provide an overview and introduction to the subsequent chapters in this book.
Resumo:
Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.
Resumo:
The purpose of this paper is to investigate the essential elements of sport management in Australia in the 1990's. The essential purpose is to view these elements from a legal perspective. In the past 12 months there has been at least three conferences in the sports law area. The majority of this paper has been allocated to the area of legal liability, especially the legal relationships evolving between the player and his co-participant, the player and his club, the player and his coach, and the duties and liabilities of the coach and the club. The area of insurance will also be discussed as it is a vital element in protecting the players, coaches and clubs in the event of any litigation. A well publicised case was that of Rogers v Bugden where the plaintiff Steven Rogers, who was a first grade rugby league football player for Cronulla, suffered a broken jaw and sued his co-participant Mark Bugden and Bugden's employer Canterbury/Bankstown District Rugby League Football Club. It was held that there was a contract of employment and Canterbury/Bankstown was found to be vicariously liable and was ordered to pay Rogers the sum of $68,154.00. The legal actions in tort and negligence are increasing. Sports managers will need to investigate thoroughly the protection available for their clients.
Resumo:
My interest in career paths in the third sector came from three early observations. First, the majority of workers appear to be women, in fact 77% of community sector community services in NSW (O'Donnell, 1985). Second, when asked about their career, most workers express the opinion that they have none. Third, when I examined the individual career paths of community sector workers I was struck by the stop and start nature of their paid work. Even, or perhaps especially, well qualified workers would move out of a position after about two years often to a more difficult position in a new area, with little or no salary increase and little prospect of future promotion. Indeed, there appears to be little career path available. These observations raise a number of important questions, some of which will be explored in this paper. What is the structure of the third sector labour market? What is the staff structure of third sector organisations? Is it true that career paths are unavailable, either within organisations or within the sector? If none exists, why do workers stay in the field? What motivates them? If there is a high turnover of staff, is this the reason? What are the implications of all this? If some sort of career path does exist, why do workers deny having a career? What do we mean by `career' anyway?
Resumo:
Organizations adopt a Supply Chain Management System (SCMS) expecting benefits to the organization and its functions. However, organizations are facing mounting challenges to realizing benefits through SCMS. Studies suggest a growing dissatisfaction among client organizations due to an increasing gap between expectations and realization of SCMS benefits. Further, reflecting the Enterprise System studies such as Seddon et al. (2010), SCMS benefits are also expected to flow to the organization throughout its lifecycle rather than being realized all at once. This research therefore proposes to derive a lifecycle-wide understanding of SCMS benefits and realization to derive a benefit expectation management framework to attain the full potential of an SCMS. The primary research question of this study is: How can client organizations better manage their benefit expectations of SCM systems? The specific research goals of the current study include: (1) to better understand the misalignment of received and expected benefits of SCM systems; (2) to identify the key factors influencing SCM system expectations and to develop a framework to manage SCMS benefits; (3) to explore how organizational satisfaction is influenced by the lack of SCMS benefit confirmation; and (4) to explore how to improve the realization of SCM system benefits. Expectation-Confirmation Theory (ECT) provides the theoretical underpinning for this study. ECT has been widely used in the consumer behavior literature to study customer satisfaction, post-purchase behavior and service marketing in general. Recently, ECT has been extended into Information Systems (IS) research focusing on individual user satisfaction and IS continuance. However, only a handful of studies have employed ECT to study organizational satisfaction on large-scale IS. The current study will enrich the research stream by extending ECT into organizational-level analysis and verifying the preliminary findings of relevant works by Staples et al. (2002), Nevo and Chan (2007) and Nevo and Wade (2007). Moreover, this study will go further trying to operationalize the constructs of ECT into the context of SCMS. The empirical findings of the study commence with a content analysis, through which 41 vendor reports and academic reports are analyzed yielding sixty expected benefits of SCMS. Then, the expected benefits are compared with the benefits realized at a case organization in the Fast Moving Consumer Goods industry sector that had implemented a SAP Supply Chain Management System seven years earlier. The study develops an SCMS Benefit Expectation Management (SCMS-BEM) Framework. The comparison of benefit expectations and confirmations highlights that, while certain benefits are realized earlier in the lifecycle, other benefits could take almost a decade to realize. Further analysis and discussion on how the developed SCMS-BEM Framework influences ECT when applied in SCMS was also conducted. It is recommended that when establishing their expectations of the SCMS, clients should remember that confirmation of these expectations will have a long lifecycle, as shown in the different time periods in the SCMS-BEM Framework. Moreover, the SCMS-BEM Framework will allow organizations to maintain high levels of satisfaction through careful mitigation and confirming expectations based on the lifecycle phase. In addition, the study reveals that different stakeholder groups have different expectations of the same SCMS. The perspective of multiple stakeholders has significant implications for the application of ECT in the SCMS context. When forming expectations of the SCMS, the collection of organizational benefits of SCMS should represent the perceptions of all stakeholder groups. The same mechanism should be employed in the measurements of received SCMS benefits. Moreover, for SCMS, there exists interdependence of the satisfaction among the various stakeholders. The satisfaction of decision-makers or the authorized staff is not only driven by their own expectation confirmation level, it is also influenced by the confirmation level of other stakeholders‘ expectations in the organization. Satisfaction from any one particular stakeholder group can not reflect the true satisfaction of the client organization. Furthermore, it is inferred from the SCMS-BEM Framework that organizations should place emphasis on the viewpoints of the operational and management staff when evaluating the benefits of SCMS in the short and middle term. At the same time, organizations should be placing more attention on the perspectives of strategic staff when evaluating the performance of the SCMS in the long term.
Resumo:
The objective of this study was to identify key factors differentiating between exporters and non-exporters in the Chilean wine industry. Based on survey data collected from 61 wineries, the findings show that the main barriers for non-exporters are the lack of financial resources, limited quantities of stock for market expansion, management’s lack of knowledge and experience, and the high cost of travelling and participating in trade shows. The results also show that managers have educational levels and international experience exceeding those of other comparable New World wineries. Finally, in developing their main international markets, Chilean wineries did not target psychically close markets as identified in previous wine industry studies
Resumo:
Traditionally navigational safety analyses rely on historical collision data which is often hampered because of low collision counts, insufficiency in explaining collision causation, and reactive approach to safety. A promising alternative approach that overcomes these problems is using navigational traffic conflicts or near-misses as an alternative to the collision data. This book discusses how traffic conflicts can effectively be used in modeling of port water collision risks. Techniques for measuring and predicting collision risks in fairways, intersections, and anchorages are discussed by utilizing advanced statistical models. Risk measurement models, which quantitatively measure collision risks in waterways, are discussed. To predict risks, a hierarchical statistical modeling technique is discussed which identifies the factors influencing the risks. The modeling techniques are illustrated for Singapore port data. Results showed that traffic conflicts are an ethically appealing alternative to collision data for fast, reliable and effective safety assessment, thus possessing great potential for managing collision risks in port waters.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.