103 resultados para Rischio finanziario, Value-at-Risk, Expected Shortfall


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Academic pressure among adolescents is a major risk factor for poor mental health and suicide and other harmful behaviours. While this is a worldwide phenomenon, it appears to be especially pronounced in China and other East Asian countries. Despite a growing body of research into adolescent mental health in recent years, the multiple constructs within the ‘educational stress’ phenomenon have not been clearly articulated in Chinese contexts. Further, the individual, family, school and peer influencing factors for educational stress and its associations with adolescent mental health are not well understood. An in-depth investigation may provide important information for the ongoing educational reform in Mainland China with a special focus on students’ mental health and wellbeing. The primary goal of this study was to examine the relative contribution of educational stress to poor mental health, in comparison to other well-known individual, family, school and peer factors. Another important task was to identify significant risk factors for educational stress. In addition, due to the lack of a culturally suitable instrument for educational stress in this population, a new tool – the Educational Stress Scale for Adolescents (ESSA) was initially developed in this study and tested for reliability and validity. A self-administered questionnaire was used to collect information from convenient samples of secondary school students in Shandong, China. The pilot survey was conducted with 347 students (grades 8 and 11) to test the psychometric properties of the ESSA and other scales or questions in the questionnaire. Based on factor analysis and reliability and validity testing, the 16-item scale (the ESSA) with five factors showed adequate to good internal consistency, 2-week test-retest reliability, and satisfactory concurrent and predictive validity. Its factor structure was further demonstrated in the main survey with a confirmatory factor analysis illustrating a good fit of the proposed model based on a confirmatory factor analysis. The reliabilities of other scales and questions were also adequate to be used in this study. The main survey was subsequently conducted with a sample of 1627 secondary school (grades 7-12) students to examine the influencing factors of educational stress and its associations with mental health outcomes, including depression, happiness and suicidal behaviours. A wide range of individual, family, school and peer factors were found to have a significant association with the total ESSA and subscale scores. Most of the strong factors for academic stress were school or study-related, including rural school location, low school connectedness, perceived poor academic grades and frequent emotional conflicts with teachers and peers. Unexpectedly, family and parental factors, such as parental bonding, family connectedness and conflicts with parents were found to have little or no association with educational stress. Educational stress was the most predictive variable for depression, but was not strongly associated with happiness. It had a strong association with suicide ideation but not with suicide attempts. Among five subscales of the ESSA, ‘Study despondency’ score had the strongest associations with these mental health measures. Surprising, two subscales, ‘Self-expectation’ and ‘Worry about grades’ showed a protective effect on suicidal behaviours. An additional analysis revealed that although academic pressure was the most commonly reported reason for suicidal thinking, the occurrence of problems in peer relationships such as peer teasing and bullying, and romantic problems had a much stronger relationship with actual attempts. This study provides some insights into the nature and health implications of educational stress among Chinese adolescents. Findings in this study suggest that interventions on educational stress should focus on school environment and academic factors. Intervention programs focused on educational stress may have a high impact on the prevalence of common mental disorders such as depression. Efforts to increase perceived happiness however should cover a wider range of individual, family and school factors. The importance of healthy peer relationships should be adequately emphasised in suicide prevention. In addition, the newly developed scale (the ESSA) demonstrates sound psychometric properties and is expected to be used in future research into academic-related stress among secondary school adolescents.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Total hip arthroplasty (THA) is a commonly performed procedure and numbers are increasing with ageing populations. One of the most serious complications in THA are surgical site infections (SSIs), caused by pathogens entering the wound during the procedure. SSIs are associated with a substantial burden for health services, increased mortality and reduced functional outcomes in patients. Numerous approaches to preventing these infections exist but there is no gold standard in practice and the cost-effectiveness of alternate strategies is largely unknown. Objectives The aim of this project was to evaluate the cost-effectiveness of strategies claiming to reduce deep surgical site infections following total hip arthroplasty in Australia. The objectives were: 1. Identification of competing strategies or combinations of strategies that are clinically relevant to the control of SSI related to hip arthroplasty 2. Evidence synthesis and pooling of results to assess the volume and quality of evidence claiming to reduce the risk of SSI following total hip arthroplasty 3. Construction of an economic decision model incorporating cost and health outcomes for each of the identified strategies 4. Quantification of the effect of uncertainty in the model 5. Assessment of the value of perfect information among model parameters to inform future data collection Methods The literature relating to SSI in THA was reviewed, in particular to establish definitions of these concepts, understand mechanisms of aetiology and microbiology, risk factors, diagnosis and consequences as well as to give an overview of existing infection prevention measures. Published economic evaluations on this topic were also reviewed and limitations for Australian decision-makers identified. A Markov state-transition model was developed for the Australian context and subsequently validated by clinicians. The model was designed to capture key events related to deep SSI occurring within the first 12 months following primary THA. Relevant infection prevention measures were selected by reviewing clinical guideline recommendations combined with expert elicitation. Strategies selected for evaluation were the routine use of pre-operative antibiotic prophylaxis (AP) versus no use of antibiotic prophylaxis (No AP) or in combination with antibiotic-impregnated cement (AP & ABC) or laminar air operating rooms (AP & LOR). The best available evidence for clinical effect size and utility parameters was harvested from the medical literature using reproducible methods. Queensland hospital data were extracted to inform patients’ transitions between model health states and related costs captured in assigned treatment codes. Costs related to infection prevention were derived from reliable hospital records and expert opinion. Uncertainty of model input parameters was explored in probabilistic sensitivity analyses and scenario analyses and the value of perfect information was estimated. Results The cost-effectiveness analysis was performed from a health services perspective using a hypothetical cohort of 30,000 THA patients aged 65 years. The baseline rate of deep SSI was 0.96% within one year of a primary THA. The routine use of antibiotic prophylaxis (AP) was highly cost-effective and resulted in cost savings of over $1.6m whilst generating an extra 163 QALYs (without consideration of uncertainty). Deterministic and probabilistic analysis (considering uncertainty) identified antibiotic prophylaxis combined with antibiotic-impregnated cement (AP & ABC) to be the most cost-effective strategy. Using AP & ABC generated the highest net monetary benefit (NMB) and an incremental $3.1m NMB compared to only using antibiotic prophylaxis. There was a very low error probability that this strategy might not have the largest NMB (<5%). Not using antibiotic prophylaxis (No AP) or using both antibiotic prophylaxis combined with laminar air operating rooms (AP & LOR) resulted in worse health outcomes and higher costs. Sensitivity analyses showed that the model was sensitive to the initial cohort starting age and the additional costs of ABC but the best strategy did not change, even for extreme values. The cost-effectiveness improved for a higher proportion of cemented primary THAs and higher baseline rates of deep SSI. The value of perfect information indicated that no additional research is required to support the model conclusions. Conclusions Preventing deep SSI with antibiotic prophylaxis and antibiotic-impregnated cement has shown to improve health outcomes among hospitalised patients, save lives and enhance resource allocation. By implementing a more beneficial infection control strategy, scarce health care resources can be used more efficiently to the benefit of all members of society. The results of this project provide Australian policy makers with key information about how to efficiently manage risks of infection in THA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the past few years, plant biotechnology has gone beyond traditional agricultural production of food, feed and fibre, and moved to address more complex contemporary health, social and industrial challenges. The new era involves production of novel pharmaceutical products, speciality and fine chemicals, phytoremediation and production of renewable energy resources to replace non-renewable fossil fuels. Plants have been shown to provide a genuine and low-cost alternative production system for high-value products. Currently, the principal plant-made products include antibodies, feed additives, vaccine antigens and hormones for human and animal health, and industrial proteins. Despite the unique advantages of scalability, cost and product safety, issues of politics, environmental impact, regulation and socioeconomics still limit the adoption of biopharmaceuticals, especially in the developing world. Plant-based production systems have further complicated biosafety, gene flow and environmental impact assessments with generally genetically modified plants, topics that are already partially understood. This article provides a background to biopharming, highlighting basic considerations for risk assessment and regulation in developing countries, with an emphasis on plant-based vaccine production in South Africa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Cardiovascular disease (CVD) is more prevalent in regional and remote Australia compared to metropolitan areas. The aim of Healthy Hearts was to determine age and sex specific CVD risk factor levels and the potential value of national risk clinics. Methods: Healthy Hearts was an observational research study conducted in four purposefully selected higher risk communities in regional Victoria, Australia. The main outcome measures were the proportion of participants with CVD risk factors with group comparisons to determine the adjusted likelihood of elevated risk factor levels. Trained personnel used a standardized protocol over four weeks per community to measure CVD risk factor levels, estimate absolute CVD risk and provide feedback and advice. Results: A total of 2125 self-selected participants were assessed (mean age 58 ± 15 years, 57% women). Overall, CVD risk factors were highly prevalent. More men than women had ≥ 2 modifiable CVD risk factors (76% vs. 68%, p < .001), pre-existing CVD (20 vs. 15%, p < .01) and a major ECG abnormality requiring follow-up (15% vs. 7%, p < .001) . Less men reported depressive symptoms compared to women (28% vs. 22%, p < .01). A higher proportion of women were obese (adjusted OR 1.36, 95% CI 1.13 to 1.63), and physically inactive (adjusted OR 1.32, 95% CI 1.07 to 1.63). Conclusions: High CVD risk factor levels were confirmed for regional Victoria. Close engagement with individuals and communities provides scope for the application of regional risk management clinics to reduce the burden of CVD risk in regional Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a technique that supports process participants in making risk-informed decisions, with the aim to reduce the process risks. Risk reduction involves decreasing the likelihood and severity of a process fault from occurring. Given a process exposed to risks, e.g. a financial process exposed to a risk of reputation loss, we enact this process and whenever a process participant needs to provide input to the process, e.g. by selecting the next task to execute or by filling out a form, we prompt the participant with the expected risk that a given fault will occur given the particular input. These risks are predicted by traversing decision trees generated from the logs of past process executions and considering process data, involved resources, task durations and contextual information like task frequencies. The approach has been implemented in the YAWL system and its effectiveness evaluated. The results show that the process instances executed in the tests complete with substantially fewer faults and with lower fault severities, when taking into account the recommendations provided by our technique.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wandering is aimless and repetitive locomotion that may expose persons with dementia (PWD) to elopement, getting lost and death. This study is an Australian replication of a US study. Cross-disciplinary consensus- based analysis was applied to data from five focus groups (N =47: cognitively intact LTC residents (5), carers of PWD (11), home care workers (13) allied health professionals and health-focused engineers (7) and RNs (11). Groups received briefing about wandering monitoring and elopement management systems. Consistent with US attitudes, participants in all groups agreed on what a wandering technology should do, how it should do it, and necessary technical specifications. Within each group participants raised the need for a continuum of care for PWD and the imperative for early recognition of potentially dangerous wandering and getting lost when they occur. Global Positioning System elopement management was the preferred option. Interestingly, the prospective value of GPS to recover a lost or eloped wanderer far outweighed privacy concerns, as in the US. A pervasive theme was that technologies need to augment, but cannot replace, attentive, compassionate caregiver presence. A significant theme raised only by Australian carers of PWD was the potential for development of implantable GPS technologies and the need for public debate about attendant ethical issues. Given that 60% or more of over 200,000 Australians and 4.5 million Americans with dementia will develop wandering, there is a pressing need to develop effective locator systems that may delay institutionalization, help allay carer concern and enhance PWD safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We investigate the claims of superiority of fundamental indexation strategy over capitalisation-weighted indexation by using data for Australian Securities Exchange (ASX) listed stocks. Whilst our results are in line with the outperformance observed in other geographical markets, we find that the excess returns from fundamental indexation in Australian market are much higher. On a rolling 5-year basis, the fundamental index always outperforms the capitalisation-weighted index. Our results suggest that superior performance of fundamental indexation could not be entirely attributed to value, size, or momentum effects. The outperformance persists even after adjusting for slightly higher transaction costs related to turnover.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Queensland Government has implemented strategies promoting a shift from individual car use to active transport, a transition which requires drivers to adapt to sharing the road with increased numbers of people cycling through transport network. For this to occur safely, changes in both road infrastructure and road user expectations and behaviors will be needed. Creating separate cycle infrastructure does not remove the need for cyclists to commence, cross or finish travel on shared roads. Currently intersections are one of the predominant shared road spaces where crashes result in cyclists being injured or killed. This research investigates how Brisbane cyclists and drivers perceive risk when interacting with other road users at intersections. The current study replicates a French study conducted by co-authors Chaurand and Delhomme in 2011 and extends it to assess gender effects which have been reported in other Australian cycling research. An online survey was administered to experienced cyclists and drivers. Participants rated the level of risk they felt when imagining a number of different road situations. Based on the earlier French study it is expected that perceived crash risk will be influenced both by the participant’s mode of travel and the type of interacting vehicle and perceived risk will be greater when the interaction is with a car than a bicycle. It is predicted that risk perception will decrease as the level of experience increases and that male participants will have a higher perception of skill and lower perception of risk than females. The findings of this Queensland study will provide a valuable insight into perceived risk and the traffic behaviours of drivers and cyclists when interacting with other road users and results will be available for presentation at the Congress.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Decreased ability to perform Activities of Daily Living (ADLs) during hospitalisation has negative consequences for patients and health service delivery. Objective: To develop an Index to stratify patients at lower and higher risk of a significant decline in ability to perform ADLs at discharge. Design: Prospective two cohort study comprising a derivation (n=389; mean age 82.3 years; SD� 7.1) and a validation cohort (n=153; mean age 81.5 years; SD� 6.1). Patients and setting: General medical patients aged = 70 years admitted to three university-affiliated acute care hospitals in Brisbane, Australia. Measurement and main results: The short ADL Scale was used to identify a significant decline in ability to perform ADLs from premorbid to discharge. In the derivation cohort, 77 patients (19.8%) experienced a significant decline. Four significant factors were identified for patients independent at baseline: 'requiring moderate assistance to being totally dependent on others with bathing'; 'difficulty understanding others (frequently or all the time)'; 'requiring moderate assistance to being totally dependent on others with performing housework'; a 'history of experiencing at least one fall in the previous 90 days prior to hospital admission' in addition to 'independent at baseline', which was protective against decline at discharge. 'Difficulty understanding others (frequently or all the time)' and 'requiring moderate assistance to being totally dependent on others with performing housework' were also predictors for patients dependent in ADLs at baseline. Sensitivity, specificity, Positive Predictive Value (PPV), and Negative Predictive Value (NPV) of the DADLD dichotomised risk scores were: 83.1% (95% CI 72.8; 90.7); 60.5% (95% CI 54.8; 65.9); 34.2% (95% CI 27.5; 41.5); 93.5% (95% CI 89.2; 96.5). In the validation cohort, 47 patients (30.7%) experienced a significant decline. Sensitivity, specificity, PPV and NPV of the DADLD were: 78.7% (95% CI 64.3; 89.3); 69.8% (95% CI 60.1, 78.3); 53.6% (95% CI 41.2; 65.7); 88.1% (95% CI 79.2; 94.1). Conclusions: The DADLD Index is a useful tool for identifying patients at higher risk of decline in ability to perform ADLs at discharge.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the primary desired capabilities of any future air traffic separation management system is the ability to provide early conflict detection and resolution effectively and efficiently. In this paper, we consider the risk of conflict as a primary measurement to be used for early conflict detection. This paper focuses on developing a novel approach to assess the impact of different measurement uncertainty models on the estimated risk of conflict. The measurement uncertainty model can be used to represent different sensor accuracy and sensor choices. Our study demonstrates the value of modelling measurement uncertainty in the conflict risk estimation problem and presents techniques providing a means of assessing sensor requirements to achieve desired conflict detection performance.