531 resultados para Detail
Resumo:
This paper is aimed at investigating the effect of web openings on the plastic bending behaviour and section moment capacity of a new cold-formed steel beam known as LiteSteel beam (LSB) using numerical modelling. Different LSB sections with varying circular hole diameter and spacing were considered. A simplified but appropriate numerical modelling technique was developed for the modelling of monosymmetric sections such as LSBs subject to bending, and was used to simulate a series of section moment capacity tests of LSB flexural members with web openings. The buckling and ultimate strength behaviour was investigated in detail and the modeling technique was further improved through a comparison of numerical and experimental results. This paper describes the simplified finite element modeling technique used in this study that includes all the significant behavioural effects affecting the plastic bending behaviour and section moment capacity of LSB sections with web holes. Numerical and test results and associated findings are also presented.
Resumo:
The new cold-formed LiteSteel beam (LSB) sections have found increasing popularity in residential, industrial and commercial buildings due to their lightweight and cost-effectiveness. They have the beneficial characteristics of including torsionally rigid rectangular flanges combined with economical fabrication processes. Currently there is significant interest in using LSB sections as flexural members in floor joist systems. When used as floor joists, the LSB sections require holes in the web to provide access for inspection and various services. But there are no design methods that provide accurate predictions of the moment capacities of LSBs with web holes. In this study, the buckling and ultimate strength behaviour of LSB flexural members with web holes was investigated in detail by using a detailed parametric study based on finite element analyses with an aim to develop appropriate design rules and recommendations for the safe design of LSB floor joists. Moment capacity curves were obtained using finite element analyses including all the significant behavioural effects affecting their ultimate member capacity. The parametric study produced the required moment capacity curves of LSB section with a range of web hole combinations and spans. A suitable design method for predicting the ultimate moment capacity of LSB with web holes was finally developed. This paper presents the details of this investigation and the results
Resumo:
Buffer overflow vulnerabilities continue to prevail and the sophistication of attacks targeting these vulnerabilities is continuously increasing. As a successful attack of this type has the potential to completely compromise the integrity of the targeted host, early detection is vital. This thesis examines generic approaches for detecting executable payload attacks, without prior knowledge of the implementation of the attack, in such a way that new and previously unseen attacks are detectable. Executable payloads are analysed in detail for attacks targeting the Linux and Windows operating systems executing on an Intel IA-32 architecture. The execution flow of attack payloads are analysed and a generic model of execution is examined. A novel classification scheme for executable attack payloads is presented which allows for characterisation of executable payloads and facilitates vulnerability and threat assessments, and intrusion detection capability assessments for intrusion detection systems. An intrusion detection capability assessment may be utilised to determine whether or not a deployed system is able to detect a specific attack and to identify requirements for intrusion detection functionality for the development of new detection methods. Two novel detection methods are presented capable of detecting new and previously unseen executable attack payloads. The detection methods are capable of identifying and enumerating the executable payload’s interactions with the operating system on the targeted host at the time of compromise. The detection methods are further validated using real world data including executable payload attacks.
Resumo:
These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.
Resumo:
These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.
Resumo:
The relationship between employers and employees has been one of the most hotly debated issues in Australia in recent times. Recent legislation such as the Workplace Relations Amendment (Work Choices) Act 2005 and the subsequent Fair Work Act 2009 provides stark evidence of this. The impact of these significant developments is explored and analysed in detail in the new edition of this popular text, complete with a balanced coverage of the often contrasting viewpoints of all stakeholders - from governments, unions and employer associations, through to individual employers and employees. The text outlines different approaches to understanding the nature of the employment relationship, with a contextual background as to how this relationship has changed and developed throughout our nation's history.
Resumo:
The biomechanical or biophysical principles can be applied to study biological structures in their modern or fossil form. Bone is an important tissue in paleontological studies as it is a commonly preserved element in most fossil vertebrates, and can often allow its microstructures such as lacuna and canaliculi to be studied in detail. In this context, the principles of Fluid Mechanics and Scaling Laws have been previously applied to enhance the understanding of bone microarchitecture and their implications for the evolution of hydraulic structures to transport fluid. It has been shown that the microstructure of bone has evolved to maintain efficient transport between the nutrient supply and cells, the living components of the tissue. Application of the principle of minimal expenditure of energy to this analysis shows that the path distance comprising five or six lamellar regions represents an effective limit for fluid and solute transport between the nutrient supply and cells; beyond this threshold, hydraulic resistance in the network increases and additional energy expenditure is necessary for further transportation. This suggests an optimization of the size of bone’s building blocks (such as osteon or trabecular thickness) to meet the metabolic demand concomitant to minimal expenditure of energy. This biomechanical aspect of bone microstructure is corroborated from the ratio of osteon to Haversian canal diameters and scaling constants of several mammals considered in this study. This aspect of vertebrate bone microstructure and physiology may provide a basis of understanding of the form and function relationship in both extinct and extant taxa.
Resumo:
In photovoltaic, fuel cells and storage batteries, the low output DC voltage should be boosted. Therefore, a step-up converter is necessary to boost the low DC voltage for the DC link voltage of the inverter. The main contribution of this chapter is to electrical energy conversion in renewable energy systems based on multilevel inverters. Different configuration of renewable energy systems based on power converters will be discussed in detail. Finally, a new single inductor Multi-Output Boost (MOB) converter is proposed, which is compatible with the diode-clamped configuration. Steady state and dynamic analyses have been carried out in order to show the validity of the proposed topology. Then the joint circuit of the proposed DC-DC converter with a three-level diode-clamped converter is presented in order to have a series regulated voltage at the DC link voltage of the diode-clamped inverter. MOB converter can boost the low input DC voltage of the renewable energy sources and at the same time adjust the voltage across each capacitor to the desired voltage levels, thereby solving the main problem associated with capacitor voltage imbalance in this type of multilevel converter.
Resumo:
Objectives: This paper sought to identify the behaviour change targets for an injury prevention program; Skills for Preventing Injury in Youth, SPIY. The aim was to explore how such behaviours could subsequently be implemented and evaluated in the program. Methods and Design: The quantitative procedure involved a survey with 267 Year 8 and 9 students (mean age 13.23 years) regarding their engagement in risk-taking behaviours that may lead to injury. The qualitative study involved 30 students aged 14 to 17 years reporting their experiences of injury and risk-taking. Results: Injury risk behaviours co-occurred among three-quarters of those who reported engaging in any alcohol use or transport or violence related injury risk behaviour. Students described in detail some of these experiences. Conclusions: The selection process of identifying target behaviours for change for an injury prevention program is described. Adolescents’ description of such risk behaviours can inform the process of operationalising and contextualising program content and deciding on evaluation methodology. The design of an effective injury prevention program involves considerable preparatory work and this paper was able to describe the process of identifying the behavioural targets for change that can be operationalised and evaluated in the injury prevention program, SPIY.
Resumo:
The focus of this thesis is discretionary work effort, that is, work effort that is voluntary, is above and beyond what is minimally required or normally expected to avoid reprimand or dismissal, and is organisationally functional. Discretionary work effort is an important construct because it is known to affect individual performance as well as organisational efficiency and effectiveness. To optimise organisational performance and ensure their long term competitiveness and sustainability, firms need to be able to induce their employees to work at or near their peak level. To work at or near their peak level, individuals must be willing to supply discretionary work effort. Thus, managers need to understand the determinants of discretionary work effort. Nonetheless, despite many years of scholarly investigation across multiple disciplines, considerable debate still exists concerning why some individuals supply only minimal work effort whilst others expend effort well above and beyond what is minimally required of them (Le. they supply discretionary work effort). Even though it is well recognised that discretionary work effort is important for promoting organisational performance and effectiveness, many authors claim that too little is being done by managers to increase the discretionary work effort of their employees. In this research, I have adopted a multi-disciplinary approach towards investigating the role of monetary and non-monetary work environment characteristics in determining discretionary work effort. My central research questions were "What non-monetary work environment characteristics do employees perceive as perks (perquisites) and irks (irksome work environment characteristics)?" and "How do perks, irks and monetary rewards relate to an employee's level of discretionary work effort?" My research took a unique approach in addressing these research questions. By bringing together the economics and organisational behaviour (OB) literatures, I identified problems with the current definition and conceptualisations of the discretionary work effort construct. I then developed and empirically tested a more concise and theoretically-based definition and conceptualisation of this construct. In doing so, I disaggregated discretionary work effort to include three facets - time, intensity and direction - and empirically assessed if different classes of work environment characteristics have a differential pattern of relationships with these facets. This analysis involved a new application of a multi-disciplinary framework of human behaviour as a tool for classifying work environment characteristics and the facets of discretionary work effort. To test my model of discretionary work effort, I used a public sector context in which there has been limited systematic empirical research into work motivation. The program of research undertaken involved three separate but interrelated studies using mixed methods. Data on perks, irks, monetary rewards and discretionary work effort were gathered from employees in 12 organisations in the local government sector in Western Australia. Non-monetary work environment characteristics that should be associated with discretionary work effort were initially identified through a review of the literature. Then, a qualitative study explored what work behaviours public sector employees perceive as discretionary and what perks and irks were associated with high and low levels of discretionary work effort. Next, a quantitative study developed measures of these perks and irks. A Q-sorttype procedure and exploratory factor analysis were used to develop the perks and irks measures. Finally, a second quantitative study tested the relationships amongst perks, irks, monetary rewards and discretionary work effort. Confirmatory factor analysis was firstly used to confirm the factor structure of the measurement models. Correlation analysis, regression analysis and effect-size correlation analysis were used to test the hypothesised relationships in the proposed model of discretionary work effort. The findings confirmed five hypothesised non-monetary work environment characteristics as common perks and two of three hypothesised non-monetary work environment characteristics as common irks. Importantly, they showed that perks, irks and monetary rewards are differentially related to the different facets of discretionary work effort. The convergent and discriminant validities of the perks and irks constructs as well as the time, intensity and direction facets of discretionary work effort were generally confirmed by the research findings. This research advances the literature in several ways: (i) it draws on the Economics and OB literatures to redefine and reconceptualise the discretionary work effort construct to provide greater definitional clarity and a more complete conceptualisation of this important construct; (ii) it builds on prior research to create a more comprehensive set of perks and irks for which measures are developed; (iii) it develops and empirically tests a new motivational model of discretionary work effort that enhances our understanding of the nature and functioning of perks and irks and advances our ability to predict discretionary work effort; and (iv) it fills a substantial gap in the literature on public sector work motivation by revealing what work behaviours public sector employees perceive as discretionary and what work environment characteristics are associated with their supply of discretionary work effort. Importantly, by disaggregating discretionary work effort this research provides greater detail on how perks, irks and monetary rewards are related to the different facets of discretionary work effort. Thus, from a theoretical perspective this research also demonstrates the conceptual meaningfulness and empirical utility of investigating the different facets of discretionary work effort separately. From a practical perspective, identifying work environment factors that are associated with discretionary work effort enhances managers' capacity to tap this valuable resource. This research indicates that to maximise the potential of their human resources, managers need to address perks, irks and monetary rewards. It suggests three different mechanisms through which managers might influence discretionary work effort and points to the importance of training for both managers and non-managers in cultivating positive interpersonal relationships.
Resumo:
The following exegesis will detail the key advantages and disadvantages of combining a traditional talk show genre with a linear documentary format using a small production team and a limited budget in a fast turnaround weekly environment. It will deal with the Australian Broadcasting Corporation series Talking Heads, broadcast weekly in the early evening schedule for the network at 18.30 with the presenter Peter Thompson. As Executive Producer for the programme at its inception I was responsible for setting it up for the ABC in Brisbane, a role that included selecting most of the team to work on the series and commissioning the music, titles and all other aspects required to bring the show to the screen. What emerged when producing this generic hybrid will be examined at length, including: „h The talk show/documentary hybrid format needs longer than 26¡¦30¡¨ to be entirely successful. „h The type of presenter ideally suited to the talk show/documentary format requires someone who is genuinely interested in their guests and flexible enough to maintain the format against tangential odds. „h The use of illustrative footage shot in a documentary style narrative improves the talk show format. iv „h The fast turnaround of the talk show/documentary hybrid puts tremendous pressure on the time frames for archive research and copyright clearance and therefore needs to be well-resourced. „h In a fast turnaround talk show/documentary format the field components are advantageous but require very low shooting ratios to be sustainable. „h An intimate set works best for a talk show hybrid like this. Also submitted are two DVDs of recordings of programmes I produced and directed from the first and third series. These are for consideration in the practical component of this project and reflect the changes that I made to the series.
Resumo:
Individuals, organizations, and governments are increasingly becoming aware of the necessity of sustainability in living, organizing, performing, and managing work. In this context, “green IS” has become an established colloquial term, acknowledging that information technology, corporate information systems, and the surrounding practices are both a contributor to the sustainability challenge and a potential enabler for green and sustainable practices. To date, however, there are few reported studies on the role of information systems for the challenge, and solution, of sustainability. This paper presents results from a case study of a world-wide operating IT software solution provider that is engaged in the development and adoption of sustainable practices. Our study suggests that the adoption of sustainable practices comes along with a number of particularities. We found information technology to be a key enabler of transparency about the progress of sustainability operations. We further found personal, motivator factors as well as organizational factors such as business inclusion, strategy definition, and a dialectic top-management and bottom-up support, to play a role in enabling a company to manage their sustainability. We describe a set of conjectures forthcoming from our case analysis, and detail some implications for further research in this area.
Resumo:
This project is the result of a collaborative design process involving QUT School of Design, and AREN Consulting and ZIAD (Zheijiang Provincial Institute of Architectural Design and Research). This project is the submission prepared by the above partnership for an invited international design competition, promoted by Hangzhou City, China. ---------- This major urban design and architecture project is for a large transport oriented development on the new Hangzhou Subway system. The development, covering several city blocks, includes the provision of residential, retail, education, commercial, and transport infrastructure; integrated with rail, bus and ferry systems. ---------- The design strategies are based on the development or artificial land forms; the cutting of new canals, raising of the ground plane, and metaphoric reference to the Yellow Mountains (explored in the detail of the central ‘ridge’ of built form). Further to this, the project explores the integration of sustainable technologies and philosophies with large scale building projects in a subtropical context.
Resumo:
Over the past decade privatised capital city airports in Australia have planned developed a range of non aviation commercial and retail land uses on airport land. Many surrounding municipalities consider this development in conflict with existing regional land use planning. Conversely airport operators are alarmed at continued urban consolidation and encroachment of incompatible regional development. Land use planning within and surrounding Australian capital city airports does not support compatible and integrated land use. It is currently a fragmented process due to: 1) current legislative and policy frameworks; 2) competing stakeholder priorities and interests; and 3) inadequate coordination and disjointed decision-making. This paper will examine privatised Australian airport development and consider three case studies to detail the context of airport and regional land use planning. A series of stakeholder workshops have served to inform the procedural dynamics and relationships between airport and regional decision-making. This exploratory research will assist in informing the knowledge gaps between aviation, airport development and broader urban land use policy. This paper will provide recommendations to enhance approaches to land use planning for airports and adjacent metropolitan regions in Australia and overseas.