470 resultados para Construction Engineering
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
The basic researches about constructability issue done in different countries demonstrate the potential power of this concept to affect the total goals of the construction projects which can lead to significant cost saving, time saving and better quality via considering the contractors’ construction experience in earlier construction project phases. The present research assesses the familiarity of Malaysian building contractors with constructability concept and activities; then it tests their general opinions on its implementation in different construction phases and projects. As the result, some descriptive studies are done on amount of contractors’ familiarity with this term among various kinds of contractors, projects and contracts which can illustrate constructability implementation level among Malaysian contractors. The results of this study show that Malaysian contractors are not all familiar enough with this term and there are still some barriers that prevent them from taking part in its activities completely. The differences in amount of familiarity with constructability matter and its terms of implementation are quite obvious among various types of participants.
Resumo:
After the primary researches on constructability issue which were implemented in United States, United Kingdom and Australia, more explorations were applied on that in order to assess this unique scientific fact in East Asian country of Malaysia. Based on the latest researches done on constructability concept in Malaysia, the most Critical Constructability Activities (CCAs) are defined according to amount of contractors’ participation in each activity and amount of gap between actual and potential effects of each of them on achieving the overall objectives of the construction projects with more cost and time savings and better quality which is the whole aim of a beneficial constructability activity. The present research aims to assess the current findings on CCAs in order to identify the types of contractors and projects which these CCAs are getting performed in and also the types of contracts is used in these CCAs. Finally it was found that there are some significant differences in amount of contractors’ involvement in CCAs among various considered independent variables. This study uses the former researches to help Malaysian construction stakeholders to find out the barriers of constructability implementation in building projects via giving more details on application of CCAs among different IVs.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.
Resumo:
This paper presents an automated image‐based safety assessment method for earthmoving and surface mining activities. The literature review revealed the possible causes of accidents on earthmoving operations, investigated the spatial risk factors of these types of accident, and identified spatial data needs for automated safety assessment based on current safety regulations. Image‐based data collection devices and algorithms for safety assessment were then evaluated. Analysis methods and rules for monitoring safety violations were also discussed. The experimental results showed that the safety assessment method collected spatial data using stereo vision cameras, applied object identification and tracking algorithms, and finally utilized identified and tracked object information for safety decision making.
Resumo:
This paper presents the results of a series of tension tests on CFRP bonded steel plate double strap joints. The main aim of this research is to provide detailed understanding of bond characteristics using experimental and numerical analysis of strengthened double strap joints under tension. A parametric study has been performed by numerical modelling with the variables of CFRP bond lengths, adhesive maximum strain and adhesive layer thicknesses. Finally, bond-slip models are proposed for three different types of adhesives within the range of the parametric study.
Resumo:
Purpose The purpose of this paper is to explore the process, and analyse the implementation of constructability improvement and innovation result during the planning and design for sea water intake structure of fertilizer plant project. Design/methodology/approach The research methodology approach is case study method at project level. This constructability improvement process was investigated by using constructability implementation check lists, direct observation, documented lesson learned analysis and key personnel interviews. Findings The case study shows that the implementation of constructability during planning and design stage for this sea water intake structure has increased the project performance as well as improved the schedule by 5 months (14.21%) and reduced the project cost by 15.35%. Research limitations/implications This case study was limited to three (3) previous sea water intake projects as references and one (1) of new method sea water intake structure at fertilizer plant project. Practical implications A constructability improvement check list using theory and lesson learned for the specific construction project was documented. Originality/value The findings support the relevant study of constructability and provide specific lesson learned for three (3) previous project and one (1) of the new innovation method of the construction project and documented by the company.
Resumo:
The effective implementation of such an ISO 9001 Quality Management System (QMS) in construction companies requires a proper and full implementation of the system to allow companies to improve the way they operate, by this means increasing profitability and market share, producing innovative and sustainable construction products, or improving employee and customer satisfaction. In light of this, this paper discusses the current status of QMS implementation, particularly related to the twenty elements of ISO 9001 within the grade 7 (G-7) category of Indonesian construction companies. A survey was conducted involving 403 respondents from 77 companies, to solicit an evaluation of the current implementation levels of the ISO 9001 elements. The survey findings indicated that for a large percentage of the sector surveyed they had ‘not so fully implemented’ the elements. Scrutiny of the data had also indicated elements that are ‘minimally implemented’, whilst none of the elements fell in the category of ‘fully implemented’. Based on these findings, it is suggested that the G-7 contractors may need to fully commit to practicing control of customer-supplied product and statistical techniques in order to enhance an effective implementation of ISO 9001 elements for ensuring better quality performance. These two elements are recognized as the least implemented of the quality elements.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
Infrastructure organizations are operating in an increasingly challenging business environment as a result of globalization, privatization and deregulation. In an external business environment that is constantly changing, extant literature on strategic management advocates the need to focus on factors internal to the organization such as resources and capabilities to sustain their performance. Specifically, they need to develop dynamic capabilities in order to survive and prosper under conditions of change. The aim of this paper is to explore the dynamic capabilities needed in the management of transport infrastructure assets using a multiple case study research strategy. This paper produced a number of findings. First, the empirical evidence showed that the core infrastructure asset management processes are capacity management, options evaluation, procurement & delivery, maintenance management, and asset information management. Second, the study identified five dynamic capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets in an increasingly dynamic business environment.
Resumo:
Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.
Resumo:
Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.