114 resultados para Cashew Cultivation s Productive Chain
Resumo:
Waitrose has a strong commitment to organic farming but also uses products from 'conventional' farms. At the production stage, Waitrose own-label products are fully traceable, GM-free and all suppliers undergo a detailed assessment programme based on current best practice. Crop suppliers to Waitrose operate an authenticity programme to certify that each assignment is GM-free and produce is screened for pesticide residues. Waitrose sources conventional crops grown from 'Integrated Crop Management Systems' (ICMS) using best horticultural practices. The 'Assured Product' scheme regulates all UK produce to ICMS standards and these audits are being extended worldwide. Business is withdrawn from suppliers who fail the audit. In relation to this, Waitrose has increased its Fairtrade range as in its view 'Buying these products provides direct additional benefit to workers in the developing countries where they are produced and assists marginal producers by giving them access to markets they would not otherwise have'. Currently, Waitrose is developing its own sustainable timber assessment criteria. For livestock, protocols are in place to ensure that animals are reared under the 'most natural conditions possible' and free range produce is offered where animals have access to open space although some produce is not from free-range animals. Waitrose also use a 'Hazards Analysis Critical Points' system to identify food safety hazards that occur at any stage from production to point of sale and to ensure that full measures are in place to control them. In addition, mechanisms have been implemented to reduce fuel use and hence reduce CO2 emissions in the transport of products and staff, and to increase the energy use efficiency of refrigeration systems which account for approximately 60% of Waitrose energy use.
Resumo:
The structures of the cyclic imides cis-2-(2-fluorophenyl)-3a,4,5,6,7,7a-hexahydroisoindole-1,3-dione, C14H14FNO2, (I), and cis-2-(4-fluorophenyl)-3a,4,5,6,7,7a-hexahydroisoindoline-1,3-dione, C14H14FNO2, (III), and the open-chain amide acid rac-cis-2-[(3-fluorophenyl)carbamoyl]cyclohexane-1-carboxylic acid, C14H16FNO3, (II), are reported. Cyclic imides (I) and (III) are conformationally similar, with comparable ring rotations about the imide N-Car bond [the dihedral angles between the benzene ring and the five-membered isoindole ring are 55.40 (8)° for (I) and 51.83 (7)° for (III)]. There are no formal intermolecular hydrogen bonds involved in the crystal packing of either (I) or (III). With the acid (II), in which the meta-related F-atom substituent is rotationally disordered (0.784:0.216), the amide group lies slightly out of the benzene plane [the interplanar dihedral angle is 39.7 (1)°]. Intermolecular amide-carboxyl N-HO hydrogen-bonding interactions between centrosymmetrically related molecules form stacks extending down b, and these are linked across c by carboxyl-amide O-HO hydrogen bonds, giving two-dimensional layered structures which lie in the (011) plane. The structures reported here represent examples of compounds analogous to the phthalimides or phthalanilic acids and have little precedence in the crystallographic literature.
Resumo:
The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.
Resumo:
Abstract: The radical pair that results from photolysis of adenosylcob(II1)alamin (AdoCbl"') undergoes primary geminate recombination with a first-order rate constant of 1 x lo9 s-l. In contrast, methylcob(II1)alamin (CH3Cbl"') and aristeromicylcob(II1)alamin (AriCblII', the carbocyclic analogue of AdoCbl"' in which the ribofuranose ring oxygen has been replaced with a methylene group) does not undergo primary geminate recombination. The ribofwanose group enables a high rate of geminate recombination in the [Ado' Cbl"'] radical pair. This may be due to a stereoelectronic (p-anomeric) effect that maintains a pyramidal geometry at the 5'-carbon of the 5'-deoxyadenosyl radical, or it may be due to hindered rotation about the C4t-C5, bond such that /?-elimination to the olefin is prevented. Recombination in the geminate singlet radical pair is in competition with diffusive escape to form a solvent-separated radical pair. Hyperfine coupling from Co" promotes intersystem crossing to the triplet radical pair (Chagovetz, A. M.; Grissom, C. B. J. Am. Chem. SOC. 1993, 115, 12152). Recombination of the [CH3' Cbl"] radical pair is not prevented by a lack of intersystem crossing, as neither unlabeled or I3C-labeled CH3Cbl"' undergoes geminate recombination. There is only a small difference in the rate of diffusive recombination in the solvent cage for AdoCbl"', AriCbl"', and CH3Cbl"' following photolysis: 2.01 x 10" s-l, 2.20 x lo4 s-l, and 1.16 x lo4 s-l. The rate of diffusive recombination is limited by productive collisions and not by radical geometry or intersystem crossing. The CF3' radical that results from photolysis of (trifluoromethyl)cob(III)alamin (CF3Cbl"') maintains its pyramidal geometry and undergoes faster diffusive recombination in the solvent cage at 51 x lo4 s-l. The C-Co bond dissociation enthalpy in AriCbl"' is 37 f 1.4 kcaymol. The profound difference in geminate recombination rates for AdoCbl"' and CH3Cbl"' is consistent with their different biological roles as enzymatic cofactors: AdoCbl"' is an initiator of radical chain chemistry in the active site, whereas CH3Cbl"' is a methyl group donor in an S~2-type process.
Resumo:
Organizations adopt a Supply Chain Management System (SCMS) expecting benefits to the organization and its functions. However, organizations are facing mounting challenges to realizing benefits through SCMS. Studies suggest a growing dissatisfaction among client organizations due to an increasing gap between expectations and realization of SCMS benefits. Further, reflecting the Enterprise System studies such as Seddon et al. (2010), SCMS benefits are also expected to flow to the organization throughout its lifecycle rather than being realized all at once. This research therefore proposes to derive a lifecycle-wide understanding of SCMS benefits and realization to derive a benefit expectation management framework to attain the full potential of an SCMS. The primary research question of this study is: How can client organizations better manage their benefit expectations of SCM systems? The specific research goals of the current study include: (1) to better understand the misalignment of received and expected benefits of SCM systems; (2) to identify the key factors influencing SCM system expectations and to develop a framework to manage SCMS benefits; (3) to explore how organizational satisfaction is influenced by the lack of SCMS benefit confirmation; and (4) to explore how to improve the realization of SCM system benefits. Expectation-Confirmation Theory (ECT) provides the theoretical underpinning for this study. ECT has been widely used in the consumer behavior literature to study customer satisfaction, post-purchase behavior and service marketing in general. Recently, ECT has been extended into Information Systems (IS) research focusing on individual user satisfaction and IS continuance. However, only a handful of studies have employed ECT to study organizational satisfaction on large-scale IS. The current study will enrich the research stream by extending ECT into organizational-level analysis and verifying the preliminary findings of relevant works by Staples et al. (2002), Nevo and Chan (2007) and Nevo and Wade (2007). Moreover, this study will go further trying to operationalize the constructs of ECT into the context of SCMS. The empirical findings of the study commence with a content analysis, through which 41 vendor reports and academic reports are analyzed yielding sixty expected benefits of SCMS. Then, the expected benefits are compared with the benefits realized at a case organization in the Fast Moving Consumer Goods industry sector that had implemented a SAP Supply Chain Management System seven years earlier. The study develops an SCMS Benefit Expectation Management (SCMS-BEM) Framework. The comparison of benefit expectations and confirmations highlights that, while certain benefits are realized earlier in the lifecycle, other benefits could take almost a decade to realize. Further analysis and discussion on how the developed SCMS-BEM Framework influences ECT when applied in SCMS was also conducted. It is recommended that when establishing their expectations of the SCMS, clients should remember that confirmation of these expectations will have a long lifecycle, as shown in the different time periods in the SCMS-BEM Framework. Moreover, the SCMS-BEM Framework will allow organizations to maintain high levels of satisfaction through careful mitigation and confirming expectations based on the lifecycle phase. In addition, the study reveals that different stakeholder groups have different expectations of the same SCMS. The perspective of multiple stakeholders has significant implications for the application of ECT in the SCMS context. When forming expectations of the SCMS, the collection of organizational benefits of SCMS should represent the perceptions of all stakeholder groups. The same mechanism should be employed in the measurements of received SCMS benefits. Moreover, for SCMS, there exists interdependence of the satisfaction among the various stakeholders. The satisfaction of decision-makers or the authorized staff is not only driven by their own expectation confirmation level, it is also influenced by the confirmation level of other stakeholders‘ expectations in the organization. Satisfaction from any one particular stakeholder group can not reflect the true satisfaction of the client organization. Furthermore, it is inferred from the SCMS-BEM Framework that organizations should place emphasis on the viewpoints of the operational and management staff when evaluating the benefits of SCMS in the short and middle term. At the same time, organizations should be placing more attention on the perspectives of strategic staff when evaluating the performance of the SCMS in the long term.
Resumo:
The structures of the compounds from the reaction of cis-cyclohexane-1,2-dicarboxylic anhydride with 4-chloroaniline [rac-N-(4-chlorophenyl)-2-carboxycycloclohexane-1-carboxamide] (1), 4-bromoaniline [2-(4-bromophenyl)-perhydroisoindolyl-1,3-dione] (2) and 3-hydroxy-4-carboxyaniline (5-aminosalicylic acid) [2-(3-hydroxy-4-carboxyphenyl)-perhydroisoindolyl-1,3-dione] (3) have been determined at 200 K. Crystals of the open-chain amide carboxylic acid 1 are orthorhombic, space group Pbcn, with unit cell dimensions a = 20.1753(10), b = 8.6267(4), c = 15.9940(9) Å, and Z = 8. Compounds 2 and 3 are cyclic imides, with 1 monoclinic having space group P21 and cell dimensions a = 11.5321(3), b = 6.7095(2), c = 17.2040(5) Å, β = 102.527(3)o. Compound 3 is orthorhombic with cell dimensions a = 6.4642(3), b = 12.8196(5), c = 16.4197(7) Å. Molecules of 1 form hydrogen-bonded cyclic dimers which are extended into a two-dimensional layered structure through amide-group associations: 3 forms into one-dimensional zigzag chains through carboxylic acid…imide O-atom hydrogen bonds, while compound 2 is essentially unassociated. With both cyclic imides 2 and 3, disorder is found which involves the presence of partial enantiomeric replacement of the cis-cyclohexane-1,2-substituted ring systems.
Resumo:
Motor unit number estimation (MUNE) is a method which aims to provide a quantitative indicator of progression of diseases that lead to loss of motor units, such as motor neurone disease. However the development of a reliable, repeatable and fast real-time MUNE method has proved elusive hitherto. Ridall et al. (2007) implement a reversible jump Markov chain Monte Carlo (RJMCMC) algorithm to produce a posterior distribution for the number of motor units using a Bayesian hierarchical model that takes into account biological information about motor unit activation. However we find that the approach can be unreliable for some datasets since it can suffer from poor cross-dimensional mixing. Here we focus on improved inference by marginalising over latent variables to create the likelihood. In particular we explore how this can improve the RJMCMC mixing and investigate alternative approaches that utilise the likelihood (e.g. DIC (Spiegelhalter et al., 2002)). For this model the marginalisation is over latent variables which, for a larger number of motor units, is an intractable summation over all combinations of a set of latent binary variables whose joint sample space increases exponentially with the number of motor units. We provide a tractable and accurate approximation for this quantity and also investigate simulation approaches incorporated into RJMCMC using results of Andrieu and Roberts (2009).
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.