708 resultados para House construction
Resumo:
Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.
Resumo:
This paper investigates the mutual relations of three current drivers of construction: lean construction, building information modelling and sustainability. These drivers are based on infrequently occurring changes, only incidentally simultaneous, in their respective domains. It is contended that the drivers are mutually supportive and thus synergistic. They are aligned in the sense that all require, promote or enable collaboration. It is argued that these three drivers should be implemented in a unified manner for rapid and robust improvements in construction industry performance and the quality of the constructed facilities and their benefits for stakeholders and wider society.
Resumo:
Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide a conceptual analysis of the interaction of lean construction and BIM for improving construction. This was investigated by compiling a detailed listing of lean construction principles and BIM functionalities which are relevant from this perspective. These were drawn from a detailed literature survey. A research framework for analysis of the interaction between lean and BIM was then compiled. The goal of the framework is to both guide and stimulate research; as such, the approach adopted up to this point is constructive. Ongoing research has identified 55 such interactions, the majority of which show positive synergy between the two.
Resumo:
Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.
Resumo:
This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.
Resumo:
Uanda house is of historical importance to Queensland both in terms of its architectural design and its social history. Uanda is a low set, single story house built in 1928, located in the inner city Brisbane suburb of Wilston. Architecturally, the house has a number of features that distinguish it from the surrounding bungalow influenced inter-war houses. The house has been described as a Queensland style house with neo-Georgian influences. Historically, it is associated with the entry of women into the profession of architecture in Queensland. Uanda is the only remaining intact work of architect/draftswoman Nellie McCredie and one of a very few examples of works by pioneering women architects in Queensland. The house was entered into the Queensland Heritage Register, in 2000, after an appeal against Brisbane City Council’s refusal of an application to demolish the house was disputed in the Queensland Planning and Environment court in 1998/1999. In the court’s report, Judge Robin QC, DCJ, stated that, “The importance of preserving women's history and heritage, often previously marginalised or lost, is now accepted at government level, recognising that role models are vital for bringing new generations of women into the professions and public life.” While acknowledging women’s contribution to the profession of architecture is an important endeavour, it also has the potential to isolate women architects as separate to a mainstream history of architecture. As Julie Willis writes, it can imply an atypical, feminine style of architecture. What is the impact or potential implications of recognising heritage buildings designed by women architects? The Judge also highlights the absence of a recorded history of unique Brisbane houses and questions the authority of the heritage register. This research looks at these points of difference through a case study of the Uanda house. The paper will investigate the processes of adding the house to the heritage register, the court case and existing research on Nellie McCredie and Uanda House.
Resumo:
Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.
Resumo:
This study examines the process by which newly recruited nuclear engineering and technical staff came to understand, define, think, feel and behave within a distinct group that has a direct contribution to the organization's overall emphasis on a culture of reliability and system safety. In the field of organizational behavior the interactive model of social identity formation has been recently proposed to explain the process by which the internalization of shared norms and values occurs, an element critical in identity formation. Using this rich model of organizational behavior we analyzed multiple sources of data from nine new hires over a period of three years. This was done from the time they were employed to investigate the construction of social identity by new entrants entering into a complex organizational setting reflected in the context of a nuclear facility. Informed by our data analyses, we found support for the interactive model of social identity development and report the unexpected finding that a newly appointed member's age and level of experience appears to influence the manner in which they adapt, and assimilate into their surroundings. This study represents an important contribution to the safety and reliability literature as it provides a rich insight into the way newly recruited employees enact the process by which their identities are formed and hence act, particularly under conditions of duress or significant organizational disruption in complex organizational settings.
Resumo:
This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.
Resumo:
The decision of Wilson J in Calvert v Nickless Ltd [2004] QSC 449 involves significant questions of interpretation of sections 315 and 317 of the Workcover Queensland Act 1996 (Qld) relating to claims for damages for future economic loss and for gratuitous services.
Resumo:
If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.
Resumo:
In Smit v Chan [2001] QSC 493 (Supreme Court of Queensland, S1233 of 1995, Mullins J, 21.12.2001) the sixth defendant successfully obtained an order that a complex medical negligence action be tried without a jury. This was the first application to be decided under r474 of UCPR 1999, and the decision is a significant precedent for defendants in similar cases who want to avoid the unpredictability of outcome and the inflated damages awards sometimes associated with jury trials.
Resumo:
Background Early feeding practices lay the foundation for children’s eating habits and weight gain. Questionnaires are available to assess parental feeding but overlapping and inconsistent items, subscales and terminology limit conceptual clarity and between study comparisons. Our aim was to consolidate a range of existing items into a parsimonious and conceptually robust questionnaire for assessing feeding practices with very young children (<3 years). Methods Data were from 462 mothers and children (age 21–27 months) from the NOURISH trial. Items from five questionnaires and two study-specific items were submitted to a priori item selection, allocation and verification, before theoretically-derived factors were tested using Confirmatory Factor Analysis. Construct validity of the new factors was examined by correlating these with child eating behaviours and weight. Results Following expert review 10 factors were specified. Of these, 9 factors (40 items) showed acceptable model fit and internal reliability (Cronbach’s α: 0.61-0.89). Four factors reflected non-responsive feeding practices: ‘Distrust in Appetite’, ‘Reward for Behaviour’, ‘Reward for Eating’, and ‘Persuasive Feeding’. Five factors reflected structure of the meal environment and limits: ‘Structured Meal Setting’, ‘Structured Meal Timing’, ‘Family Meal Setting’, ‘Overt Restriction’ and ‘Covert Restriction’. Feeding practices generally showed the expected pattern of associations with child eating behaviours but none with weight. Conclusion The Feeding Practices and Structure Questionnaire (FPSQ) provides a new reliable and valid measure of parental feeding practices, specifically maternal responsiveness to children’s hunger/satiety signals facilitated by routine and structure in feeding. Further validation in more diverse samples is required.
Resumo:
Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.
Resumo:
The relationship between public transportation and home values has proven to be complex, with studies providing divergent findings. Using Victorian Valuer General Data for 2009, this paper applies a hedonic pricing approach to the Melbourne metropolitan housing market in order to estimate the impacts of proximity to a train station on residential property prices. The findings reveal a negative impact on dwelling price for those properties within 125 metres from a train station and a positive relationship between dwelling price and proximity for properties more than 125 metres away.