621 resultados para Portfolio construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Distance education has gone through rapid expansion over the years. Many Australian universities are pushing the use of distance education in delivering construction education programs. However, the critical success factors (CSFs) in distance learning construction programs (DLCPs) are not fully understood. More importantly, students’ demographic features may affect the selection of distance education technologies. Situation-matching strategies should therefore be taken by universities or institutions with different student cohorts. A survey is adopted in Central Queensland University (CQU) to identify and rank the critical success factors in a DLCP in Australia where there is a significant number of earner-learners and students with low socioeconomic background. The findings suggest that the most important CSFs include access to computers and internet, reliability of web-based learning sites, high relevance and clarity of learning materials and assessment items, the availability of web-based learning sites that can be easily manipulated, and the capability of the instructors to provide well-structured courses. The findings also suggest that students with low socioeconomic background have more rigorous requirements on interface design, instructors’ support, and the integration of practical components into courses. The results provide good guidance of the design and delivery of DLCPs and will be useful for universities and institutions that are seeking to implement the distance mode in construction education.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we observe that in the seminal work on indifferentiability analysis of iterated hash functions by Coron et al. and in subsequent works, the initial value (IV) of hash functions is fixed. In addition, these indifferentiability results do not depend on the Merkle–Damgård (MD) strengthening in the padding functionality of the hash functions. We propose a generic n -bit-iterated hash function framework based on an n -bit compression function called suffix-free-prefix-free (SFPF) that works for arbitrary IV s and does not possess MD strengthening. We formally prove that SFPF is indifferentiable from a random oracle (RO) when the compression function is viewed as a fixed input-length random oracle (FIL-RO). We show that some hash function constructions proposed in the literature fit in the SFPF framework while others that do not fit in this framework are not indifferentiable from a RO. We also show that the SFPF hash function framework with the provision of MD strengthening generalizes any n -bit-iterated hash function based on an n -bit compression function and with an n -bit chaining value that is proven indifferentiable from a RO.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rapid urbanization in developing countries such as China has been creating unprecedented opportunities for the adoption of sustainable construction (SC). Owner, as a key driver of urbanization, plays an influential role for other stakeholders to undertake SC practices. However, lacking their demands and requirements of owners were regarded as the main barriers for the adoption of SC. Notwithstanding the diversity of previous studies on the barriers to SC, there is a dearth of research from the owner’s perspective. This paper presents an empirical study identifying the critical factors impeding the adoption of SC from the owners’ point of view. A list of 25 factors was preliminarily identified through extensive literature review and interviews with industry professionals. This was followed by a questionnaire survey to collect owners’ opinions on the relative importance of these factors. Using factor analysis, seven most critical factors are identified, namely, economic feasibility, awareness, support from project stakeholders, legislation and regulation, operability of SC, resource risk, and project management model. The research findings show that economic feasibility, awareness, legislation and regulation are the most important factors impeding owners in adopting SC practices. This implied that the government plays a vital role in removing the barriers impeding the greater adoption of SC by building owners in China. This is helpful for a transition to the low carbon urbanization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

My concern in this commentary is the discrepancy between cultural psychologists' theoretical claims that meanings are co-constructed by, with and for individuals in ongoing social interaction, and their research practices where researcher's and research participant's meaning-making processes are separated in time into sequential turns. I argue for the need to live up to these theoretical assumptions, by making both the initial research encounter and the researcher's later interpretation process more co-constructive. I suggest making the initial research encounter more co-constructive by paying attention to these moments when the negotiated flow of interaction between researcher and research participant breaks down, for it allows the research participant's meaning-making to be traced and makes the researcher's efforts towards meaning more explicit. I propose to make the later interpretation process more co-constructive by adopting a more open-ended and dialogical way of writing that is specifically addressed to research participants and invites them to actively engage with researcher's meaning-making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to examine equal employment policies in Australia’s male-dominated construction industry and categorise the types of activities undertaken against an equal employment typology to identify links to outcomes for women in the form of increased participation and management. Design/methodology/approach To explore the issue of low representation of women in construction through the content analysis of 83 construction organisations’ equal employment opportunity (EEO) reports. Findings This industry is not engaging with equal employment issues and the numbers of women working in the industry and/or management are based on individual decision rather than an institutional commitment to equality in diversity. Research limitations/implications Australian legislation mandates organisational reporting of relevant data and offers public access to this information offering a unique data set. Practical implications An ageing population means that the predominately older male workforce is leaving construction in greater numbers with fewer potential replacements making new labour markets a vital consideration. Social implications Legislation and organisational policies designed to promote EEO for women have existed in numerous countries for decades. One objective of this legislation was to reduce male domination in senior positions and industries/occupations where women were under-represented. Despite this, few women are employed in construction in operational or management roles worldwide. Originality/value This study offers a comprehensive analysis of a male-dominated industry in one jurisdiction rather than a few selected cases and uses a broader rigorous typology for analysis that acknowledges both equal and different treatment options.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We show the first deterministic construction of an unconditionally secure multiparty computation (MPC) protocol in the passive adversarial model over black-box non-Abelian groups which is both optimal (secure against an adversary who possesses any tconstruction based on coloring of planar graphs. More specifically, following the result of Desmedt et al. (2012) that the problem of MPC over non-Abelian groups can be reduced to finding a t-reliable n-coloring of planar graphs, we show the construction of such a graph which allows a path from the input nodes to the output nodes when any t-party subset is in the possession of the adversary. Unlike the deterministic constructions from Desmedt et al. (2012) our construction has subexponential complexity and is optimal at the same time, i.e., it is secure for any t

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large scale highway agency. Three dimensions of DRB impact were assessed: (1)influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10 year period (2000-2009).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses a Dumber of key issues for the development of robust, obstacle detection systems for autonomous mining and construction vehicles. A taxonomy of obstacle detection systems is described; An overview of the state-of- the-art in obstacle detection for outdoor autonomous vehicles is presented with their applicability to the mining and construction environments noted. The issue of so-called fail-safe obstacle detection is then discussed. Finally, we describe the development of an obstacle detection system for a mining vehicle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the issue of sensing and control for stabilizing a swinging load. Our work has focused in particular on the dragline as used for overburden stripping in open-pit coal mining, but many of the principles would also be applicable to construction cranes. Results obtained from experimental work on a full-scale production dragline are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.