577 resultados para NORTH KARELIA PROJECT
Resumo:
Background The prevalence of type 2 diabetes is rising internationally. Patients with diabetes have a higher risk of cardiovascular events accounting for substantial premature morbidity and mortality, and health care expenditure. Given healthcare workforce limitations, there is a need to improve interventions that promote positive self-management behaviours that enable patients to manage their chronic conditions effectively, across different cultural contexts. Previous studies have evaluated the feasibility of including telephone and Short Message Service (SMS) follow up in chronic disease self-management programs, but only for single diseases or in one specific population. Therefore, the aim of this study is to evaluate the feasibility and short-term efficacy of incorporating telephone and text messaging to support the care of patients with diabetes and cardiac disease, in Australia and in Taiwan. Methods/design A randomised controlled trial design will be used to evaluate a self-management program for people with diabetes and cardiac disease that incorporates the use of simple remote-access communication technologies. A sample size of 180 participants from Australia and Taiwan will be recruited and randomised in a one-to-one ratio to receive either the intervention in addition to usual care (intervention) or usual care alone (control). The intervention will consist of in-hospital education as well as follow up utilising personal telephone calls and SMS reminders. Primary short term outcomes of interest include self-care behaviours and self-efficacy assessed at baseline and four weeks. Discussion If the results of this investigation substantiate the feasibility and efficacy of the telephone and SMS intervention for promoting self management among patients with diabetes and cardiac disease in Australia and Taiwan, it will support the external validity of the intervention. It is anticipated that empirical data from this investigation will provide valuable information to inform future international collaborations, while providing a platform for further enhancements of the program, which has potential to benefit patients internationally.
Resumo:
Introduction: Dengue poses a problem for safe transfusion of blood components with confirmed reports of transfusion-transmission in Hong Kong and Singapore. The largest outbreak in 50 years occurred in North Queensland during 2008/2009 with more than 1,000 confirmed cases in Cairns and Townsville. During this outbreak, supplementary questioning for all donors was implemented, and fresh components were not manufactured from at risk donors. We aim to determine the seroprevalence of dengue exposure in this population during this epidemic. Methods: Samples were collected from blood donors during the 2008/2009 epidemic and 3 months after the last confirmed case. These samples were tested for anti-Dengue IgM, IgG and NS1 antigen with commercially available ELISA based assay kits from PanBio. Results: Initial analyses revealed 2.7% of samples from deferred donors were IgM repeat reactive. Of these, 16% were also positive for anti-dengue IgG, while none of these were positive for the NS1 viral antigen. However, two NS1 positives were found in samples collected from deferred donors. Conclusions: This initial analysis represents recent and cumulative past exposure in a presumed asymptomatic population, and will provide documentation of the rate of asymptomatic dengue infection during the epidemic. This data can also be used to assess the risk of dengue becoming endemic in North Queensland given that the mosquito vector is established in this region.
Resumo:
In this paper, we develop and test a model of the relationships between mega-project leaders’ personal attributes and their ratings of project success in the context of the Australian defense industry. In our model, emotional intelligence, cognitive flexibility, and systemic thinking were hypothesized to be related to project success ratings, mediated by internal and external stakeholder relationships. We tested the model in an online survey study of 373 mega-project leaders. Results were that emotional intelligence and cognitive flexibility were found to be related to the quality of mega-project leader’s relationships with both internal and external stakeholders; and that these relationships in turn were found to be associated with the project leaders’ ratings of project success. We found however that systemic thinking had no relationship with either stakeholder relationships or ratings of project success. We conclude with a discussion of the implications of these findings and make recommendations for future research. In particular, additional research is needed to examine the contribution of a wider range of competencies on stakeholder relationships and project success in mega-projects, and that there is also a need for research in future to attempt to use more objective ratings of project success.
Resumo:
Defence projects are typically undertaken within a multi-project-management environment where a common agenda of project managers is to achieve higher project efficiency. This study adopted a multi-facet qualitative approach to investigate factors contributing to or impeding project efficiency in the Defence sector. Semi-structured interviews were undertaken to identify additional factors to those compiled from the literature survey. This was followed by a three-round Delphi study to examine the perceived critical factors of project efficiency. The results showed that project efficiency in the Defence sector went beyond its traditional internally focused scope to one that is externally focused. As a result, efforts are needed on not only those factors related to individual projects but also those factors related to project inter-dependencies and external customers. The management of these factors will help to enhance the efficiency of a project within the Defence sector.
Resumo:
Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.
Resumo:
Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.
Resumo:
Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.
Resumo:
The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.
Resumo:
Defining success in mega projects has been a challenging exercise for Australian Defence. The inherent conflict between nation capability building and cost efficiency raises questions about how to appropriately define mega project success. Contrary to the traditional output-focused project methodology, the value creation perspective argues for the importance of creating new knowledge, processes, and systems for suppliers and customers. Stakeholder involvement is important in this new perspective, as the balancing of competing needs of stakeholders in mega projects becomes a major challenge in managing the value co-creation process. In our earlier study reported interview data from three Australian defence mega projects and reported that those senior executives have a more complex understanding of project success than traditional iron triangle measures. In these mega defence projects, customers and other stakeholders actively engage in the value creation process, and over time both content and process value are created to increase defence and national capability. Value created and captured during and post projects are the key to true success. We aim to develop a comprehensive theoretical model the capture the value co-creation process as a way of re-conceptualising success in mega projects. We propose a new framework redefine project value as multi-dimensional, contextual and temporal construct that emerges from the interactions among multiple stake holders over the complete project life cycle. The framework distinguishes between exploitation and exploration types of projects, and takes into consideration the requisite governance structures.
Resumo:
In this paper, we develop two stakeholder relationships scales. These scales assess project managers’ perceived competence in establishing and maintaining high quality, effective relationships with people internal to the project as well as those stakeholders who are external to the project. We developed the scales using an online survey study of three hundred and seventy three complex project managers from a sub-set of the Australian Defence Industry. Both the internal stakeholder relationships’ scale and the external stakeholder relationships’ scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships’ literature and the stakeholder management literature. We recommend future research tests these scales with multiple samples, across different project types and project industries. The stakeholder relationships’ scales should be versatile enough to be applied to project management generally but are best suited to large-scale complex project environments.
Resumo:
Custom designed for display on the Cube Installation situated in the new Science and Engineering Centre (SEC) at QUT, the ECOS project is a playful interface that uses real-time weather data to simulate how a five-star energy building operates in climates all over the world. In collaboration with the SEC building managers, the ECOS Project incorporates energy consumption and generation data of the building into an interactive simulation, which is both engaging to users and highly informative, and which invites play and reflection on the roles of green buildings. ECOS focuses on the principle that humans can have both a positive and negative impact on ecosystems with both local and global consequence. The ECOS project draws on the practice of Eco-Visualisation, a term used to encapsulate the important merging of environmental data visualization with the philosophy of sustainability. Holmes (2007) uses the term Eco-Visualisation (EV) to refer to data visualisations that ‘display the real time consumption statistics of key environmental resources for the goal of promoting ecological literacy’. EVs are commonly artifacts of interaction design, information design, interface design and industrial design, but are informed by various intellectual disciplines that have shared interests in sustainability. As a result of surveying a number of projects, Pierce, Odom and Blevis (2008) outline strategies for designing and evaluating effective EVs, including ‘connecting behavior to material impacts of consumption, encouraging playful engagement and exploration with energy, raising public awareness and facilitating discussion, and stimulating critical reflection.’ Consequently, Froehlich (2010) and his colleagues also use the term ‘Eco-feedback technology’ to describe the same field. ‘Green IT’ is another variation which Tomlinson (2010) describes as a ‘field at the juncture of two trends… the growing concern over environmental issues’ and ‘the use of digital tools and techniques for manipulating information.’ The ECOS Project team is guided by these principles, but more importantly, propose an example for how these principles may be achieved. The ECOS Project presents a simplified interface to the very complex domain of thermodynamic and climate modeling. From a mathematical perspective, the simulation can be divided into two models, which interact and compete for balance – the comfort of ECOS’ virtual denizens and the ecological and environmental health of the virtual world. The comfort model is based on the study of psychometrics, and specifically those relating to human comfort. This provides baseline micro-climatic values for what constitutes a comfortable working environment within the QUT SEC buildings. The difference between the ambient outside temperature (as determined by polling the Google Weather API for live weather data) and the internal thermostat of the building (as set by the user) allows us to estimate the energy required to either heat or cool the building. Once the energy requirements can be ascertained, this is then balanced with the ability of the building to produce enough power from green energy sources (solar, wind and gas) to cover its energy requirements. Calculating the relative amount of energy produced by wind and solar can be done by, in the case of solar for example, considering the size of panel and the amount of solar radiation it is receiving at any given time, which in turn can be estimated based on the temperature and conditions returned by the live weather API. Some of these variables can be altered by the user, allowing them to attempt to optimize the health of the building. The variables that can be changed are the budget allocated to green energy sources such as the Solar Panels, Wind Generator and the Air conditioning to control the internal building temperature. These variables influence the energy input and output variables, modeled on the real energy usage statistics drawn from the SEC data provided by the building managers.
Resumo:
An experiment in large scale, live, game design and public performance, bringing together participants from across the creative arts to design, deliver and document a project that was both a cooperative learning experience and an experimental public performance. The four month project, funded by the Edge Digital Centre, culminated into a 24 hour ARG event involving over 100 participants in December 2012. Using the premise of a viral outbreak, young enthusiasts auditioned for the roles of Survivor, Zombie, Medic and Military. The main objective was for the Survivors to complete a series of challenges over 24 hours, while the other characters fulfilled their opposing objectives of interference and sabotage supported by both scripted and free-form scenarios staged in constructed scenes throughout the venues. The event was set in the State Library of Queensland and the Edge Digital Centre who granted the project full access, night and day to all areas including public, office and underground areas. These venues were transformed into cinematic settings full of interactive props and various audio-visual effects. The ZomPoc Project was an innovative experiment in writing and directing a large scale, live, public performance, bringing together participants from across the creative industries. In order to design such an event a number of innovative resources were developed exploiting techniques of game design, theatre, film, television and tangible media production. A series of workshops invited local artists, scientists, technicians and engineers to find new ways of collaborating to create networked artifacts, experimental digital works, robotic props, modular set designs, sound effects and unique costuming guided by an innovative multi-platform script developed by Deb Polson. The result of this collaboration was the creation of innovative game and set props, both atmospheric and interactive. Such works animated the space, presented story clues and facilitated interactions between strangers who found themselves sharing a unique experience in unexpected places.
Resumo:
The European Early Lung Cancer (EUELC) project aims to determine if specific genetic alterations occurring in lung carcinogenesis are detectable in the respiratory epithelium. In order to pursue this objective, nonsmall cell lung cancer (NSCLC) patients with a very high risk of developing progressive lung cancer were recruited from 12 centres in eight European countries: France, Germany, southern Ireland, Italy, the Netherlands, Poland, Spain and the UK. In addition, NSCLC patients were followed up every 6 months for 36 months. A European Bronchial Tissue Bank was set up at the University of Liverpool (Liverpool, UK) to optimise the use of biological specimens. The molecular - pathological investigations were subdivided into specific work packages that were delivered by EUELC Partners. The work packages encompassed mutational analysis, genetic instability, methylation profiling, expression profiling utilising immunohistochemistry and chip-based technologies, as well as in-depth analysis of FHIT and RARβ genes, the telomerase catalytic subunit hTERT and genotyping of susceptibility genes in specific pathways. The EUELC project engendered a tremendous collaborative effort, and it enabled the EUELC Partners to establish protocols for assessing molecular biomarkers in early lung cancer with the view to using such biomarkers for early diagnosis and as intermediate end-points in future chemopreventive programmes. Copyright©ERS Journals Ltd 2009.
Rating defence major project success : the role of personal attributes and stakeholder relationships
Resumo:
In this paper we develop and test a model of the associations between major project managers' personal attributes and project success in the context of the Australian Defence industry. In our model, emotional intelligence, cognitive flexibility and systemic thinking were hypothesised to relate to project success, mediated by internal and external stakeholder relationships. The model was tested in an online survey with 373 major project managers. Emotional intelligence and cognitive flexibility were found to be related to the development, quality and effectiveness of major project managers' relationships with both internal and external stakeholders; and these in turn were associated with their ratings of project success. Systemic thinking, however, had no relationship with either stakeholder relationships or project success. Additional research is needed to examine the contribution of a wider range of personal attributes to stakeholder relationships and project success, and to assess whether this model is applicable in other industries and types of projects.
Resumo:
Funded and endorsed by the Australasian Juvenile Justice Administrators, this is one of the first national scale research reports into the bail and remand practices for young Australians. A young person can be placed in custody on remand (ie refused bail) after being arrested by police in relation to a suspected criminal offence, before entering a plea, while awaiting trial, during trial or awaiting sentence. Although custodial remand plays an important role in Western criminal justice systems, minimising the unnecessary use of remand is important given the obligations Australia has under several UN instruments to use, as a last resort, youth detention of any kind. This research identifies trends in the use of custodial remand and explores the factors that influence its use for young people nationally and in each of Australia’s jurisdictions.