630 resultados para Hydraulic building works
Resumo:
In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.
Resumo:
Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.
Resumo:
This paper investigates the mutual relations of three current drivers of construction: lean construction, building information modelling and sustainability. These drivers are based on infrequently occurring changes, only incidentally simultaneous, in their respective domains. It is contended that the drivers are mutually supportive and thus synergistic. They are aligned in the sense that all require, promote or enable collaboration. It is argued that these three drivers should be implemented in a unified manner for rapid and robust improvements in construction industry performance and the quality of the constructed facilities and their benefits for stakeholders and wider society.
Resumo:
Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide a conceptual analysis of the interaction of lean construction and BIM for improving construction. This was investigated by compiling a detailed listing of lean construction principles and BIM functionalities which are relevant from this perspective. These were drawn from a detailed literature survey. A research framework for analysis of the interaction between lean and BIM was then compiled. The goal of the framework is to both guide and stimulate research; as such, the approach adopted up to this point is constructive. Ongoing research has identified 55 such interactions, the majority of which show positive synergy between the two.
Resumo:
Brisbane City Hall (BCH) is arguably one of Brisbane’s most notable and iconic buildings. Serving as the public’s central civic and municipal building since 1930, the importance of this heritage listed building to cultural significance and identity is unquestionable. This attribute is reflected within the local government, with a simplified image of the halls main portico entrance supplying Brisbane City Council with its insignia and trademark signifier. Regardless of these qualities, this building has been neglected in a number of ways, primarily in the physical sense with built materials, but also, and just as importantly, through inaccurate and undocumented works. Numerous restoration and renovation works have been undertaken throughout BCH’s lifetime, however the records of these amendments are far and few between. Between 2010 and 2013, BCH underwent major restoration works, the largest production project undertaken on the building since its initial construction. Just prior to this conservation process, the full extent of the buildings deterioration was identified, much of which there was little to no original documentation of. This has led to a number of issues pertaining to what investigators expected to find within the building, versus what was uncovered (the unexpected), which have resulted directly from this lack of data. This absence of record keeping is the key factor that has contributed to the decay and unknown deficiencies that had amassed within BCH. Accordingly, this raises a debate about the methods of record keeping, and the need for a more advanced process that is able to be integrated within architectural and engineering programs, whilst still maintaining the ability to act as a standalone database. The immediate objective of this research is to investigate the restoration process of BCH, with focus on the auditorium, to evaluate possible strategies to record and manage data connected to building pathology so that a framework can be developed for a digital heritage management system. The framework produced for this digital tool will enable dynamic uses of a centralised database and aims to reduce the significant data loss. Following an in-depth analysis of this framework, it can be concluded that the implementation of the suggested digital tool would directly benefit BCH, and could ultimately be incorporated into a number of heritage related built form.
Resumo:
This series of research vignettes is aimed at sharing current and interesting research findings from our team of international Entrepreneurship researchers. In this vignette, Alireza Javanmardi Kashan and Kavoos Mohannak considers ‘How do firms develop competitive capabilities within product innovation projects?’
Resumo:
The Construction industry accounts for a tenth of global GDP. Still, challenges such as slow adoption of new work processes, islands of information, and legal disputes, remain frequent, industry-wide occurrences despite various attempts to address them. In response, IT-based approaches have been adopted to explore collaborative ways of executing construction projects. Building Information Modelling (BIM) is an exemplar of integrative technologies whose 3D-visualisation capabilities have fostered collaboration especially between clients and design teams. Yet, the ways in which specification documents are created and used in capturing clients' expectations based on industry standards have remained largely unchanged since the 18th century. As a result, specification-related errors are still common place in an industry where vast amounts of information are consumed as well as produced in the course project implementation in the built environment. By implication, processes such as cost planning which depend on specification-related information remain largely inaccurate even with the use of BIM-based technologies. This paper briefly distinguishes between non-BIM-based and BIM-based specifications and reports on-going efforts geared towards the latter. We review exemplars aimed at extending Building Information Models to specification information embedded within the objects in a product library and explore a viable way of reasoning about a semi-automated process of specification using our product library.
Resumo:
At the 2012 CDIO conference, it was clear to all that engineering for 21st Century challenges and opportunities will be critical to the success of society over the next 2-3 decades, in dealing with pressures including climate change, resource depletion and urban densification. Within this context there is a growing imperative for rapid curriculum renewal towards education for sustainable development across all types and disciplines of engineering education, around the world. Building on a paper presented by these authors at the 2012 CDIO conference, this 2013 roundtable will draw on participants’ experiences to discuss how sustainability knowledge and skills can be embedded within a CDIO-based program using a holistic approach to curriculum renewal. The highly interactive and dynamic session will include two parts: 1) a short presentation from the chairs of the roundtable on an emergent model for rapid curriculum renewal; and 2) a facilitated discussion with participants about challenges and opportunities for action. Session notes will be recorded for distribution among participants following the conference.
Resumo:
QUT Software Finder is a searchable repository of metadata describing software and source code, which has been created as a result of QUT research activities. It was launched in December 2013. https://researchdatafinder.qut.edu.au/scf The registry was designed to aid the discovery and visibility of QUT research outputs and encourage sharing and re-use of code and software throughout the research community, both nationally and internationally. The repository platform used is VIVO (an open source product initially developed at Cornell University). QUT Software Finder records that describe software or code are connected to information about researchers involved, the research groups, related publications and related projects. Links to where the software or code can be accessed from are also provided alongside licencing and re-use information.
Resumo:
10,000 Steps Rockhampton is a multi-strategy health promotion program which aims to develop sustainable community-based strategies to increase physical activity.The central coordinating focus of the project is the use of pedometers to raise awareness of and provide motivation for physical activity, around the theme of '10,000 steps/day - Every step counts.' To date, five key strategies have been implemented: (1) a media-based awareness raising campaign; (2) promotion of physical activity by health professionals; (3) improving social support for physical activity through group-based programs; (4) working with local council to improve environmental support for physical activity, and; (5) establishment of a ‘micro-grants’ fund to which community groups could apply for assistance with small, innovative physical activity enhancing projects. Strategies were introduced on a rolling basis beginning in February 2002 with 'layering' of interventions designed to address the multi-level individual social and environmental determinants of physical activity. The project was quasi-experimental in design, involving collection of baseline and two year follow-up data from community based surveys in Rockhampton and in a matched regional Queensland town. In August 2001,the baseline CATI survey (N=1281)found that 47.9% of men and 33.0% of women were meeting the national guidelines for physical activity. In August 2002, a smaller survey (N=400) found an increase in activity levels among women (39.7% active) but not in men (48.5%). Data from the two year follow up survey, to be conducted in August 2003, will be presented, with discussion of the major successes and challenges of this landmark physical activity intervention. Acknowledgement: This project is supported by a grant from Health Promotion Queensland.
Resumo:
The 10,000 Steps Rockhampton project is a multi-strategy community-wide, physical activity intervention based on the simultaneous implementation of five strategies, each identified as 'best practice' for the promotion of physical activity. Several community partners were engaged to develop and implement the strategies during the first eighteen months of the project. These included: the local media (TV, newspaper and radio); the local Division of General Practice and other health professional groups; the Heart Foundation and ‘Just Walk It’; the local council; and several large worksites. A local physical activity task force was also formed to administer a 'micro-grants' scheme, and to guide the development of community based strategies. The presentation will focus on the critical elements involved in developing and maintaining relationships with community partners. These include identification and ‘courting’ of potential partners, strategies for keeping them engaged, and the challenges of maintaining the balance between ‘top-down’ (evidence-based) and ‘bottom-up’ (community-driven) strategies. Data on implementation and uptake of the key strategies will also be presented. These include: 1) process data on the number of health
Resumo:
This thesis investigates the use of building information models for access control and security applications in critical infrastructures and complex building environments. It examines current problems in security management for physical and logical access control and proposes novel solutions that exploit the detailed information available in building information models. The project was carried out as part of the Airports of the Future Project and the research was modelled based on real-world problems identified in collaboration with our industry partners in the project.
Resumo:
A newspaper numbers game based on simple arithmetic relationships is discussed. Its potential to give students of elementary algebra practice in semi-ad hoc reasoning and to build general arithmetic reasoning skills is explored.
Resumo:
In large sedimentary basins with layers of different rocks, the groundwater flow between aquifers depends on the hydraulic conductivity (K) of the separating low-permeable rocks, or aquitards. Three methods were developed to evaluate K in aquitards for areas with limited field data: • Coherence and harmonic analysis: estimates the regional-scale K based on water-level fluctuations in adjacent aquifers. • Cokriging and Bayes' rule: infers K from downhole geophysical logs. • Fluvial process model: reproduces the lithology architecture of sediment formations which can be converted to K. These proposed methods enable good estimates of K and better planning of further drillholes.
Resumo:
During the early design stages of construction projects, accurate and timely cost feedback is critical to design decision making. This is particularly challenging for cost estimators, as they must quickly and accurately estimate the cost of the building when the design is still incomplete and evolving. State-of-the-art software tools typically use a rule-based approach to generate detailed quantities from the design details present in a building model and relate them to the cost items in a cost estimating database. In this paper, we propose a generic approach for creating and maintaining a cost estimate using flexible mappings between a building model and a cost estimate. The approach uses queries on the building design that are used to populate views, and each view is then associated with one or more cost items. The benefit of this approach is that the flexibility of modern query languages allows the estimator to encode a broad variety of relationships between the design and estimate. It also avoids the use of a common standard to which both designers and estimators must conform, allowing the estimator added flexibility and functionality to their work.