452 resultados para infrastructure protection


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines the question of whether the imposition of developer infrastructure charges on housing developers affects the price of residential land. Developer paid fees or charges are a commonly used mechanism for local governments to fund new infrastructure as a “user pays” method of funding new urban infrastructure. Some argue these costs are passed back to the original land owner by way of lower land prices. However, property developers claim these charges are added on to new land prices, with flow on negative impact to housing affordability. This paper presents the findings of a hedonic land price model that provides the first empirical evidence that infrastructure charges do increase residential land prices in Brisbane, Australia. This research is consistent with international findings and supports the proposition that developer paid infrastructure charges are over-passed to home buyers and are a significant contributor to reduced housing affordability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2015 the QLRC is conducting an inquiry into whether to extend legislative mandatory reporting duties for physical abuse and sexual abuse to early childhood education and care practitioners. The current legislation does not require these practitioners to report suspected cases of significant harm from physical or sexual absue to child welfare agencies. Based on the literature, and a multidisciplinary analysis, our overall recommendation is that we endorse the extension to selected early childhood education and care practitioners of Queensland’s current mandatory reporting duty in the Child Protection Act 1999 s 13E.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia's child protection systems and the provision of out-of-home care, in particular, have been subject to sustained criticism for decades from dozens of official inquiries and reviews. It is now well established that many children in state care are treated significantly less well than required by relevant legal frameworks and community standards. Much attention and significant resources have been directed toward trying to ameliorate this ‘wicked problem’ and yet it continues. This article focuses on one reason the problems persists, namely the secrecy and closed cultures that characterize relevant organizations which reinforce strategies of denial that avoid acknowledging or dealing with ‘uncomfortable knowledge’. It is a situation many people in child protection systems confront. It is, for example, when we know abuse is taking place, or when they see or are ourselves party to corrupt or negligent practices. It is knowing that important ethical principles are being abrogated. We draw on recent official reports and inquiries noting the repeated calls for greater transparency and independent oversight. An argument is made for a default position of total transparency subject to caveats that protect privacy and any investigation underway. An account of what this can look like is offered.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Typically only a limited number of consortiums are able to competitively bid for Public Private Partnership (PPP) projects. Consequently, this may lead to oligopoly pricing constraints and ineffective competition, thus engendering ex ante market failure. In addressing this issue, this paper aims to determine the optimal number of bidders required to ensure a healthy level of competition is available to procure major infrastructure projects. The theories of Structure-Conduct-Performance (SCP) paradigm; Game Theory and Auction Theory and Transaction Cost Economics are reviewed and discussed and used to produce an optimal level of competition for major infrastructure procurement, that prevents market failure ex ante (lack of competition) and market failure ex post (due to asymmetric lock-in).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the protocol for a review and there is no abstract. The objectives are as follows: To assess the effects of heat acclimation interventions aimed at protecting health and performance from exertional heat stress.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aurizon, Australia's largest rail freight operator, is introducing the Static Frequency Converter (SFC) technology into its electric railway network as part of the Bauhinia Electrification Project. The introduction of SFCs has significant implications on the protection systems of the 50kV traction network. The traditional distance protection calculation method does not work in this configuration because of the effect that the SFC in combination with the remote grid has on the apparent impedance, and was substantially reviewed. The standard overcurrent (OC) protection scheme is not suitable due to the minimum fault level being below the maximum load level and was revised to incorporate directionality and under-voltage inhibit. Delta protection was reviewed to improve sensitivity. A new protection function was introduced to prevent back-feeding faults in the transmission network through the grid connection. Protection inter-tripping was included to ensure selectivity between the SFC protection and the system downstream.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Distributed Network Protocol v3.0 (DNP3) is one of the most widely used protocols to control national infrastructure. The move from point-to-point serial connections to Ethernet-based network architectures, allowing for large and complex critical infrastructure networks. However, networks and con- figurations change, thus auditing tools are needed to aid in critical infrastructure network discovery. In this paper we present a series of intrusive techniques used for reconnaissance on DNP3 critical infrastructure. Our algorithms will discover DNP3 outstation slaves along with their DNP3 addresses, their corresponding master, and class object configurations. To validate our presented DNP3 reconnaissance algorithms and demonstrate it’s practicality, we present an implementation of a software tool using a DNP3 plug-in for Scapy. Our implementation validates the utility of our DNP3 reconnaissance technique. Our presented techniques will be useful for penetration testing, vulnerability assessments and DNP3 network discovery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Child maltreatment has severe short-and long-term consequences for children’s health, development, and wellbeing. Despite the provision of child protection education programs in many countries, few have been rigorously evaluated to determine their effectiveness. We describe the design of a multi-site gold standard evaluation of an Australian school-based child protection education program. The intervention has been developed by a not-for-profit agency and comprises 5 1-h sessions delivered to first grade students (aged 5–6 years) in their regular classrooms. It incorporates common attributes of effective programs identified in the literature, and aligns with the Australian education curriculum. Methods/Design A three-site cluster randomised controlled trial (RCT) of Learn to be safe with Emmy and friends™ will be conducted with children in approximately 72 first grade classrooms in 24 Queensland primary (elementary) schools from three state regions, over a period of 2 years. Entire schools will be randomised, using a computer generated list of random numbers, to intervention and wait-list control conditions, to prevent contamination effects across students and classes. Data will be collected at baseline (pre-assessment), immediately after the intervention (post-assessment), and at 6-, 12-, and 18-months (follow-up assessments). Outcome assessors will be blinded to group membership. Primary outcomes assessed are children’s knowledge of program concepts; intentions to use program knowledge, skills, and help-seeking strategies; actual use of program material in a simulated situation; and anxiety arising from program participation. Secondary outcomes include a parent discussion monitor, parent observations of their children’s use of program materials, satisfaction with the program, and parental stress. A process evaluation will be conducted concurrently to assess program performance. Discussion This RCT addresses shortcomings in previous studies and methodologically extends research in this area by randomising at school-level to prevent cross-learning between conditions; providing longer-term outcome assessment than any previous study; examining the degree to which parents/guardians discuss intervention content with children at home; assessing potential moderating/mediating effects of family and child demographic variables; testing an in-vivo measure to assess children’s ability to discriminate safe/unsafe situations and disclose to trusted adults; and testing enhancements to existing measures to establish greater internal consistency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A comprehensive study was conducted on potential systems of integrated building utilities and transport power solutions that can simultaneously contain rising electricity, hot water and personal transport costs for apartment residents. The research developed the Commuter Energy and Building Utilities System (CEBUS) and quantified the economic, social and environmental benefits of incorporating such a system in future apartment developments. A decision support tool was produced to assist the exploration of the CEBUS design variants. A set of implementation guidelines for CEBUS was also developed for the property development industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

What is the future for public health in the twenty-first century? Can we glean an idea about the future of public health from its past? As Winston Churchill once said: ‘[T]he further backward you look, the further forward you can see.’ What can we see in the history of public health that gives us an idea of where public health might be headed in the future? (Gruszin et al. 2012). In the twentieth century there was substantial progress in public health in Australia. These improvements were brought about through a number of factors. In part, improvements were due to increasing knowledge about the natural history of disease and its treatment. Added to this knowledge was a shifting focus from legislative measures to protect health, to the emergence of improved promotion and prevention strategies, and a general improvement in social and economic conditions for people living in countries such as Australia. Gruszin et al. (2012) consider the range of social and economic reforms of the twentieth century as the most important determinants of the public’s health at the start of the twenty-first century (Gruszin et al. 2012 p 201). The same could not, however, be said for second or third world countries, many of whom have the most fundamental of sanitary and health protection issues still to deal with. For example, in sub-Saharan Africa and in Russia the decline in life expectancy can be said to be related to a range of interconnected factors. In Russia, issues such as alcoholism, violence, suicide, accidents and cardiovascular disease could be contributing to the falling life expectancy (McMichael & Butler 2007). In sub-Saharan Africa, a range of factors, such as HIV/AIDS, poverty, malaria, tuberculosis, undernutrition, totally inadequate infrastructure, gender inequality, conflict and violence, political taboos and a complete lack of political will, have all contributed to a dramatic drop in life expectancy (McMichael & Butler 2007).