455 resultados para Managing projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report provides an evaluation of the implementation of the Polluter Pays Principle (PPP) – a principle of international environmental law – in the context of pollution from sugarcane farming affecting Australia’s Great Barrier Reef (GBR). The research was part of an experiment to test methods for evaluating the effectiveness of environmental laws. Overall, we found that whilst the PPP is reflected to a limited extent in Australian law (more so in Queensland law, than at the national level), the behaviour one might expect in terms of implementing the principle was largely inadequate. Evidence of a longer term, explicit commitment to the PPP was particularly weak.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deriving an estimate of optimal fishing effort or even an approximate estimate is very valuable for managing fisheries with multiple target species. The most challenging task associated with this is allocating effort to individual species when only the total effort is recorded. Spatial information on the distribution of each species within a fishery can be used to justify the allocations, but often such information is not available. To determine the long-term overall effort required to achieve maximum sustainable yield (MSY) and maximum economic yield (MEY), we consider three methods for allocating effort: (i) optimal allocation, which optimally allocates effort among target species; (ii) fixed proportions, which chooses proportions based on past catch data; and (iii) economic allocation, which splits effort based on the expected catch value of each species. Determining the overall fishing effort required to achieve these management objectives is a maximizing problem subject to constraints due to economic and social considerations. We illustrated the approaches using a case study of the Moreton Bay Prawn Trawl Fishery in Queensland (Australia). The results were consistent across the three methods. Importantly, our analysis demonstrated the optimal total effort was very sensitive to daily fishing costs-the effort ranged from 9500-11 500 to 6000-7000, 4000 and 2500 boat-days, using daily cost estimates of $0, $500, $750, and $950, respectively. The zero daily cost corresponds to the MSY, while a daily cost of $750 most closely represents the actual present fishing cost. Given the recent debate on which costs should be factored into the analyses for deriving MEY, our findings highlight the importance of including an appropriate cost function for practical management advice. The approaches developed here could be applied to other multispecies fisheries where only aggregated fishing effort data are recorded, as the literature on this type of modelling is sparse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report summarises the findings of a case study on Queensland’s New Generation Rollingstock (NGR) Project carried out as part of SBEnrc Project 2.34 Driving Whole-of-life Efficiencies through BIM and Procurement. This case study is one of three exemplar projects studied in order to leverage academic research in defining indicators for measuring tangible and intangible benefits of Building Information Modelling (BIM) across a project’s life-cycle in infrastructure and buildings. The NGR is an AUD 4.4 billion project carried out under an Availability Payment Public-Private Partnership (PPP) between the Queensland Government and the Bomabardier-led QTECTIC consortium comprising Bombardier Transportation, John Laing, ITOCHU Corporation and Aberdeen Infrastructure Investments. BIM has been deployed on the project from conceptual stages to drive both design and the currently ongoing construction at the Wulkuraka Project Site. This case study sourced information from a series of semi-structured interviews covering a cross-section of key stakeholders on the project. The present research identified 25 benefits gained from implementing BIM processes and tools. Some of the most prominent benefits were those leading to improved outcomes and higher customer satisfaction such as improved communications, data and information management, and coordination. There were also a number of expected benefits for future phases such as: • Improved decision making through the use of BIM for managing assets • Improved models through BIM maturity • Better utilisation of BIM for procurement on similar future projects • New capacity to specify the content of BIM models within contracts There were also three benefits that were expected to have been achieved but were not realised on the NGR project. These were higher construction information quality levels, better alignment in design teams as well as project teams, and capability improvements in measuring the impact of BIM on construction safety. This report includes individual profiles describing each benefit as well as the tools and processes that enabled them. Four key BIM metrics were found to be currently in use and six more were identified as potential metrics for the future. This case study also provides insights into challenges associated with implementing BIM on a project of the size and complexity of the NGR. Procurement aspects and lessons learned for managers are also highlighted, including a list of recommendations for developing a framework to assess the benefits of BIM across the project life-cycle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The power of projects has been demonstrated by the growth in their use across an increasing range of industries and workplaces in recent years. Not only has the number of people involved in project management increased, but the qualifications and backgrounds of those people have also broadened, with engineering no longer being the only path to project management (PM). Predicting the career trajectories in Project Management has become more important for both organisations employing project managers and project managers building career portfolios. Our research involved interviewing more than 75 project officers and project managers across a range of industries to explore their career journey. We used Wittgenstein’s family resemblance theory is to analyse the information from the transcripts to identify the extent to which the roles of participants fit with the commonly accepted definition of project management. Findings demonstrate diversity of project manager backgrounds and experiences and relational competencies across these backgrounds that form and shape PM careers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPP) are widely used for construction project procurement. However, the briefing stage of PPP projects has been largely overlooked, although it has a far-reaching influence throughout the project life cycle. In response, we rectify this by exploring the critical factors involved. A set of 15 procurement-related factors are first identified from the existing literature. Then the effects of four background variables on the factors are tested with Hong Kong government data by an exploratory factor analysis extracting four major dimensions. The relationships between these dimensions and background variables indicate the need to take the background variables into account when ranking the factors. The ranking of the factors is then obtained by considering their weighted importance. Finally, the final practical value of the results is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Small, not-for-profit organisations fulfil a need in the economy that is typically not satisfied by for-profit firms. They also operate in ways that are distinct from larger organisations. While such firms employ a substantial proportion of the workforce, research addressing human resource management (HRM) practices in these settings is limited. This article used data collected from five small not-for-profit firms in Australia to examine the way one significant HRM practice – the provision and utilisation of flexible work arrangements – operates in the sector. Drawing on research from several scholarly fields, the article firstly develops a framework comprising three tensions in not-for-profits that have implications for HRM. These tensions are: (1) contradictions between an informal approach to HRM vs. a formal regulatory system; (2) employee values that favour social justice vs. external market forces; and (3) a commitment to service vs. external financial expectations. The article then empirically examines how these tensions are managed in relation to the specific case of flexible work arrangements. The study reveals that tensions around providing and accessing flexible work arrangements are managed in three ways: discretion, leadership style and distancing. These findings more broadly inform the way HRM is operationalised in this under-examined sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper I conduct a Foucauldian discourse analysis of a political speech given by Brendon Nelson in 2006 when the Australian Minister for Defence in the Howard Coalition Government. The speech connects conceptualisations of terror, globalization, education and literacy as part of a whole of government security strategy. The analysis examines this speech as an example of a liberal way of governing the conduct of diverse and unpredictable populations. My analysis suggests that the apparatus of government has been strategically used in order to biopolitically contain the rise of complex social forces and protect a set of homogenous cultural values. The purposes of education and uses of literacy are seen as instruments for the inscription of a coded set of values understood to be synonymous with civil society.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines how teams and teamwork research have been conceptualised in the fields of sport psychology and organizational psychology. Specifically, it provides a close inspection of the general theoretical assumptions that inhere in the two disciplines. The results of a discursive analysis of research literature suggest that the fields have significantly different ways of conceptualising teams and teamwork and that conceptual borrowing may prove fruitful. A key argument is however, that in order for meaningful cross-fertilisation to take place a sound understanding of these differences is necessary. Working from this premise, the essential differences between sport and organizational approaches to teams are outlined. The paper is concluded with a discussion of contributions that organizational psychology can make to understandings of sport-oriented teams.