290 resultados para Conversion key success factors
Resumo:
Enterprise Architecture Management (EAM) is discussed in academia and industry as a vehicle to guide IT implementations, alignment, compliance assessment, or technology management. Still, a lack of knowledge prevails about how EAM can be successfully used, and how positive impact can be realized from EAM. To determine these factors, we identify EAM success factors and measures through literature reviews and exploratory interviews and propose a theoretical model that explains key factors and measures of EAM success. We test our model with data collected from a cross-sectional survey of 133 EAM practitioners. The results confirm the existence of an impact of four distinct EAM success factors, ‘EAM product quality’, ‘EAM infrastructure quality’, ‘EAM service delivery quality’, and ‘EAM organizational anchoring’, and two important EAM success measures, ‘intentions to use EAM’ and ‘Organizational and Project Benefits’ in a confirmatory analysis of the model. We found the construct ‘EAM organizational anchoring’ to be a core focal concept that mediated the effect of success factors such as ‘EAM infrastructure quality’ and ‘EAM service quality’ on the success measures. We also found that ‘EAM satisfaction’ was irrelevant to determining or measuring success. We discuss implications for theory and EAM practice.
Resumo:
A range of influences, both technical and organizational, has encouraged the widespread adoption of Enterprise Systems (ES). The integrated and process-oriented nature of Enterprise Systems has led organizations to use process modelling as a means of managing the complexity of these systems, and to aid in achieving business goals. Past research illustrates how process modelling is applied across different Enterprise Systems lifecycle phases. However, no empirical evidence exists to evaluate what factors are essential for a successful process modelling initiative, in general or in an ES context. This research-in-progress paper reports on an empirical investigation of the factors that influence process modelling success. It presents an a-priori process modelling critical-success-factors-model, describes its derivation, and concludes with an outlook to the next stages of the research.
Resumo:
Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.
Resumo:
This research sought to explore organisational factors that drive successful fundraising. Drawing on Strategic Management theory, this qualitative study examined the key intraorganisational factors that organisations develop to be effective at fundraising within the context of extraorganisational factors that can affect fundraising effectiveness. In this way, it helps build a fundraising effectiveness theory. The findings from this study afford leaders of nonprofits an opportunity to reflect on their reasons for pursuing fundraising as an income stream, their level of understanding of fundraising, the degree of investment they are willing to make and the critical leadership required by the CEO.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
The construction industry is a key national economic component. It tends to be at the forefront of cyclic changes in the Australian economy. It has a significant impact, both directly and indirectly, on the efficiency and productivity of other industries. Moreover it affects everyone to a greater or lesser extent; through its products whether they are manifested in the physical infrastructure that supports the operation of the economy or through the built environment that directly impacts on the quality of life experienced by individuals. In financial terms the industry makes one of the largest contributions to the Australian economy, accounting for 4.7 per cent of GDP 1 which was worth over $30B in 20012. The construction industry is comprised of a myriad of small firms, across several important sectors including, o Residential building, o Commercial building, o Building services, o Engineering, o Infrastructure o Facilities Management o Property Development Each sector is typified by firms that have distinctive characteristics such as the number of employees, size and value of contracts, number of jobs, and so forth. It tends to be the case that firms operating in commercial building are larger than those involved in residential construction. The largest contractors are found in engineering and infrastructure, as well as in the commercial building sub-sectors. However all sectors are characterised by their reliance upon sub-contractors to carry out on-site operations. Professionals from the various design consultant groups operate across all of these sectors. This description masks one of the most significant underlying causes of inefficiency in the construction industry, namely its fragmentation. The Construction Industry chapter of the 2004 Australian Year Book3, published by the Australian Bureau of Statistics unmasks the industry’s fragmented structure, typified by the large number of operating businesses within it, the vast majority of which are small companies employing less than 5 people. It identifies over 190,000 firms, of which over 90 percent employ less than 5 people. At the other end of the spectrum, firms employing 20 or more people account for fractionally more than one percent of businesses in the industry.
Resumo:
When complex projects go wrong they can go horribly wrong with severe financial consequences. We are undertaking research to develop leading performance indicators for complex projects, metrics to provide early warning of potential difficulties. The assessment of success of complex projects can be made by a range of stakeholders over different time scales, against different levels of project results: the project’s outputs at the end of the project; the project’s outcomes in the months following project completion; and the project’s impact in the years following completion. We aim to identify leading performance indicators, which may include both success criteria and success factors, and which can be measured by the project team during project delivery to forecast success as assessed by key stakeholders in the days, months and years following the project. The hope is the leading performance indicators will act as alarm bells to show if a project is diverting from plan so early corrective action can be taken. It may be that different combinations of the leading performance indicators will be appropriate depending on the nature of project complexity. In this paper we develop a new model of project success, whereby success is assessed by different stakeholders over different time frames against different levels of project results. We then relate this to measurements that can be taken during project delivery. A methodology is described to evaluate the early parts of this model. Its implications and limitations are described. This paper describes work in progress.
Resumo:
The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.
Resumo:
Principal Topic : Nascent entrepreneurship has drawn the attention of scholars in the last few years (Davidsson, 2006, Wagner, 2004). However, most studies have asked why firms are created focussing on questions such as what are the characteristics (Delmar and Davidsson, 2000) and motivations (Carter, Gartner, Shaver & Reynolds, 2004) of nascent entrepreneurs, or what are the success factors in venture creation (Davidsson & Honig; 2003; Delmar and Shane, 2004). In contrast, the question of how companies emerge is still in its infancy. On a theoretical side, effectuation, developed by Sarasvathy (2001) offers one view of the strategies that may be at work during the venture creation process. Causation, the theorized inverse to effectuation, may be described as a rational reasoning method to create a company. After a comprehensive market analysis to discover opportunities, the entrepreneur will select the alternative with the higher expected return and implement it through the use of a business plan. In contrast, effectuation suggests that the future entrepreneur will develop her new venture in a more iterative way by selecting possibilities through flexibility and interaction with the market, affordability of loss of resources and time invested, development of pre-commitments and alliances from stakeholders. Another contrasting point is that causation is ''goal driven'' while an effectual approach is ''mean driven'' (Sarasvathy, 2001) One of the predictions of effectuation theory is effectuation is more likely to be used by entrepreneurs early in the venture creation process (Sarasvathy, 2001). However, this temporal aspect and the impact of the effectuation strategy on the venture outcomes has so far not been systematically and empirically tested on large samples. The reason behind this research gap is twofold. Firstly, few studies collect longitudinal data on emerging ventures at an early enough stage of development to avoid severe survivor bias. Second, the studies that collect such data have not included validated measures of effectuation. The research we are conducting attempts to partially fill this gap by combining an empirical investigation on a large sample of nascent and young firms with the effectuation/causation continuum as a basis (Sarasvathy, 2001). The objectives are to understand the strategies used by the firms during the creation process and measure their impacts on the firm outcomes. Methodology/Key Propositions : This study draws its data from the first wave of the CAUSEE project where 28,383 Australian households were randomly contacted by phone using a specific methodology to capture emerging firms (Davidsson, Steffens, Gordon, Reynolds, 2008). This screening led to the identification of 594 nascent ventures (i.e., firms that are not operating yet) and 514 young firms (i.e., firms that have started operating from 2004) that were willing to participate in the study. Comprehensive phone interviews were conducted with these 1108 ventures. In a likewise comprehensive follow-up 12 months later, 80% of the eligible cases completed the interview. The questionnaire contains specific sections designed to distinguish effectual and causal processes, innovation, gestation activities, business idea changes and ventures outcomes. The effectuation questions are based on the components of effectuation strategy as described by Sarasvathy (2001) namely: flexibility, affordable loss and pre-commitment from stakeholders. Results from two rounds of pre-testing informed the design of the instrument included in the main survey. The first two waves of data have will be used to test and compare the use of effectuation in the venture creation process. To increase the robustness of the results, temporal use of effectuation will be tested both directly and indirectly. 1. By comparing the use of effectuation in nascent and young firms from wave 1 to 2, we will be able to find out how effectuation is affected by time over a 12-month duration and if the stage of venture development has an impact on its use. 2. By comparing nascent ventures early in the creation process versus nascent ventures late in the creation process. Early versus late can be determined with the help of time-stamped gestation activity questions included in the survey. This will help us to determine the change on a small time scale during the creation phase of the venture. 3. By comparing nascent firms to young (already operational) firms. 4. By comparing young firms becoming operational in 2006 with those first becoming operational in 2004. Results and Implications : Wave 1 and 2 data have been completed and wave 2 is currently being checked and 'cleaned'. Analysis work will commence in September, 2009. This paper is expected to contribute to the body of knowledge on effectuation by measuring quantitatively its use and impact on nascent and young firms activities at different stages of their development. In addition, this study will also increase the understanding of the venture creation process by comparing over time nascent and young firms from a large sample of randomly selected ventures. We acknowledge the results from this study will be preliminary and will have to be interpreted with caution as the changes identified may be due to several factors and may not only be attributed to the use/not use of effectuation. Meanwhile, we believe that this study is important to the field of entrepreneurship as it provides some much needed insights on the processes used by nascent and young firms during their creation and early operating stages.
Resumo:
Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)