208 resultados para Anaconda Reduction Works


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A comprehensive voltage imbalance sensitivity analysis and stochastic evaluation based on the rating and location of single-phase grid-connected rooftop photovoltaic cells (PVs) in a residential low voltage distribution network are presented. The voltage imbalance at different locations along a feeder is investigated. In addition, the sensitivity analysis is performed for voltage imbalance in one feeder when PVs are installed in other feeders of the network. A stochastic evaluation based on Monte Carlo method is carried out to investigate the risk index of the non-standard voltage imbalance in the network in the presence of PVs. The network voltage imbalance characteristic based on different criteria of PV rating and location and network conditions is generalized. Improvement methods are proposed for voltage imbalance reduction and their efficacy is verified by comparing their risk index using Monte Carlo simulations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Obesity and type 2 diabetes mellitus (T2D) have reached epidemic proportions in many parts of the world with numbers projected to rise dramatically in coming decades (Wang and Lobstein, 2006; Zaninotto et al., 2006). In Australia, and consistent with much of the developed world, the problem has been described as a ‘juggernaut’ that is out of control (Zimmet and James, 2007). Unfortunately the burgeoning problem of non-communicable diseases, including obesity and T2D, is also impacting developing nations as populations are undergoing a nutrition transition (Caballero, 2005). The increased prevalence of overweight and obesity in children, adolescents and adults in both the developed and developing world is consistent with reductions in all forms of physical activity (Brownson et al., 2005). This brief paper provides an overview of the importance of physical activity and an outline of physical activity intervention studies with particular reference to the growing years. As many interventions studies involving physical activity have been undertaken in the context of childhood obesity prevention (Lobstein et al., 2004), and an increasing proportion of the childhood population is overweight or obese, this is a major focus of discussion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To investigate the acute effects of isolated eccentric and concentric calf muscle exercise on Achilles tendon sagittal thickness. ---------- Design: Within-subject, counterbalanced, mixed design. ---------- Setting: Institutional. ---------- Participants: 11 healthy, recreationally active male adults. ---------- Interventions: Participants performed an exercise protocol, which involved isolated eccentric loading of the Achilles tendon of a single limb and isolated concentric loading of the contralateral, both with the addition of 20% bodyweight. ---------- Main outcome measurements: Sagittal sonograms were acquired prior to, immediately following and 3, 6, 12 and 24 h after exercise. Tendon thickness was measured 2 cm proximal to the superior aspect of the calcaneus. ---------- Results: Both loading conditions resulted in an immediate decrease in normalised Achilles tendon thickness. Eccentric loading induced a significantly greater decrease than concentric loading despite a similar impulse (−0.21 vs −0.05, p<0.05). Post-exercise, eccentrically loaded tendons recovered exponentially, with a recovery time constant of 2.5 h. The same exponential function did not adequately model changes in tendon thickness resulting from concentric loading. Even so, recovery pathways subsequent to the 3 h time point were comparable. Regardless of the exercise protocol, full tendon thickness recovery was not observed until 24 h. ---------- Conclusions: Eccentric loading invokes a greater reduction in Achilles tendon thickness immediately after exercise but appears to recover fully in a similar time frame to concentric loading.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: As part of a comprehensive research study looking at implementing PPPs, interviews with experienced researchers were conducted to realize their views on private sector involvement in public works projects. Design / methodology / approach: Amongst these interviews, five were launched with academics from Hong Kong and Australia, and two were conducted with Legislative Councillors of the Hong Kong Special Administration Region (HKSAR) government. Findings: The interview findings show that both Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. The interviewees highlighted that “Different risk profiles” and “Private sector more innovative / efficient” were the main differences between projects that were procured by PPP and traditionally. Other differences include risk transfer. In a PPP arrangement the public sector passes on a substantial amount of the project risks to the private sector, whereas in a traditional case the public sector would take the largest responsibility in bearing these risks. Another common feature of the private sector is that they tend to be more efficient and innovative when compared to the public sector hence their expertise is often reflected in PPP projects. The interviewees agreed that the key performance indicators for PPP projects were unique depending on the individual project. The critical success factors mentioned by both groups of interviewees included “Transparent process”, “Project dependent” and “Market need”. Due to the fact that PPP projects tend to be large scaled costly projects, adequate transparency in the process is necessary in order to demonstrate that a fair selection and tendering process is conducted. A market need for the project is also important to ensure that the project will be financially secure and that the private sector can make a reasonable profit to cover their project expenditure. Originality / value: The findings from this study have enabled a comparative analysis between the views of researchers in two completely different jurisdictions. With the growing popularity to implement PPP projects, it is believed that the results presented in this paper would be of interest to the industry at large.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose : The Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) is an international leading commercial hub particularly in Asia. In order to keep up its reputation a number of large public works projects have been considered. Public Private Partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The findings presented in this paper will specifically consider whether PPPs should be used to procure public works projects in Hong Kong by studying the attractive and negative factors for adopting PPP. Design/methodology/approach : As part of this study a questionnaire survey was conducted with industrial practitioners. The respondents were requested to rank the importance of fifteen attractive factors and thirteen negative factors for adopting PPP. Findings : The results found that in general the top attractive factors ranked by respondents from Hong Kong were efficiency related, these included (1) ‘Provide an integrated solution (for public infrastructure / services)’; (2) ‘Facilitate creative and innovative approaches’; and (3) ‘Solve the problem of public sector budget restraint’. It was found that Australian respondents also shared similar findings to those in Hong Kong, but the United Kingdom respondents showed a higher priority to those economic driven attractive factors. Also, the ranking of the attractive and negative factors for adopting PPP showed that on average the attractive factors were scored higher than the negative factors. Originality/value : The results of this research have enabled a comparison of the attractive and negative factors for adopting PPP between three administrative systems. These findings have confirmed that PPP is a suitable means to procure large public projects which are believed to be useful and interesting to PPP researchers and practitioners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis reports on the investigations, simulations and analyses of novel power electronics topologies and control strategies. The research is financed by an Australian Research Council (ARC) Linkage (07-09) grant. Therefore, in addition to developing original research and contributing to the available knowledge of power electronics, it also contributes to the design of a DC-DC converter for specific application to the auxiliary power supply in electric trains. Specifically, in this regard, it contributes to the design of a 7.5 kW DC-DC converter for the industrial partner (Schaffler and Associates Ltd) who supported this project. As the thesis is formatted as a ‘thesis by publication’, the contents are organized around published papers. The research has resulted in eleven papers, including seven peer reviewed and published conference papers, one published journal paper, two journal papers accepted for publication and one submitted journal paper (provisionally accepted subject to few changes). In this research, several novel DC-DC converter topologies are introduced, analysed, and tested. The similarity of all of the topologies devised lies in their ‘current circulating’ switching state, which allows them to store some energy in the inductor, as extra inductor current. The stored energy may be applied to enhance the performance of the converter in the occurrence of load current or input voltage disturbances. In addition, when there is an alternating load current, the ability to store energy allows the converter to perform satisfactorily despite frequently and highly varying load current. In this research, the capability of current storage has been utilised to design topologies for specific applications, and the enhancement of the performance of the considered applications has been illustrated. The simplest DC-DC converter topology, which has a ‘current circulating’ switching state, is the Positive Buck-Boost (PBB) converter (also known as the non-inverting Buck-Boost converter). Usually, the topology of the PBB converter is operating as a Buck or a Boost converter in applications with widely varying input voltage or output reference voltage. For example, in electric railways (the application of our industrial partner), the overhead line voltage alternates from 1000VDC to 500VDC and the required regulated voltage is 600VDC. In the course of this research, our industrial partner (Schaffler and Associates Ltd) industrialized a PBB converter–the ‘Mudo converter’–operating at 7.5 kW. Programming the onboard DSP and testing the PBB converter in experimental and nominal power and voltage was part of this research program. In the earlier stages of this research, the advantages and drawbacks of utilization of the ‘current circulating’ switching state in the positive Buck-Boost converter were investigated. In brief, the advantages were found to be robustness against input voltage and current load disturbances, and the drawback was extra conduction and switching loss. Although the robustness against disturbances is desirable for many applications, the price of energy loss must be minimized to attract attention to the utilization of the PBB converter. In further stages of this research, two novel control strategies for different applications were devised to minimise the extra energy loss while the advantages of the positive Buck-Boost converter were fully utilized. The first strategy is Smart Load Controller (SLC) for applications with pre-knowledge or predictability of input voltage and/or load current disturbances. A convenient example of these applications is electric/hybrid cars where a master controller commands all changes in loads and voltage sources. Therefore, the master controller has a pre-knowledge of the load and input voltage disturbances so it can apply the SLC strategy to utilize robustness of the PBB converter. Another strategy aiming to minimise energy loss and maximise the robustness in the face of disturbance is developed to cover applications with unexpected disturbances. This strategy is named Dynamic Hysteresis Band (DHB), and is used to manipulate the hysteresis band height after occurrence of disturbance to reduce dynamics of the output voltage. When no disturbance has occurred, the PBB converter works with minimum inductor current and minimum energy loss. New topologies based on the PBB converter have been introduced to address input voltage disturbances for different onboard applications. The research shows that the performance of applications of symmetrical/asymmetrical multi-level diode-clamped inverters, DC-networks, and linear-assisted RF amplifiers may be enhanced by the utilization of topologies based on the PBB converter. Multi-level diode-clamped inverters have the problem of DC-link voltage balancing when the power factor of their load closes to unity. This research has shown that this problem may be solved with a suitable multi-output DC-DC converter supplying DClink capacitors. Furthermore, the multi-level diode-clamped inverters supplied with asymmetrical DC-link voltages may improve the quality of load voltage and reduce the level of Electromagnetic Interference (EMI). Mathematical analyses and experiments on supplying symmetrical and asymmetrical multi-level inverters by specifically designed multi-output DC-DC converters have been reported in two journal papers. Another application in which the system performance can be improved by utilization of the ‘current circulating’ switching state is linear-assisted RF amplifiers in communicational receivers. The concept of ‘linear-assisted’ is to divide the signal into two frequency domains: low frequency, which should be amplified by a switching circuit; and the high frequency domain, which should be amplified by a linear amplifier. The objective is to minimize the overall power loss. This research suggests using the current storage capacity of a PBB based converter to increase its bandwidth, and to increase the domain of the switching converter. The PBB converter addresses the industrial demand for a DC-DC converter for the application of auxiliary power supply of a typical electric train. However, after testing the industrial prototype of the PBB converter, there were some voltage and current spikes because of switching. To attenuate this problem without significantly increasing the switching loss, the idea of Active Gate Signalling (AGS) is presented. AGS suggests a smart gate driver that selectively controls the switching process to reduce voltage/current spikes, without unacceptable reduction in the efficiency of switching.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Capacity reduction programs in the form of buybacks or decommissioning programs have had relatively widespread application in fisheries in the US, Europe and Australia. A common criticism of such programs is that they remove the least efficient vessels first, resulting in an increase in average efficiency of the remaining fleet. The effective fishing power of the fleet, therefore, does not decrease in proportion to the number of vessels removed. Further, reduced crowding may increase efficiency of the remaining vessels. In this paper, the effects of a buyback program on average technical efficiency in Australia’s Northern Prawn Fishery are examined using a multi-output distance function approach with an explicit inefficiency model. The results indicate that average efficiency of the remaining vessels was greater than that of the removed vessels, and that average efficiency of remaining vessels also increased as a result of reduced crowding.