797 resultados para Business Events
Resumo:
The demand for Business Process Management (BPM) is rapidly rising and with that, the need for capable BPM professionals is also rising. Yet, only a very few structured BPM training/ education programs are available, across universities and professional trainers globally. The ‘lack of appropriate teaching resources’ has been identified as a critical issue for BPM educators in prior studies. Case-based teaching can be an effective means of educating future BPM professionals. A main reason is that cases create an authentic learning environment where the complexities and challenges of the ‘real world’ can be presented in a narrative enabling the students to develop crucial skills such as problem solving, analysis and creativity-within-constraints, and to apply the tools and techniques within a richer and real (or proxy to real) context. However, so far well documented BPM teaching cases are scarce. This article aims to contribute to address this gap by providing a comprehensive teaching case and teaching notes that facilitates the education of selected process improvement phases, namely identification, modelling, analysis, and improvement. The article is divided into three main parts: (i) Introductory teaching notes, (ii) The case narrative, and (iii) Student activities from the case and teaching notes.
Resumo:
A business capability, or simply a “capability,” Defines what a business does. It does not communicate or expose where, why, or how something is done. Specifically, the business capability is “a particular ability or capacity that a business may possess or exchange to achieve a specific purpose or outcome.Figure13 provides an external view of a capability by highlighting the fact that a business capability is related to the business in many ways (William Ulrich and Michael Rosen, 2011).
Resumo:
Aspect orientation is an important approach to address complexity of cross-cutting concerns in Information Systems. This approach encapsulates these concerns separately and compose them to the main module when needed. Although there a different works which shows how this separation should be performed in process models, the composition of them is an open area. In this paper, we demonstrate the semantics of a service which enables this composition. The result can also be used as a blueprint to implement the service to support aspect orientation in Business Process Management area.
Resumo:
Reducing complexity in Information Systems is a main concern in both research and industry. One strategy for reducing complexity is separation of concerns. This strategy advocates separating various concerns, like security and privacy, from the main concern. It results in less complex, easily maintainable, and more reusable Information Systems. Separation of concerns is addressed through the Aspect Oriented paradigm. This paradigm has been well researched and implemented in programming, where languages such as AspectJ have been developed. However, the rsearch on aspect orientation for Business Process Management is still at its beginning. While some efforts have been made proposing Aspect Oriented Business Process Modelling, it has not yet been investigated how to enact such process models in a Workflow Management System. In this paper, we define a set of requirements that specifies the execution of aspect oriented business process models. We create a Coloured Petri Net specification for the semantics of so-called Aspect Service that fulfils these requirements. Such a service extends the capability of a Workflow Management System with support for execution of aspect oriented business process models. The design specification of the Aspect Service is also inspected through state space analysis.
Resumo:
Conventional rainfall classification for modelling and prediction is quantity based. This approach can lead to inaccuracies in stormwater quality modelling due to the assignment of stochastic pollutant parameters to a rainfall event. A taxonomy for natural rainfall events in the context of stormwater quality is presented based on an in-depth investigation of the influence of rainfall characteristics on stormwater quality. In the research study, the natural rainfall events were classified into three types based on average rainfall intensity and rainfall duration and the classification was found to be independent of the catchment characteristics. The proposed taxonomy provides an innovative concept in stormwater quality modelling and prediction and will contribute to enhancing treatment design for stormwater quality mitigation.
Resumo:
Significant reform of the laws regulating charities is under way in Australia. The reforms cover almost every facet of the relationship between charities and government and the process has brought to the surface different assumptions about the role of charities in society, their entitlement to fiscal and other privileges and the scope and nature of regulation that can or should be imposed on the charities. This paper explores these broader issues in the context of the Aid/Watch case, involving an organisation used by citizens to challenge the State. Such organisations occupy contested space as to what does and does not constitute a charity. Accordingly the case provides a useful perspective from which to consider the broader issues in the relationship between government and charity. This paper seeks to build on the contribution made by other academics, by exploring the constitutional significance of political purposes and drawing from philosophy to provide context and meaning to potentially significant aspects of the judgment that might be missed when it is analysed only in terms of legal precedent through the narrow lens of the existing four heads of charity. Revenue implications for taxation of charities and political parties are also considered and it is suggested that in practice, if not in theory, the fence between them has come down.
Resumo:
Previous research suggested that due to the uncertainties surrounding the venture creation process, planning activities may be more valuable for already operating firms than for emerging ventures (McGrath and MacMillan, 1995). Business planning may serve different purposes during the early stages of the venture development process. Early planning during the nascent stage may be used to marshal the resources toward the achievement of preliminary goals (Locke and Latham, 2000), to gain external legitimization and funding (Karlssson & Honig, 2009; Stinchcombe, 1965). Planning may reduce the risk of future failure by facilitating the decision making process of launching -or not- the venture (Chwolka & Raith, 2011) by analysing the opportunity and its market potential (Boyd, 1991; Delmar & Shane, 2003). In later stages, planning may have a more internal role and may act as a strategic implementation tool (Brews & Hunt, 1999). However, if the reasons why ventures should engage (Frese, 2009) –or not- (Honig, 2004) in business planning have been investigated quite extensively (Brinckmann et al., 2010), how business plans are actually used over time by new ventures at different stages of their development and how these uses impact the performance of the firms are still unclear.
Resumo:
- Preface by Richard T. Watson - Discusses the emerging challenges of designing “green” business processes - Presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes - Provides insights from cases where organizations successfully engaged in more sustainable business practices Green Business Process Management – Towards the Sustainable Enterprise" consolidates the global state-of-the-art knowledge about how business processes can be managed and improved in light of sustainability objectives. Business organizations, a dominant part of our society, have always been a major contributor to the degradation of our natural environment, through the resource consumption, greenhouse emissions, and wastage production associated with their business processes. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable business processes. Finding solutions to this organizational design problem is the key challenge of Green Business Process Management. This book discusses the emerging challenges of designing “green” business processes, presents tools and methods that organizations can use in order to design and implement environmentally sustainable processes, and provides insights from cases where organizations successfully engaged in more sustainable business practices. The book is of relevance to both practitioners and academics who are interested in understanding, designing, and implementing “green” business processes. It also constitutes a valuable resource for students and lecturers in the fields of information systems, management, and sustainable development.
Resumo:
In managing their operations, organizations have traditionally focused on economic imperatives in terms of time, cost, efficiency, and quality. In doing so, they have been a major contributor to environmental degradation caused by re-source consumption, greenhouse emissions, and wastage. As a consequence, or-ganizations are increasingly encouraged to improve their operations also from an ecological perspective, and thus to consider environmental sustainability as an additional management imperative. In order to lessen their impact on the natural environment, organizations must design and implement environmentally sustainable processes, which we call the challenge of Green Business Process Management (Green BPM). This chapter elaborates on the challenge and perspec-tive of Green BPM, and explores the contributions that business process management can provide to creating environmentally sustainable organizations. Our key premise is that business as well as information technology managers need to engage in a process-focused discussion to enable a common, comprehensive understanding of organizational processes, and the process-centered opportunities for making these processes, and ultimately the organization as a process-centric entity, “green.” Through our review of the key BPM capability areas and how they can be framed in terms of environmental sustainability considerations, we provide an overview and introduction to the subsequent chapters in this book.
Resumo:
Many corporations and individuals realize that environmental sustainability is an urgent problem to address. In this chapter, we contribute to the emerging academic discussion by proposing two innovative approaches for engaging in the development of environmentally sustainable business processes. Specifically, we describe an extended process modeling approach for capturing and documenting the dioxide emissions produced during the execution of a business process. For illustration, we apply this approach to the case of a governmental Shared Services provider. Second, we then introduce an analysis method for measuring the carbon dioxide emissions produced during the execution of a business process. To illustrative this approach, we apply it in the real-life case of an European airport and show how this information can be leveraged in the re-design of “green” busi-ness processes.
Resumo:
The often competing imperatives of equity, simplicity and efficiency in the income tax regime, particularly the notion of simplicity, has been most evident within Australia’s small business sector over the last decade. In an attempt to provide tax simplification and reduce the tax compliance burden faced by Australian small businesses, provisions collectively referred to as the ‘simplified tax system’ or STS were introduced. The STS was designed to provide eligible small businesses with the option of adopting a range of ‘simplified’ tax measures designed to simplify their tax affairs whilst at the same time, reducing their tax compliance costs. Ultimately, a low take-up rate and accompanying criticisms led to a remodelled and rebadged concessionary regime known as the ‘Small Business Entity’ (SBE) regime which came into effect from 1 July 2007. This paper, through a pilot study, investigates the SBE regime though the eyes of the practitioner. In line the Australian Federal Government’s objective of simplification and reduced compliance costs, the purpose of the study was to (1) determine the extent to which the SBE concessions are being adopted by tax practitioners on behalf of their clients, (2) gain an understanding as to which individual SBE tax concessions are most favoured by practitioners, (3) determine the primary motivation as to why tax practitioners recommend particular SBE concessions to their clients, and (4) canvass the opinions of practitioners as to whether they believed that the introduction of the SBE concessions had met their stated objective of reducing tax compliance costs for small businesses. The findings of this research indicate that, while there is a perception that the SBE concessions are worth embracing, contrary to the policy intent, the reasons behind adopting the concessions was the opportunity to minimise a clients’ tax liability. It was revealed that adopting particular concessions had nothing to do with compliance costs savings and, in fact, the SBE concessions merely added another layer of complexity to an already cumbersome and complex tax code, which resulted in increased compliance costs for their small businesses clients. Further, the SBE concessions allowed tax practitioners the opportunity to engage in effective tax minimisation, thereby fulfilling the client advocacy role of the tax practitioner in maximising their clients’ tax preferences.
Resumo:
The complex design process of airport terminal needs to support a wide range of changes in operational facilities for both usual and unusual/emergency events. Process model describes how activities within a process are connected and also states logical information flow of the various activities. The traditional design process overlooks the necessity of information flow from the process model to the actual building design, which needs to be considered as a integral part of building design. The current research introduced a generic method to obtain design related information from process model to incorporate with the design process. Appropriate integration of the process model prior to the design process uncovers the relationship exist between spaces and their relevant functions, which could be missed in the traditional design approach. The current paper examines the available Business Process Model (BPM) and generates modified Business Process Model(mBPM) of check-in facilities of Brisbane International airport. The information adopted from mBPM then transform into possible physical layout utilizing graph theory.
Resumo:
This article sets out the results of an empirical research study into the uses to which the Australian patent system is being put in the early 21st century. The focus of the study is business method patents, which are of interest because they are a controversial class of patent that are thought to differ significantly from the mechanical, chemical and industrial inventions that have traditionally been the mainstay of the patent system. The purpose of the study is to understand what sort of business method patent applications have been lodged in Australia in the first decade of this century and how the patent office is responding to those applications.
Resumo:
Quality oriented management systems and methods have become the dominant business and governance paradigm. From this perspective, satisfying customers’ expectations by supplying reliable, good quality products and services is the key factor for an organization and even government. During recent decades, Statistical Quality Control (SQC) methods have been developed as the technical core of quality management and continuous improvement philosophy and now are being applied widely to improve the quality of products and services in industrial and business sectors. Recently SQC tools, in particular quality control charts, have been used in healthcare surveillance. In some cases, these tools have been modified and developed to better suit the health sector characteristics and needs. It seems that some of the work in the healthcare area has evolved independently of the development of industrial statistical process control methods. Therefore analysing and comparing paradigms and the characteristics of quality control charts and techniques across the different sectors presents some opportunities for transferring knowledge and future development in each sectors. Meanwhile considering capabilities of Bayesian approach particularly Bayesian hierarchical models and computational techniques in which all uncertainty are expressed as a structure of probability, facilitates decision making and cost-effectiveness analyses. Therefore, this research investigates the use of quality improvement cycle in a health vii setting using clinical data from a hospital. The need of clinical data for monitoring purposes is investigated in two aspects. A framework and appropriate tools from the industrial context are proposed and applied to evaluate and improve data quality in available datasets and data flow; then a data capturing algorithm using Bayesian decision making methods is developed to determine economical sample size for statistical analyses within the quality improvement cycle. Following ensuring clinical data quality, some characteristics of control charts in the health context including the necessity of monitoring attribute data and correlated quality characteristics are considered. To this end, multivariate control charts from an industrial context are adapted to monitor radiation delivered to patients undergoing diagnostic coronary angiogram and various risk-adjusted control charts are constructed and investigated in monitoring binary outcomes of clinical interventions as well as postintervention survival time. Meanwhile, adoption of a Bayesian approach is proposed as a new framework in estimation of change point following control chart’s signal. This estimate aims to facilitate root causes efforts in quality improvement cycle since it cuts the search for the potential causes of detected changes to a tighter time-frame prior to the signal. This approach enables us to obtain highly informative estimates for change point parameters since probability distribution based results are obtained. Using Bayesian hierarchical models and Markov chain Monte Carlo computational methods, Bayesian estimators of the time and the magnitude of various change scenarios including step change, linear trend and multiple change in a Poisson process are developed and investigated. The benefits of change point investigation is revisited and promoted in monitoring hospital outcomes where the developed Bayesian estimator reports the true time of the shifts, compared to priori known causes, detected by control charts in monitoring rate of excess usage of blood products and major adverse events during and after cardiac surgery in a local hospital. The development of the Bayesian change point estimators are then followed in a healthcare surveillances for processes in which pre-intervention characteristics of patients are viii affecting the outcomes. In this setting, at first, the Bayesian estimator is extended to capture the patient mix, covariates, through risk models underlying risk-adjusted control charts. Variations of the estimator are developed to estimate the true time of step changes and linear trends in odds ratio of intensive care unit outcomes in a local hospital. Secondly, the Bayesian estimator is extended to identify the time of a shift in mean survival time after a clinical intervention which is being monitored by riskadjusted survival time control charts. In this context, the survival time after a clinical intervention is also affected by patient mix and the survival function is constructed using survival prediction model. The simulation study undertaken in each research component and obtained results highly recommend the developed Bayesian estimators as a strong alternative in change point estimation within quality improvement cycle in healthcare surveillances as well as industrial and business contexts. The superiority of the proposed Bayesian framework and estimators are enhanced when probability quantification, flexibility and generalizability of the developed model are also considered. The empirical results and simulations indicate that the Bayesian estimators are a strong alternative in change point estimation within quality improvement cycle in healthcare surveillances. The superiority of the proposed Bayesian framework and estimators are enhanced when probability quantification, flexibility and generalizability of the developed model are also considered. The advantages of the Bayesian approach seen in general context of quality control may also be extended in the industrial and business domains where quality monitoring was initially developed.
Resumo:
The year 2010 was the wettest year on record for Queensland, Australia and the wettest year since 1974 for Southeast Queensland. The extremely heavy rain in early January 2011 fell on the catchments of heavily saturated Brisbane and Stanley Rivers systems resulting in significant runoff which rapidly produced a widespread and devastating flood event. The area of inundation was equivalent to the total land area of France and Germany combined. Over 200,000 people were affected leaving 35 people dead and 9 missing. The damage bill was estimated at over $1B and cost to the economy at over $10B with over 30,000 homes and 6,000 business flooded and 86 towns and regional centres affected. The need to disburse disaster funding in a prompt manner to the affected population was paramount to facilitate individuals getting their lives back to some normality. However, the payout of insurance claims has proved to be a major area of community anger. The ongoing impasse in payment of insurance compensation is attributed to the nature and number of claims, confusing definition of flooding and the lack or accuracy of information needed to determine individually the properties affected and legitimacy of claims. Information was not readily available at the micro-level including, extent and type of inundation, flood heights at property level and cause of damage. Events during the aftermath highlighted widespread community misconceptions concerning the technical factors associated with the flood event and the impact of such on access to legitimate compensation and assistance. Individual and community wide concerns and frustration, anger and depression, have arisen resulting from delays in the timely settlement of insurance claims. Lessons learnt during the aftermath are presented in the context of their importance as a basis for inculcating communities impacted by the flood event with resilience for the future.