755 resultados para construction techniques
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
The dominant economic paradigm currently guiding industry policy making in Australia and much of the rest of the world is the neoclassical approach. Although neoclassical theories acknowledge that growth is driven by innovation, such innovation is exogenous to their standard models and hence often not explored. Instead the focus is on the allocation of scarce resources, where innovation is perceived as an external shock to the system. Indeed, analysis of innovation is largely undertaken by other disciplines, such as evolutionary economics and institutional economics. As more has become known about innovation processes, linear models, based on research and development or market demand, have been replaced by more complex interactive models which emphasise the existence of feedback loops between the actors and activities involved in the commercialisation of ideas (Manley 2003). Currently dominant among these approaches is the national or sectoral innovation system model (Breschi and Malerba 2000; Nelson 1993), which is based on the notion of increasingly open innovation systems (Chesbrough, Vanhaverbeke, and West 2008). This chapter reports on the ‘BRITE Survey’ funded by the Cooperative Research Centre for Construction Innovation which investigated the open sectoral innovation system operating in the Australian construction industry. The BRITE Survey was undertaken in 2004 and it is the largest construction innovation survey ever conducted in Australia. The results reported here give an indication of how construction innovation processes operate, as an example that should be of interest to international audiences interested in construction economics. The questionnaire was based on a broad range of indicators recommended in the OECD’s Community Innovation Survey guidelines (OECD/Eurostat 2005). Although the ABS has recently begun to undertake regular innovation surveys that include the construction industry (2006), they employ a very narrow definition of the industry and only collect very basic data compared to that provided by the BRITE Survey, which is presented in this chapter. The term ‘innovation’ is defined here as a new or significantly improved technology or organisational practice, based broadly on OECD definitions (OECD/Eurostat 2005). Innovation may be technological or organisational in nature and it may be new to the world, or just new to the industry or the business concerned. The definition thus includes the simple adoption of existing technological and organisational advancements. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment. It builds on a pilot innovation survey undertaken by PricewaterhouseCoopers (PWC) for the Australian Construction Industry Forum on behalf of the Australian Commonwealth Department of Industry Tourism and Resources, in 2001 (PWC 2002). The survey responds to an identified need within the Australian construction industry to have accurate and timely innovation data upon which to base effective management strategies and public policies (Focus Group 2004).
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
Breast conservation therapy (BCT) is the procedure of choice for the management of the early stage breast cancer. However, its utilization has not been maximized because of logistics issues associated with the protracted treatment involved with the radiation treatment. Accelerated Partial Breast Irradiation (APBI) is an approach that treats only the lumpectomy bed plus a 1-2 cm margin, rather than the whole breast. Hence because of the small volume of irradiation a higher dose can be delivered in a shorter period of time. There has been growing interest for APBI and various approaches have been developed under phase I-III clinical studies; these include multicatheter interstitial brachytherapy, balloon catheter brachytherapy, conformal external beam radiation therapy and intra-operative radiation therapy (IORT). Balloon-based brachytherapy approaches include Mammosite, Axxent electronic brachytherapy and Contura, Hybrid brachytherapy devices include SAVI and ClearPath. This paper reviews the different techniques, identifying the weaknesses and strength of each approach and proposes a direction for future research and development. It is evident that APBI will play a role in the management of a selected group of early breast cancer. However, the relative role of the different techniques is yet to be clearly identified.
Resumo:
While raised floors as a building component has been around since the 70's, its application in terms of a holistic system in the fit-out of commercial office buildings has not been fully embraced due to some inherent problems and negative perceptions of the stakeholders involved. Today, the new generation of raised floor systems(RFS) offers a suite of innovative and integrated products and solutions, and as such are not only suitable for the changing office space requirements, but also capable of meeting tbe smart and sustainable challenges, which are becoming the prerequisite in the refurbishment of existing buildings. As there has been a prediction for continued growth in refurbishment projects in major cities around the globe, RFS as an alternative methodology warrants new examination and highlight. This paper introduces research recently completed in Australia that provided a holistic approach to the application of RFS enabled by intelligent building technologies, and examined key issues of project development when refurbishing commercial office buildings. It focuses on the constructability of RFS, and how it will respond to smart feature requirements in buildings while extending service life, meeting new organisational change and workplace health needs for applications in today's office environment. It also introduces key project procurement issues and the integrated decision support when dealing with the refurbishment of office buildings. The paper recommends procurement strategies as well as the justification of adopting the RFS technology in the Australian office building sector. Given the current economic downturn, refitting as opposed to new build .projects will come onto the spotlight. This paper will provide valuable information for building owners and developers alike when contemplating the retrofit of office buildings.
Resumo:
Enterprise development and its contribution to societal and economic outcomes are well known. However, limited research into microenterprises and the practices of microfinance and microcredit in developing countries has been carried out. This chapter presents the findings of research based on six years of engagement with the microentrepreneurs of Beira in Mozambique and suggests a model for responsible and sustainable support for enterprise development in developing economies. Building on semistructured interviews, observation, and participatory action research, this research project articulates a new approach supportive of enterprise development, as a process of cocreation with local people and based on sustainability principles. These findings are part of a longitudinal study of the successes and failures of small enterprises and their impact on social and economic activity.
Resumo:
The Australian Construction Industry Forum (which is a peak industry association) and the Australian Procurement and Construction Council (which is a peak government organisation) have jointly agreed on a set of KPIs for the Australian Construction Industry. The goal of such a process is to work collaboratively in order to lift industry performance overall, and thereby bring about economic and social benefits to the industry and broader community. This paper seeks to underpin the process of KPI measurement by providing: an overview of international approaches to KPI measurement, summary of difficulties identified in performance measurement together with possible responses to these problems, and finally a discussion on the various methods for reporting KPIs. A number of findings throughout the paper, based on the review, made in order to advance the goal of performance measurement in the construction industry in Australia. Such findings would be relevant to other countries considering a KPI measurement process as well.
Resumo:
Rapid prototyping (RP) is a common name for several techniques, which read in data from computer-aided design (CAD) drawings and manufacture automatically threedimensional objects layer-by-layer according to the virtual design. The utilization of RP in tissue engineering enables the production of three-dimensional scaffolds with complex geometries and very fine structures. Adding micro- and nanometer details into the scaffolds improves the mechanical properties of the scaffold and ensures better cell adhesion to the scaffold surface. Thus, tissue engineering constructs can be customized according to the data acquired from the medical scans to match the each patient’s individual needs. In addition RP enables the control of the scaffold porosity making it possible to fabricate applications with desired structural integrity. Unfortunately, every RP process has its own unique disadvantages in building tissue engineering scaffolds. Hence, the future research should be focused into the development of RP machines designed specifically for fabrication of tissue engineering scaffolds, although RP methods already can serve as a link between tissue and engineering.
Resumo:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.
Resumo:
Purpose To identify the challenges faced by local government in Indonesia when adopting a Public Asset Management Framework. Design A Case Study in South Sulawesi Provincial Government was used as the approach to achieving the research objective. The case study involved two data collection techniques - interviews and document analysis. Findings The result of the study indicates there are significant challenges that the Indonesian local government need to manage when adopting a public asset management framework. Those challenges are: absence of an institutional and legal framework to support the asset management application; non-profit principle of public assets; multiple jurisdictions involved in the public asset management processes; the complexity of local government objectives; unavailability of data for managing public property; and limited human resources. Research Limitation This research is limited to one case study. It is a preliminary study from larger research that uses multiple case studies. The main research also investigates opportunities for local government by adopting and implementing public asset management. Originality/Value Findings from this study provide useful input for the policy makers, academics and asset management practitioners in Indonesia to establish a public asset management framework resulting in efficient and effective organizations, as well as an increase of public services quality. This study has a potential application for other developing countries.
Resumo:
This paper presents a comprehensive discussion of vegetation management approaches in power line corridors based on aerial remote sensing techniques. We address three issues 1) strategies for risk management in power line corridors, 2) selection of suitable platforms and sensor suite for data collection and 3) the progress in automated data processing techniques for vegetation management. We present initial results from a series of experiments and, challenges and lessons learnt from our project.
Resumo:
This thesis employs the theoretical fusion of disciplinary knowledge, interlacing an analysis from both functional and interpretive frameworks and applies these paradigms to three concepts—organisational identity, the balanced scorecard performance measurement system, and control. As an applied thesis, this study highlights how particular public sector organisations are using a range of multi-disciplinary forms of knowledge constructed for their needs to achieve practical outcomes. Practical evidence of this study is not bound by a single disciplinary field or the concerns raised by academics about the rigorous application of academic knowledge. The study’s value lies in its ability to explore how current communication and accounting knowledge is being used for practical purposes in organisational life. The main focus of this thesis is on identities in an organisational communication context. In exploring the theoretical and practical challenges, the research questions for this thesis were formulated as: 1. Is it possible to effectively control identities in organisations by the use of an integrated performance measurement system—the balanced scorecard—and if so, how? 2. What is the relationship between identities and an integrated performance measurement system—the balanced scorecard—in the identity construction process? Identities in the organisational context have been extensively discussed in graphic design, corporate communication and marketing, strategic management, organisational behaviour, and social psychology literatures. Corporate identity is the self-presentation of the personality of an organisation (Van Riel, 1995; Van Riel & Balmer, 1997), and organisational identity is the statement of central characteristics described by members (Albert & Whetten, 2003). In this study, identity management is positioned as a strategically complex task, embracing not only logo and name, but also multiple dimensions, levels and facets of organisational life. Responding to the collaborative efforts of researchers and practitioners in identity conceptualisation and methodological approaches, this dissertation argues that analysis can be achieved through the use of an integrated framework of identity products, patternings and processes (Cornelissen, Haslam, & Balmer, 2007), transforming conceptualisations of corporate identity, organisational identity and identification studies. Likewise, the performance measurement literature from the accounting field now emphasises the importance of ‘soft’ non-financial measures in gauging performance—potentially allowing the monitoring and regulation of ‘collective’ identities (Cornelissen et al., 2007). The balanced scorecard (BSC) (Kaplan & Norton, 1996a), as the selected integrated performance measurement system, quantifies organisational performance under the four perspectives of finance, customer, internal process, and learning and growth. Broadening the traditional performance measurement boundary, the BSC transforms how organisations perceived themselves (Vaivio, 2007). The rhetorical and communicative value of the BSC has also been emphasised in organisational self-understanding (Malina, Nørreklit, & Selto, 2007; Malmi, 2001; Norreklit, 2000, 2003). Thus, this study establishes a theoretical connection between the controlling effects of the BSC and organisational identity construction. Common to both literatures, the aspects of control became the focus of this dissertation, as ‘the exercise or act of achieving a goal’ (Tompkins & Cheney, 1985, p. 180). This study explores not only traditional technical and bureaucratic control (Edwards, 1981), but also concertive control (Tompkins & Cheney, 1985), shifting the locus of control to employees who make their own decisions towards desired organisational premises (Simon, 1976). The controlling effects on collective identities are explored through the lens of the rhetorical frames mobilised through the power of organisational enthymemes (Tompkins & Cheney, 1985) and identification processes (Ashforth, Harrison, & Corley, 2008). In operationalising the concept of control, two guiding questions were developed to support the research questions: 1.1 How does the use of the balanced scorecard monitor identities in public sector organisations? 1.2 How does the use of the balanced scorecard regulate identities in public sector organisations? This study adopts qualitative multiple case studies using ethnographic techniques. Data were gathered from interviews of 41 managers, organisational documents, and participant observation from 2003 to 2008, to inform an understanding of organisational practices and members’ perceptions in the five cases of two public sector organisations in Australia. Drawing on the functional and interpretive paradigms, the effective design and use of the systems, as well as the understanding of shared meanings of identities and identifications are simultaneously recognised. The analytical structure guided by the ‘bracketing’ (Lewis & Grimes, 1999) and ‘interplay’ strategies (Schultz & Hatch, 1996) preserved, connected and contrasted the unique findings from the multi-paradigms. The ‘temporal bracketing’ strategy (Langley, 1999) from the process view supports the comparative exploration of the analysis over the periods under study. The findings suggest that the effective use of the BSC can monitor and regulate identity products, patternings and processes. In monitoring identities, the flexible BSC framework allowed the case study organisations to monitor various aspects of finance, customer, improvement and organisational capability that included identity dimensions. Such inclusion legitimises identity management as organisational performance. In regulating identities, the use of the BSC created a mechanism to form collective identities by articulating various perspectives and causal linkages, and through the cascading and alignment of multiple scorecards. The BSC—directly reflecting organisationally valued premises and legitimised symbols—acted as an identity product of communication, visual symbols and behavioural guidance. The selective promotion of the BSC measures filtered organisational focus to shape unique identity multiplicity and characteristics within the cases. Further, the use of the BSC facilitated the assimilation of multiple identities by controlling the direction and strength of identifications, engaging different groups of members. More specifically, the tight authority of the BSC framework and systems are explained both by technical and bureaucratic controls, while subtle communication of organisational premises and information filtering is achieved through concertive control. This study confirms that these macro top-down controls mediated the sensebreaking and sensegiving process of organisational identification, supporting research by Ashforth, Harrison and Corley (2008). This study pays attention to members’ power of self-regulation, filling minor premises of the derived logic of their organisation through the playing out of organisational enthymemes (Tompkins & Cheney, 1985). Members are then encouraged to make their own decisions towards the organisational premises embedded in the BSC, through the micro bottom-up identification processes including: enacting organisationally valued identities; sensemaking; and the construction of identity narratives aligned with those organisationally valued premises. Within the process, the self-referential effect of communication encouraged members to believe the organisational messages embedded in the BSC in transforming collective and individual identities. Therefore, communication through the use of the BSC continued the self-producing of normative performance mechanisms, established meanings of identities, and enabled members’ self-regulation in identity construction. Further, this research establishes the relationship between identity and the use of the BSC in terms of identity multiplicity and attributes. The BSC framework constrained and enabled case study organisations and members to monitor and regulate identity multiplicity across a number of dimensions, levels and facets. The use of the BSC constantly heightened the identity attributes of distinctiveness, relativity, visibility, fluidity and manageability in identity construction over time. Overall, this research explains the reciprocal controlling relationships of multiple structures in organisations to achieve a goal. It bridges the gap among corporate and organisational identity theories by adopting Cornelissen, Haslam and Balmer’s (2007) integrated identity framework, and reduces the gap in understanding between identity and performance measurement studies. Parallel review of the process of monitoring and regulating identities from both literatures synthesised the theoretical strengths of both to conceptualise and operationalise identities. This study extends the discussion on positioning identity, culture, commitment, and image and reputation measures in integrated performance measurement systems as organisational capital. Further, this study applies understanding of the multiple forms of control (Edwards, 1979; Tompkins & Cheney, 1985), emphasising the power of organisational members in identification processes, using the notion of rhetorical organisational enthymemes. This highlights the value of the collaborative theoretical power of identity, communication and performance measurement frameworks. These case studies provide practical insights about the public sector where existing bureaucracy and desired organisational identity directions are competing within a large organisational setting. Further research on personal identity and simple control in organisations that fully cascade the BSC down to individual members would provide enriched data. The extended application of the conceptual framework to other public and private sector organisations with a longitudinal view will also contribute to further theory building.