345 resultados para Construction industry Environmental aspects


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The exchange of design models in the design and construction industry is evolving away from 2-dimensional computer-aided design (CAD) and paper towards semantically-rich 3-dimensional digital models. This approach, known as Building Information Modelling (BIM), is anticipated to become the primary means of information exchange between the various parties involved in construction projects. From a technical perspective, the domain represents an interesting study in model-based interoperability, since the models are large and complex, and the industry is one in which collaboration is a vital part of business. In this paper, we present our experiences with issues of model-based interoperability in exchanging building information models between various tools, and in implementing tools which consume BIM models, particularly using the industry standard IFC data modelling format. We report on the successes and challenges in these endeavours, as the industry endeavours to move further towards fully digitised information exchange.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focuses on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Government of the Hong Kong SAR sponsored a report investigating the Hong Kong construction inudstry and published the investigating committee's findings in 2001 (HK CIRC 2001). Since then the Provisional Construction Industry Coordination Board (PCICB), and its successor, the Construction Industry Council (CIC), also set up by the Government, has made progress with the necessary reforms. Now that seven years have passed, it is time for an independent evaluation of the impact of the CIRC initiative in order to assist the CIC and the Government decision-makers in refining the efforts to improve the industry's performance. This paper reports on the interim results of a study that seeks to provide such an evaluation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Successful construction project managers often stress the importance of team working, relationship management, project environment and senior management commitment as being key determinants of project success. However, it is generally accepted that the construction industry has stronger preference for displaying distrust rather than emancipating the full benefits of cooperation. In the research domain, the impact of culture and organisation on project performance is becoming an increasingly important topic for the establishment of a sound relational approach to projects. Relational procurement strategies emphasise the importance of sustainable relationships. However, the efficacy of relational contracting is, so far, unproven. This study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. Initial findings captured from a survey undertaken with construction contracting organisations in Australia, where the perceptions of professional personnel and supply chain relationships are reported in this paper. A four-level project performance effectiveness model developed in this research is also presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Work time spread across the entire week, rather than the conventional five day working week, has meant that workers are now less able to utilise longer stretches of recreation time especially in gaining access to a full two-day break over a weekend. This paper explores the issues contributing to workers' acquisition of longer recreation time. It seeks to determine the effects of this acquisition on the quality of working and non-working time for the employee through a study of work-life balance in the construction industry. It finds that weekends are more important to achieving work-life balance than shorter days over a six-day week when working long hours. Further, 'personal time' is a key element in achieving satisfactory work-life balance for employees, and this type of 'time' is often forgone in trying to integrate the necessary and desired non-work activities in the shorter time available to workers.