340 resultados para Competition, Infrastructure, Make Or Buy Decision


Relevância:

30.00% 30.00%

Publicador:

Resumo:

An interactive installation with full body interface, digital projection, multi-touch sensitive screen surfaces, interactive 3D gaming software, motorised dioramas, 4.1 spatial sound & new furniture forms - investigating the cultural dimensions of sustainability through the lens of 'time'. “Time is change, time is finitude. Humans are a finite species. Every decision we make today brings that end closer, or alternatively pushes it further away. Nothing can be neutral”. Tony Fry DETAILS: Finitude (Mallee:Time) is a major new media/sculptural hybrid work premiered in 2011 in version 1 at the Ka-rama Motel for the Mildura Palimpsest #8 ('Collaborators and Saboteurs'). Each participant/viewer lies comfortably on their back on the double bed of Room 22. Directly above them, supported by a wooden structure, not unlike a house frame, is a semi-transparent Perspex screen that displays projected 3D imagery and is simultaneously sensitive to the lightest of finger touches. Depending upon the ever changing qualities of the projected image on this screen the participant can see through its surface to a series of physical dioramas suspended above, lit by subtle LED spotlighting. This diorama consists of a slowly rotating series of physical environments, which also include several animatronic components, allowing the realtime composition of whimsical ‘landscapes’ of both 'real' and 'virtual' media. Through subtle, non-didactic touch-sensitive interactivity the participant then has influence over both the 3D graphic imagery, the physical movements of the diorama and the 4.1 immersive soundscape, creating an uncanny blend of physical and virtual media. Five speakers positioned around the room deliver a rich interactive soundscape that responds both audibly and physically to interactions. VERSION 1, CONTEXT/THEORY: Finitude (Mallee: Time) is Version 1 of a series of presentations during 2012-14. This version has been inspired through a series of recent visits and residencies in the SW Victoria Mallee country. Further drawing on recent writings by post colonial author Paul Carter, the work is envisaged as an evolving ‘personal topography’ of place-discovery. By contrasting and melding readily available generalisations of the Mallee regions’ rational surfaces, climatic maps and ecological systems with what Carter calls “a fine capillary system of interconnected words, places, memories and sensations” generated through my own idiosyncratic research processes, Finitude (Mallee Time) invokes a “dark writing” of place through outside eyes - an approach that avoids concentration upon what 'everyone else knows', to instead imagine and develop a sense how things might be. This basis in re-imagining and re-invention becomes the vehicle for the work’s more fundamental intention - as a meditative re-imagination of 'time' (and region) as finite resources: Towards this end, every object, process and idea in the work is re-thought as having its own ‘time component’ or ‘residue’ that becomes deposited into our 'collective future'. Thought this way Finitude (Mallee Time) suggests the poverty of predominant images of time as ‘mechanism’ to instead envisage time as a plastic cyclical medium that we can each choose to ‘give to’ or ‘take away from’ our future. Put another way - time has become finitude.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Agents make up an important part of game worlds, ranging from the characters and monsters that live in the world to the armies the player controls. Despite their importance, agents in current games rarely display an awareness of their environment or react appropriately, which severely detracts from the believability of the game. Most games use agents that have a basic awareness of the player and other agents, but are still unaware of important game events or environmental conditions. This article describes an agent design that combines cellular automata for environmental modeling with influence maps for agent decision-making. The result is simple, flexible game agents that are able to respond to dynamic changes to the environment (e.g., rain or fire) while pursuing a goal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article examines the decision in Turner v Mitchells Solicitors [2011] QDC 61 and the issue whether an application for assessment of costs under an interim bill at the time of a final bill is subject to the usual 12-month restriction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design of artificial intelligence in computer games is an important component of a player's game play experience. As games are becoming more life-like and interactive, the need for more realistic game AI will increase. This is particularly the case with respect to AI that simulates how human players act, behave and make decisions. The purpose of this research is to establish a model of player-like behavior that may be effectively used to inform the design of artificial intelligence to more accurately mimic a player's decision making process. The research uses a qualitative analysis of player opinions and reactions while playing a first person shooter video game, with recordings of their in game actions, speech and facial characteristics. The initial studies provide player data that has been used to design a model of how a player behaves.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The widespread development of Decision Support System (DSS) in construction indicate that the evaluation of software become more important than before. However, it is identified that most research in construction discipline did not attempt to assess its usability. Therefore, little is known about the approach on how to properly evaluate a DSS for specific problem. In this paper, we present a practical framework that can be guidance for DSS evaluation. It focuses on how to evaluate software that is dedicatedly designed for consultant selection problem. The framework features two main components i.e. Sub-system Validation and Face Validation. Two case studies of consultant selection at Malaysian Department of Irrigation and Drainage were integrated in this framework. Some inter-disciplinary area such as Software Engineering, Human Computer Interaction (HCI) and Construction Project Management underpinned the discussion of the paper. It is anticipated that this work can foster better DSS development and quality decision making that accurately meet the client’s expectation and needs

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Based on coronial data gathered in the state of Queensland in 2004, this article reviews how a change in legislation may have impacted autopsy decision making by coroners. More specifically, the authors evaluated whether the requirement that coronial autopsy orders specify the level of invasiveness of an autopsy to be performed by a pathologist was affected by the further requirement that coroners take into consideration a known religion, culture, and/or raised family concern before making such an order. Preliminary data reveal that the cultural status of the deceased did not affect coronial autopsy decision making. However, a known religion with a proscription against autopsy and a raised family concern appeared to be taken into account by coroners when making autopsy decisions and tended to decrease the invasiveness of the autopsy ordered from a full internal examination to either a partial internal examination or an external-only examination of the body. The impact of these findings is briefly discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Accurate reliability prediction for large-scale, long lived engineering is a crucial foundation for effective asset risk management and optimal maintenance decision making. However, a lack of failure data for assets that fail infrequently, and changing operational conditions over long periods of time, make accurate reliability prediction for such assets very challenging. To address this issue, we present a Bayesian-Marko best approach to reliability prediction using prior knowledge and condition monitoring data. In this approach, the Bayesian theory is used to incorporate prior information about failure probabilities and current information about asset health to make statistical inferences, while Markov chains are used to update and predict the health of assets based on condition monitoring data. The prior information can be supplied by domain experts, extracted from previous comparable cases or derived from basic engineering principles. Our approach differs from existing hybrid Bayesian models which are normally used to update the parameter estimation of a given distribution such as the Weibull-Bayesian distribution or the transition probabilities of a Markov chain. Instead, our new approach can be used to update predictions of failure probabilities when failure data are sparse or nonexistent, as is often the case for large-scale long-lived engineering assets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to proliferation of online stores prior expectations that retailing would move completely online were not fulfilled. Previous research about consumers’ preference of retailing channels suggested that online sales are driven by the convenience of online shopping, or as a natural extension of online searches. This paradigm has changed over the years. Changes in consumer behaviour are indicating that while consumers are searching online using various information sources to learn about products, ultimately when purchasing, consumers are shifting between online and offline retailing channels depending on various factors. Online shopping is still considered to be a convenient way to purchase goods, but the convenience is not the key factor. This qualitative research is based on 22 in-depth interviews with shoppers in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is argued that concerns arise about the integrity and fairness of the taxation regime where charitable organizations, which avail themselves of the tax exemption status while undertaking commercial activities, compete directly with the for-profit sector. The appropriateness of the tax concessions granted to charitable organizations is considered in respect of income derived from commercial activities. It is principally argued that the traditional line of reasoning for imposing limitations on tax concessions focuses on an incorrect underlying inquiry. Traditionally, it is argued that limitations should be imposed because of unfair competition, lack of competitive neutrality, or an arbitrary decision relating to a lack of deserving. However, it is argued that a more appropriate question from which to base any limitations is one which considers the value attached to the integrity of the taxation regime as a whole, and the tax base specifically compared to the public good of charities. When the correct underlying question is asked, sound taxation policy ensues, as a less arbitrary approach may be adopted to limit the scope of tax concessions available to charitable organizations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This series of research vignettes is aimed at sharing current and interesting findings from our team of international Entrepreneurship researchers. In this vignette, Dr Henri Burgers considers some of the factors that can make a difference in managing new product development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project selection is a complex decision making process that is not merely influenced by the technical aspects of the project. Selection of road infrastructure projects in the Indonesian public sector is generally conducted at an organisational level, which involves multiple objectives, constraints and stakeholders. Hence, a deeper understanding of the various organisational drivers that impact on such decisions, in particular organisational culture, is much needed for improving decision-making processes as it has been posited by some researchers that organisational culture can become either an enabler, or a barrier, to the process. One part of the cultural assessment undertaken as part of the research, identifies and analyses the cultural types of relevant and involved organisations in the decision making process. The organisational culture assessment instrument (OCAI) of Cameron and Quinn (2011) was utilized in this study and the data was taken from three selected provinces in Indonesia. The results can facilitate the surveyed (and similar) organisations to improve their performance by moving towards a more appropriate cultural typology that is arguably better suited to their operations and to improving their organisational processes to more closely align with their organisational vision, mission and objectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.