540 resultados para Infrastructure Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of the Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound foreign direct income - as part of attracting more foreign contractors and consortia to bid for Australian public sector major infrastructure. As a first step towards attracting greater overseas interest in the Australian public sector market infrastructure market, an improved understanding of the determinants of multinational contractors’ willingness to bid in this market is offered by Dunning’s eclectic paradigm and which have has been a dominant approach in international business for over 20 years and yet has been little used in the context of international contracting. This paper aims to develop Dunning’s eclectic framework and also gives a brief outline of a research plan to collect secondary data and primary data from international contractors around the globe in pursuance of testing the eclectic framework.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). The paper begins with an update on a key development in a new early/first-order procurement decision making model that deploys production cost/benefit theory and theories concerning transaction costs from the New Institutional Economics, in order to identify a procurement mode that is likely to deliver the best ratio of production costs and transaction costs to production benefits, and therefore deliver superior VfM relative to alternative procurement modes. In doing so, the new procurement model is also able to address the uncertainty concerning the relative merits of Public-Private Partnerships (PPP) and non-PPP procurement approaches. The main aim of the paper is to develop competition as a dependent variable/proxy for VfM and a hypothesis (overarching proposition), as well as developing a research method to test the new procurement model. Competition reflects both production costs and benefits (absolute level of competition) and transaction costs (level of realised competition) and is a key proxy for VfM. Using competition as a proxy for VfM, the overarching proposition is given as: When the actual procurement mode matches the predicted (theoretical) procurement mode (informed by the new procurement model), then actual competition is expected to match potential competition (based on actual capacity). To collect data to test this proposition, the research method that is developed in this paper combines a survey and case study approach. More specifically, data collection instruments for the surveys to collect data on actual procurement, actual competition and potential competition are outlined. Finally, plans for analysing this survey data are briefly mentioned, along with noting the planned use of analytical pattern matching in deploying the new procurement model and in order to develop the predicted (theoretical) procurement mode.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Urban expansion continues to encroach on existing or newly implemented sewerage infrastructure. In this context, legislation and guidelines, both national and international, provide limited direction to the amenity allocation of appropriate buffering distances for land use planners and infrastructure providers. A review of published literature suggests the dominant influences include topography, wind speed and direction, temperature, humidity, existing land uses and vegetation profiles. A statistical criteria review of these factors against six years of sewerage odour complaint data was undertaken to ascertain their influence and a complaint severity hierarchy was established. These hierarchical results suggested the main criteria were: topographical location, elevation relative to the odour source and wind speed. Establishing a justifiable criterion for buffer zone allocations will assist in analytically determining a basis for buffer separations and will assist planners and infrastructure designers in assessing lower impact sewerage infrastructure locations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Urban expansion continues to encroach on once isolated sewerage infrastructure. In this context,legislation and guidelines provide limited direction to the amenity allocation of appropriate buffer distances for land use planners and infrastructure providers. Topography, wind speed and direction,temperature, humidity, existing land uses and vegetation profiles are some of the factors that require investigation in analytically determining a basis for buffer separations. This paper discusses the compilation and analysis of six years of Logan sewerage odour complaint data. Graphically,relationships between the complaints, topographical features and meteorological data are presented. Application of a buffer sizing process could assist planners and infrastructure designers alike, whilst automatically providing extra green spaces. Establishing a justifiable criterion for buffer zone allocations can only assist in promoting manageable growth for healthier and more sustainable communities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project-based learning (PBL) is widely used in engineering courses. The closer to real-life the project, the greater the relevance and depth of learning experienced by students. Formula Society of Automotive Engineering (FSAE) is a fine example of a team-based project modelled on real-life problems whereby each student team designs and builds a small race car for competitive evaluation. Queensland University of Technology (QUT) has participated in FSAE-Australia since 2004. Based on the success of the project, QUT has gone the additional step of introducing a motor-racing specialization (second major) to complement its mechanical engineering degree. In this paper, the benefits of teaching motor-racing engineering through real-life projects are presented together with a discussion of the challenges faced and how they have been addressed. In order to validate the authors' observations on the teaching approaches used, student feedback was solicited through QUT's online learning experience survey (LEX), as well as a customized paper-based survey. The results of the surveys are analysed and discussed in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Researchers are increasingly involved in data-intensive research projects that cut across geographic and disciplinary borders. Quality research now often involves virtual communities of researchers participating in large-scale web-based collaborations, opening their earlystage research to the research community in order to encourage broader participation and accelerate discoveries. The result of such large-scale collaborations has been the production of ever-increasing amounts of data. In short, we are in the midst of a data deluge. Accompanying these developments has been a growing recognition that if the benefits of enhanced access to research are to be realised, it will be necessary to develop the systems and services that enable data to be managed and secured. It has also become apparent that to achieve seamless access to data it is necessary not only to adopt appropriate technical standards, practices and architecture, but also to develop legal frameworks that facilitate access to and use of research data. This chapter provides an overview of the current research landscape in Australia as it relates to the collection, management and sharing of research data. The chapter then explains the Australian legal regimes relevant to data, including copyright, patent, privacy, confidentiality and contract law. Finally, this chapter proposes the infrastructure elements that are required for the proper management of legal interests, ownership rights and rights to access and use data collected or generated by research projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fixed-wing aircraft equipped with downward pointing cameras and/or LiDAR can be used for inspecting approximately piecewise linear assets such as oil-gas pipelines, roads and power-lines. Automatic control of such aircraft is important from a productivity and safety point of view (long periods of precision manual flight at low-altitude is not considered reasonable from a safety perspective). This paper investigates the effect of any unwanted coupling between guidance and autopilot loops (typically caused by unmodeled delays in the aircraft’s response), and the specific impact of any unwanted dynamics on the performance of aircraft undertaking inspection of piecewise linear corridor assets (such as powerlines). Simulation studies and experimental flight tests are used to demonstrate the benefits of a simple compensator in mitigating the unwanted lateral oscillatory behaviour (or coupling) that is caused by unmodeled time constants in the aircraft dynamics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose Maintenance management is a core process in infrastructure asset management. Infrastructure organisations must constantly strive to ensure the effectiveness of this process in order to obtain the greatest lifetime value from their infrastructure assets. This paper aims to investigate how infrastructure organisations can enhance the effectiveness of their maintenance management process. Approach This study utilised multiple case studies as the research approach. The case organisations were asked to identify the challenges faced in the maintenance process and the approaches they have adopted to overcome these challenges. Analysis of these findings, together with deductive reasoning, leads to the development of the proposed capability needed for effective maintenance management process. Findings The case studies reveal that maintenance management process is a core process in ensuring that infrastructure assets are optimally and functionally available to support business operations. However, the main challenge is the lack of skilled and experienced personnel to understand and anticipate maintenance requirement. A second challenge is the reduced window of time available to carry out inspection and maintenance works. To overcome these challenges, the case organisations have invested in technologies. However, technologies available to facilitate this process are complex and constantly changing. Consequently, there is a need for infrastructure organizations to develop their technological absorptive capability, i.e. the ability to embrace and capitalize on new technologies to enhance their maintenance management process. Originality/Value This paper is original in that it provides empirical evidence to identify technological absorptive capability as core to improving the maintenance management process. The findings are valuable because it sheds light on where infrastructure organisation, regardless of whether they are privately or publicly owned, should channel their scarce resources. The development of the core capability will ensure that the maintenance process can contribute value to their organisation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Infrastructure organizations are operating in an increasingly challenging business environment as a result of globalization, privatization and deregulation. In an external business environment that is constantly changing, extant literature on strategic management advocates the need to focus on factors internal to the organization such as resources and capabilities to sustain their performance. Specifically, they need to develop dynamic capabilities in order to survive and prosper under conditions of change. The aim of this paper is to explore the dynamic capabilities needed in the management of transport infrastructure assets using a multiple case study research strategy. This paper produced a number of findings. First, the empirical evidence showed that the core infrastructure asset management processes are capacity management, options evaluation, procurement & delivery, maintenance management, and asset information management. Second, the study identified five dynamic capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets in an increasingly dynamic business environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.