387 resultados para Civil engineering work
Resumo:
Residential dissonance signifies a mismatch between an individual’s preferred and actual proximal land use patterns in residential neighbourhoods, whereas residential consonance signifies agreement between actual and preferred proximal land uses. Residential dissonance is a relatively unexplored theme in the literature, yet it acts as a barrier to the development of sustainable transport and land use policy. This research identifies mode choice behaviour of four groups living in transit oriented development (TOD) and non-TOD areas in Brisbane, Australia using panel data from 2675 commuters: TOD consonants, TOD dissonants, non-TOD consonants, and non-TOD dissonants. The research investigates a hypothetical understanding that dissonants adjust their travel attitudes and perceptions according to their surrounding land uses over time. The adjustment process was examined by comparing the commuting mode choice behaviour of dissonants between 2009 and 2011. Six binary logistic regression models were estimated, one for each of the three modes considered (e.g. public transport, active transport, and car) and one for each of the 2009 and 2011 waves. Results indicate that TOD dissonants and non-TOD consonants were less likely to use the public transport and active transport; and more likely to use the car compared with TOD consonants. Non-TOD dissonants use public transport and active transport equally to TOD consonants. The results suggest that commuting mode choice behaviour is largely determined by travel attitudes than built environment factors; however, the latter influence public transport and car use propensity. This research also supports the view that dissonants adjust their attitudes to surrounding land uses, but very slowly. Both place (e.g. TOD development) and people-based (e.g. motivational) policies are needed for an effective travel behavioural shift.
Resumo:
This study investigates: –how travel and socio-demographic attributes act on workers’ mode choice decisions in Dhaka –whether Dhaka’s commuters would choose BRT for their work trip once implemented •Very limited research exists on users’ perceptions of BRT in developing countries’ megacities •We adopted a discrete choice modelling approach •As BRT has not yet been implemented in Dhaka, we collected Stated Choice (SC) survey data including a hypothetical BRT mode to understand factors important to workers’ mode choice decisions •We compare the impact of travel factors between Dhaka and cities of developed countries
Resumo:
Problem solving is an essential element of civil engineering education. It has been I observed that students are best able to understand civil engineering theory when there is a ' practical application of it. Teaching theory alone has led to lower levels of comprehension and motivation and a correspondingly higher rate of failure and "drop-out". This paper analyses the effectiveness of introducing practical design projects at an early stage within a civil engineering undergraduate program at Queensland University of Technology. In two of the essential basic subjects, Engineering Mechanics and Steel Structures, model projects which simulate realistic engineering exercises were introduced. Students were required to work in small groups to analyse, design and build the lightest I most efficient model bridges made of specific materials such as spaghetti, drinking straw, paddle pop sticks and balsa wood and steel columns for a given design loading/target capacity. The paper traces the success of the teaching strategy at each stage from its introduction through to the final student and staff evaluation.
Resumo:
A sound understanding of travellers’ behavioural changes and adaptation when facing a natural disaster is a key factor in efficiently and effectively managing transport networks at such times. This study specifically investigates the importance of travel/traffic information and its impact on travel behaviour during natural disasters. Using the 2011 Brisbane flood as a case study, survey respondents’ perceptions of the importance of travel/traffic information before, during, and after the flood were modelled using random-effects ordered logit. A hysteresis phenomenon was observed: respondents’ perceptions of the importance of travel/traffic information increased during the flood, and although its perceived importance decreased after the flood, it did not return to the pre-flood level. Results also reveal that socio-demographic features (such as gender and age) have a significant impact on respondents’ perceptions of the importance of travel/traffic information. The roles of travel time and safety in a respondent’s trip planning are also significantly correlated to their perception of the importance of this information. The analysis further shows that during the flood, respondents generally thought that travel/traffic information was important, and adjusted their travel plans according to information received. When controlling for other factors, the estimated odds of changing routes and cancelling trips for a respondent who thought that travel/traffic information was important, are respectively about three times and seven times the estimated odds for a respondent who thought that travel/traffic information was not important. In contrast, after the flood, the influence of travel/traffic information on respondents’ travel behaviour diminishes. Finally, the analysis shows no evidence of the influence of travel/traffic information’s on respondents’ travel mode; this indicates that inducing travel mode change is a challenging task.
Resumo:
This study presents the results of the first large scale survey of Australian builders’ beliefs about prefabrication, drawing on 454 surveys completed by representatives of building companies in Queensland and Western Australia. Previous literature has identified a number of broad themes affecting the uptake of prefabrication. The current study builds on this work by using a structured theoretical model based on the Theory of Planned Behaviour (TPB) and the Technology Acceptance Model (TAM), to further explore the specific factors influencing builders’ intentions to increase their use of prefabrication. Information was gathered concerning the characteristics of respondents in addition to three aims. The aims were: (1) To identify the relative importance of a number of key factors which may affect builders’ use of prefabrication, (2) To compare the characteristics of builders using various levels of prefabrication (including none), and; (3) To determine if a model based on the TPB, TAM, and other control variables can explain builders’ intentions to adopt prefabrication on their housing projects.
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.
Resumo:
In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.
Resumo:
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.
Resumo:
Air transport is a critical link to regional, rural and remote communities in Australia. Air services provide important economic and social benefits but very little research has been done on assessing the value of regional aviation. This research provides the first empirical evidence that there is short and long run causality between regional aviation and economic growth. The authors analysed 88 regional airports in Australia over a period of 1985–86 to 2010–11 to determine the catalytic impacts of regional air transport on regional economic growth. The analysis was conducted using annual data related to total airport passenger movements – for the level of airport activity, and real aggregate taxable income – to represent economic growth. A significant bi-directional relationship was established: airports have an impact on regional economic growth and the economy directly impacts regional air transport. The economic significance of regional air transport confirms the importance of the airport as infrastructure for regional councils and the need for them to maintain and develop local airports. Funding should be targeted at airports directly to support regional development.
Resumo:
Constructed wetlands are among the most common Water Sensitive Urban Design (WSUD) measures for stormwater treatment. These systems have been extensively studied to understand their performance and influential treatment processes. Unfortunately, most past studies have been undertaken considering a wetland system as a lumped system with a primary focus on the reduction of the event mean concentration (EMC) values of specific pollutant species or total pollutant load removal. This research study adopted an innovative approach by partitioning the inflow runoff hydrograph and then investigating treatment performance in each partition and their relationships with a range of hydraulic factors. The study outcomes confirmed that influenced by rainfall characteristics, the constructed wetland displays different treatment characteristics for the initial and later sectors of the runoff hydrograph. The treatment of small rainfall events (<15 mm) is comparatively better at the beginning of runoff events while the trends in pollutant load reductions for large rainfall events (>15 mm) are generally lower at the beginning and gradually increase towards the end of rainfall events. This highlights the importance of ensuring that the inflow into a constructed wetland has low turbulence in order to achieve consistent treatment performance for both, small and large rainfall events.
Resumo:
Heavy metals that are built-up on urban impervious surfaces such as roads are transported to urban water resources through stormwater runoff. Therefore, it is essential to understand the predominant pathways of heavy metals to the build-up on roads in order to develop suitable pollution mitigation strategies to protect the receiving water environment. The study presented in this paper investigated the sources and transport pathways of manganese, lead, copper, zinc and chromium, which are heavy metals commonly present in urban road build-up. It was found that manganese and lead are contributed to road build-up primarily by direct deposition due to the re-suspension of roadside soil by wind turbulence, while traffic is the predominant source of copper, zinc and chromium to the atmosphere and road build-up. Atmospheric deposition is also the major transport pathway for copper and zinc, and for chromium, direct deposition by traffic sources is the predominant pathway.
Resumo:
Sediment samples were taken from six sampling sites in Bramble Bay, Queensland, Australia between February and November in 2012. They were analysed for a range of heavy metals including Al, Fe, Mn, Ti, Ce, Th, U, V, Cr, Co, Ni, Cu, Zn, As, Cd, Sb, Te, Hg, Tl and Pb. Fraction analysis, enrichment factors and Principal Component Analysis –Absolute Principal Component Scores (PCA-APCS) were carried out in order to assess metal pollution, potential bioavailability and source apportionment. Cr and Ni exceeded the Australian Interim Sediment Quality Guidelines at some sampling sites, while Hg was found to be the most enriched metal. Fraction analysis identified increased weak acid soluble Hg and Cd during the sampling period. Source apportionment via PCA-APCS found four sources of metals pollution, namely, marine sediments, shipping, antifouling coatings and a mixed source. These sources need to be considered in any metal pollution control measure within Bramble Bay.
Resumo:
The construction industry is a crucial component of the Hong Kong economy, and the safety and efficiency of workers are two of its main concerns. The current approach to training workers relies primarily on instilling practice and experience in conventional teacher-apprentice settings on and off site. Both have their limitations however, on-site training is very inefficient and interferes with progress on site, while off-site training provides little opportunity to develop the practical skills and awareness needed through hands-on experience. A more effective way is to train workers in safety awareness and efficient working by current novel information technologies. This paper describes a new and innovative prototype system – the Proactive Construction Management System (PCMS) – to train precast installation workers to be highly productive while being fully aware of the hazards involved. PCMS uses Chirp-Spread-Spectrum-based (CSS) real-time location technology and Unity3D-based data visualisation technology to track construction resources (people, equipment, materials, etc.) and provide real-time feedback and post-event visualisation analysis in a training environment. A trial of a precast facade installation on a real site demonstrates the benefits gained by PCMS in comparison with equivalent training using conventional methods. It is concluded that, although the study is based on specific industrial conditions found in Hong Kong construction projects, PCMS may well attract wider interest and use in future.