384 resultados para Project performance Infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The concept of market-driven rather than product-driven quality management has been given prominence through the report of a recent inquiry into the performance of the Hong Kong construction industry. The report submitted to the Government of Hong Kong in 2001 establishes a new vision of ‘an integrated industry that is capable of continuous improvement towards excellence in the market-driven environment’. Given the current economic downturn, major contractors are facing many challenges to realize this new quality oriented vision. This paper addresses the critical and timely issue of applying quality management to the project delivery process in Hong Kong. The paper attempts to capture and critically examine management perceptions of quality management aspects as applied to a local large-scale road construction project. Based on the analysis of questionnaire feedback and face-to-face interviews, the paper reveals key attributes of a successful application of quality management approaches, and identifies a mechanism for facilitating such implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Participant performance is critical to the success of projects. At the same time, enhancing the satisfaction of participants not only helps in problem solving but also improves their motivation and cooperation. However, previous research related to participant satisfaction is primarily concerned with clients and customers and relatively little attention has been paid to contractors. This paper investigates how the performance of project participants affects contractor project satisfaction in terms of the client's clarity of objectives (OC) and promptness of payments (PP), designer carefulness (DC), construction risk management (RM), the effectiveness their contribution (EW) and mutual respect and trust (RT). With 125 valid responses from contractors in Malaysia, a contractor satisfaction model is developed based on structural equation modelling. The results demonstrate the necessity for dividing abstract satisfaction into two dimensions, comprising economic-related satisfaction (ES) and production-related satisfaction (PS), with DC, OC, PP and RM having significant effects on ES, while DC, OC, EW and RM influence PS. In addition, the model tests the indirect effects of these performance variables on ES and PS. In particular, OC indirectly affects ES and PS through mediation of RM and DC respectively. The results also provide opportunities for improving contractor satisfaction and supplementing the contractor selection criteria for clients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This practice-led research enquiry identifies, develops and illustrates workshop ecology in Applied Performance. It explores how Applied Performance forms are applied in and transformed through action in two distinct community-learning settings. The research is undertaken in two performance sites. The first, involving an executive leadership program addressing complex project management for Australia's Defence Materiel Organisation in Canberra, Australia. The second, a sexual health, HIV and AIDS education program to raise awareness and encourage the prevention of transmission of sexual diseases within Karkar Island, Papua New Guinea. The research strategies draw upon a mixed method approach involving practice-led research participant observation. The findings from each performance site show how the workshop ecology shapes and transforms performance forms as they are applied and influences the degree to which they are effective. It is anticipated that the findings from this research will assist Applied Performance practitioners to more carefully consider workshop ecology in the design and delivery of Applied Performances.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over a seven-year period, Mark Radvan directed a suite of children’s theatre productions adapted from the original Tashi stories by Australian writers Anna and Barbara Fienberg. The Tashi Project’s repertoire of plays performed to over 40,000 children aged between 3 and 10 years old, and their carers, in seasons at the Out of the Box Festival, at Brisbane Powerhouse and in venues across Australia in two interstate tours in 2009 and 2010. The project investigated how best to combine an exploration of theatrical forms and conventions, with a performance style evolved in a specially developed training program and a deliberate positioning of young children as audiences capable of sophisticated readings of action, symbol, theme and character. The results of this project show that when brought into appropriate relationship with the theatre artists, young children aged 3-5 can engage with sophisticated narrative forms, and with the right contextual framing they enjoy heightened dramatic and emotional tension, bringing to the event sustained and highly engaged concentration. Older children aged 6-10 also bring sustained and heightened engagement to the same stories, providing that other more sophisticated dramatic elements are woven into the construction of the performances, such as character, theme and style.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Social Science (Organization Studies, Economics, Management Science, Strategy, International Relations, Political Science…) the quest for addressing the question “what is a good practitioner?” has been around for centuries, with the underlying assumptions that good practitioners should lead organizations to higher levels of performance. Hence to ask “what is a good “captain”?” is not a new question, we should add! (e.g. Tsoukas & Cummings, 1997, p. 670; Söderlund, 2004, p. 190). This interrogation leads to consider problems such as the relations between dichotomies Theory and Practice, rigor and relevance of research, ways of knowing and knowledge forms. On the one hand we face the “Enlightenment” assumptions underlying modern positivist Social science, grounded in “unity-of-science dream of transforming and reducing all kinds of knowledge to one basic form and level” and cause-effects relationships (Eikeland, 2012, p. 20), and on the other, the postmodern interpretivist proposal, and its “tendency to make all kinds of knowing equivalent” (Eikeland, 2012, p. 20). In the project management space, this aims at addressing one of the fundamental problems in the field: projects still do not deliver their expected benefits and promises and therefore the socio-economical good (Hodgson & Cicmil, 2007; Bredillet, 2010, Lalonde et al., 2012). The Cartesian tradition supporting projects research and practice for the last 60 years (Bredillet, 2010, p. 4) has led to the lack of relevance to practice of the current conceptual base of project management, despite the sum of research, development of standards, best & good practices and the related development of project management bodies of knowledge (Packendorff, 1995, p. 319-323; Cicmil & Hodgson, 2006, p. 2–6, Hodgson & Cicmil, 2007, p. 436–7; Winter et al., 2006, p. 638). Referring to both Hodgson (2002) and Giddens (1993), we could say that “those who expect a “social-scientific Newton” to revolutionize this young field “are not only waiting for a train that will not arrive, but are in the wrong station altogether” (Hodgson, 2002, p. 809; Giddens, 1993, p. 18). While, in the postmodern stream mainly rooted in the “practice turn” (e.g. Hällgren & Lindahl, 2012), the shift from methodological individualism to social viscosity and the advocated pluralism lead to reinforce the “functional stupidity” (Alvesson & Spicer, 2012, p. 1194) this postmodern stream aims at overcoming. We suggest here that addressing the question “what is a good PM?” requires a philosophy of practice perspective to complement the “usual” philosophy of science perspective. The questioning of the modern Cartesian tradition mirrors a similar one made within Social science (Say, 1964; Koontz, 1961, 1980; Menger, 1985; Warry, 1992; Rothbard, 1997a; Tsoukas & Cummings, 1997; Flyvbjerg, 2001; Boisot & McKelvey, 2010), calling for new thinking. In order to get outside the rationalist ‘box’, Toulmin (1990, p. 11), along with Tsoukas & Cummings (1997, p. 655), suggests a possible path, summarizing the thoughts of many authors: “It can cling to the discredited research program of the purely theoretical (i.e. “modern”) philosophy, which will end up by driving it out of business: it can look for new and less exclusively theoretical ways of working, and develop the methods needed for a more practical (“post-modern”) agenda; or it can return to its pre-17th century traditions, and try to recover the lost (“pre-modern”) topics that were side-tracked by Descartes, but can be usefully taken up for the future” (Toulmin, 1990, p. 11). Thus, paradoxically and interestingly, in their quest for the so-called post-modernism, many authors build on “pre-modern” philosophies such as the Aristotelian one (e.g. MacIntyre, 1985, 2007; Tsoukas & Cummings, 1997; Flyvbjerg, 2001; Blomquist et al., 2010; Lalonde et al., 2012). It is perhaps because the post-modern stream emphasizes a dialogic process restricted to reliance on voice and textual representation, it limits the meaning of communicative praxis, and weaking the practice because it turns away attention from more fundamental issues associated with problem-definition and knowledge-for-use in action (Tedlock, 1983, p. 332–4; Schrag, 1986, p. 30, 46–7; Warry, 1992, p. 157). Eikeland suggests that the Aristotelian “gnoseology allows for reconsidering and reintegrating ways of knowing: traditional, practical, tacit, emotional, experiential, intuitive, etc., marginalised and considered insufficient by modernist [and post-modernist] thinking” (Eikeland, 2012, p. 20—21). By contrast with the modernist one-dimensional thinking and relativist and pluralistic post-modernism, we suggest, in a turn to an Aristotelian pre-modern lens, to re-conceptualise (“re” involving here a “re”-turn to pre-modern thinking) the “do” and to shift the perspective from what a good PM is (philosophy of science lens) to what a good PM does (philosophy of practice lens) (Aristotle, 1926a). As Tsoukas & Cummings put it: “In the Aristotelian tradition to call something good is to make a factual statement. To ask, for example, ’what is a good captain’?’ is not to come up with a list of attributes that good captains share (as modem contingency theorists would have it), but to point out the things that those who are recognized as good captains do.” (Tsoukas & Cummings, 1997, p. 670) Thus, this conversation offers a dialogue and deliberation about a central question: What does a good project manager do? The conversation is organized around a critic of the underlying assumptions supporting the modern, post-modern and pre-modern relations to ways of knowing, forms of knowledge and “practice”.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study investigated how contemporary puppet-based theatre can create deeply imaginative experiences for adult audiences. Designed to interrogate the potential effects of double-vision (Tillis, 1992), the theories of the sublime (Kant, 2008; 2003) and the uncanny (Jentsch, 1906; Freud, 1919) were used to create a series of creative guidelines. As practice-led research, the project embraced an iterative approach consisting of two cycles for creative experimentation, and a third for the creation of the final performance work The Harbinger, presented as a part of La Boite Theatre Company’s mainstage season. A theoretical investigation was also conducted to inform the developing practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes the work being conducted in the baseline rail level crossing project, supported by the Australian rail industry and the Cooperative Research Centre for Rail Innovation. The paper discusses the limitations of near-miss data for analysis obtained using current level crossing occurrence reporting practices. The project is addressing these limitations through the development of a data collection and analysis system with an underlying level crossing accident causation model. An overview of the methodology and improved data recording process are described. The paper concludes with a brief discussion of benefits this project is expected to provide the Australian rail industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development of toll roads in Indonesia started around 1978. Initially, the management and development of toll roads sat directly under the Government of Indonesia (GoI) being undertaken through PT JasaMarga, a state owned enterprise specifically established to provide toll roads. Due to the slow growth and low capability of toll roads to fulfil infrastructure needs in the first ten years of operation (only 2.688kms/year), GoI changed its strategy in 1989 to one of using private sector participation for roads delivery through a Public Private Partnership (PPP) scheme. In this latter period, PT JasaMarga had two roles, both as regulator on behalf of the private sector as well as being the operator. However, from 1989 to 2004 the growth rate of toll roads actually decreased further to 2.300kms/year. Facing this challenge of low growth rate of toll roads, in 2004GoI changed the toll road management system and the role of regulator was returned to the Government through the establishment of the Toll Road Regulatory Agency (BPJT). GoI also amended the institutional framework to strengthen the toll road management system. Despite the introduction of this new institutional framework, the growth of toll roads still showed insignificant change. This problem in toll road development has generated an urgent need for research into this issue. The aim of the research is to understand the performance of the new institutional framework in enhancing PPP procured toll road development. The methodology of the research was to undertake a questionnaire survey distributed to private sector respondents involved in toll road development. The results of this study show that there are several problems inherent in the institutional framework, but the most significant problem comes from the uncertainty of the function of the strategic executive body in the land expropriation process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For construction stakeholders to fully embrace sustainability, its long-term benefits and associated risks need to be identified through holistic approaches. Consensus among key stakeholders is very important to the improvement of the ecological performance of industrialized building systems (IBS), a building construction method gaining momentum in Malaysia. A questionnaire survey examines the relative significance of 16 potentially important sustainability factors for IBS applications. To present possible solutions,semi-structured interviews solicit views from experienced IBS practitioners, representing the professions involved. Three most critical factors agreed by key stakeholders are material consumption, waste generation and waste disposal. Using SWOT analysis, the positive and negative aspects of these factors are investigated, with action plans formulated for IBS design practitioners. The SWOT analysis based guidelines have the potential to become part of IBS design briefing documents against which sustainability solutions are contemplated, selected and implemented. Existing knowledge on ecological performance issues is extended by considering the unique characteristics of IBS and identifying not only the benefits, but also the potential risks and challenges of pursuing sustainability. This is largely missing in previous research efforts. Findings to date focus on providing much-needed assistance to IBS designers, who are at the forefront of decision-making with a significant level of project influence. Ongoing work will be directed towards other project development phases and consider the inherent linkage between design decisions and subsequent sustainability deliverables in the project life cycle.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Highway infrastructure development typically requires major capital input. Unless planned properly, such requirements can cause serious financial constraints for investors. The push for sustainability adds a new dimension to the complexity of evaluating highway projects. Finding environmentally and socially responsible solutions for highway construction will improve its potential for acceptance by the society and in many instances the infrastructure's life span. Even so, the prediction and determination of a project's long-term financial viability can be a precarious exercise. Existing studies in this area have not indicated details of how to identify and deal with costs incurred in pursuing sustainability measures in highway infrastructure. This paper provides insights into the major challenges of implementing sustainability in highway project development in terms of financial concerns and obligations. It discusses the results from recent research through a literature study and a questionnaire survey of key industry stakeholders involved in highway infrastructure development. The research identified critical cost components relating to sustainability measures based on perspectives of industry stakeholders. All stakeholders believe sustainability related costs are an integral part of the decision making. However, the importance rating of these costs is relative to each stakeholder's core business objectives. This will influence the way these cost components are dealt with during the evaluation of highway investment alternatives and financial implications. This research encourages positive thinking among the highway infrastructure practitioners about sustainability. It calls for the construction industry to maximise sustainability deliverables while ensuring financial viability over the life cycle of highway infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Large infrastructure projects are a major responsibility of urban and regional governments, who usually lack expertise to fully specify the demanded projects. Contractors, typically experts on such projects due to experience with similar projects elsewhere, advise of the needed design in their bids. Producing the right design is nevertheless costly. We model such infrastructure projects taking into account their credence goods feature and the costly design effort they require and examine the performance of commonly used contracting methods. We show that when building costs are homogeneous and public information, multi-stage competitive bidding involving shortlisting of two contractors and contingent compensation of both contractors on design efforts outperforms sequential search and the traditional Design-and-Build approach. If building costs are private information of the contractors and are revealed to them after design cost is sunk, sequential search may be superior to the other two methods.