409 resultados para Construction industry -- Management.


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Hong Kong in summer (June - October) is hot and humid. Construction workers have to undertake physically demanding activities and often in confined spaces. They are vulnerable to heat stress in summer hence health and safety measures associated to heat stress measured by scientific and clinical parameters are urgently needed. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR. The aim of this study is to develop a set of indices measured by clinical and scientific methods to detect impending attacks of heat stress. These indices would be of tremendous value in better safeguarding workers’ health and safety by reducing the occurrences of heat stress on site. This paper firstly reports on the statistics of construction incidents arising from heat stress. Qualitative and quantitative research methods applied in conducting the research are discussed. It is believed that the construction industry and the government would benefit a lot as a result of this study.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

4D simulation, building information modeling, virtual construction, computer simulation and virtual prototyping are emerging topics in the building construction industry. These techniques not only relate to the buildings themselves, but can also be applied to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of plant and equipment, applying such virtual methods benefits the understanding of all parties in construction practice. This paper describes the relationship between temporary platforms, plant and equipment resources and a proposed-built model in the construction planning and use of Virtual Prototyping Simulation (VPS) to implement different construction scenarios in order to help planners identify an optimal construction plan. A case study demonstrates the use of VPS integrated with temporary platform design and plant and equipment-resource allocation to generate different construction scenarios.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

According to Tan et al. (2011), the establishment of a clear sustainability policy in the construction industry is paramount, if only as a statement of the commitment of the top management to protecting the environment and enhancing social responsibility. The resulting policies should then translate into proactive strategies and action plans that improve the sustainability performance of contractors and provide a competitive advantage by integrating “long-run profitability” with sustainable development efforts. The strategies should also take into account climatic protection issues through greenhouse gas emissions (GHGe) monitoring and reduction initiatives (Stocker & Luptacik, 2009)...

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Unsafe acts of workers (e.g. misjudgment, inappropriate operation) become the major root causes of construction accidents when they are combined with unsafe working conditions (e.g. working surface conditions, weather) on a construction site. The overarching goal of the research presented in this paper is to explore ways to prevent unsafe acts of workers and reduce the likelihood of construction accidents occurring. The study specifically aims to (1) understand the relationships between human behavior related and working condition related risk factors, (2) identify the significant behavior and condition factors and their impacts on accident types (e.g. struck by/against, caught in/between, falling, shock, inhalation/ingestion/absorption, respiratory failure) and injury severity (e.g. fatality, hospitalized, non-hospitalized), and (3) analyze the fundamental accident-injury relationship on how each accident type contributes to the injury severity. The study reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011. The large number of accident samples supported reliable statistical analyses. The analysis identified a total of 17 significant correlations between behavior and condition factors and distinguished key risk factors that highly impacted on the determination of accident types and injury severity. The research outcomes will assist safety managers to control specific unsafe acts of workers by eliminating the associated unsafe working conditions and vice versa. They also can prioritize risk factors and pay more attention to controlling them in order to achieve a safer working environment.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

To provide valuable industry information with human resource applications, this study aimed to identify the minimum level of competency required within organisations to manage occupational road risk. Senior managers from four Australian organisations participated in individual semi-structured interviews. These senior managers were responsible for a combined workforce of approximately 46,000 and a combined fleet of approximately 20,000. The managers assessed a list of 39 safety management tasks that had previously been identified as critical to the management of Occupational Health and Safety (OHS) performance within the construction industry. From this list the managers perceived that organisational personnel required competency in at least 14 of the safety tasks to meet a minimum standard of road risk management. Managers perceived that a full understanding of at least six of these tasks was critical. These six tasks comprised: hazard identification and control; providing OHS information and instruction; incident investigations; inspections of workplace and work tasks; researching and reporting on OHS issues and strategies; and applying legislative OHS requirements. It is hoped that the core competencies identified in this study may assist in the development of an internationally accepted competency framework for managing occupational road risks. This proposed competency framework could have many applications including guiding the design of job descriptions, training curriculums, and employee performance assessments. To build upon this study, the authors recommend future research be conducted to identify the key competencies required to manage occupational road safety across a broad range of organisational contexts.