183 resultados para in-house maintenance projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge of the elements present in house dusts is important in understanding potential health effects on humans. In this study, dust samples collected from 10 houses in south-east Queensland have been analysed by scanning electron microscopy and X-ray microanalysis to measure the inorganic element compositions and to investigate the form of heavy metals in the dusts. The overall analytical results were then used to discriminate between different localities using chemometric techniques. The relative amounts of elements, particularly of Si, Ca, and Fe, varied between size fractions and between different locations for the same size fraction. By analysing individual small particles, many other constituents were identified including Ti, Cr, Mn, Ni, Cu, Zn, Ba, Ag, W, Au, Hg, Pb, Bi, La and Ce. The heavy metals were mostly concentrated in small particles in the smaller size fractions, which allowed detection by particle analysis, though their average concentrations were very low.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Human computer interaction and interaction design have recognised the need for participatory methods of co-design to contribute to designing human-centred interfaces, systems and services. Design thinking has recently developed as a set of strategies for human-centred co-design in product innovation, management and organisational transformation. Both developments place the designer in a new mediator role, requiring new skills than previously evident. This paper presents preliminary findings from a PhD case study of strategy and innovation consultancy Second Road to discuss these emerging roles of design lead, facilitator, teacher and director in action.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On 22 October 2012, the Australian Federal Government announced the removal of the $1,000 in-house fringe benefits concession when used as part of a salary packaging arrangement. At the time of the announcement, the Federal Government predicted that the removal of the concession would contribute additional tax revenue of $445 million over the following four years as well as an increase of GST payments to the States and Territories. However, anecdotal evidence at the same time indicated that the Australian employer response was to immediately stop providing employees with such in-house fringe benefits via salary sacrificing arrangements. Data presented in this article, collected from a combination of interviews with tax managers of four Australian entities as well as a review of the published archival data, confirms that the abolition of the $1,000 in-house fringe benefits concession was perceived as a negative change, whereby employees were considered the ‘big losers’ despite assertions by the Federal Government to the contrary. Using a conceptual map of tax rule change developed by Oats and Sadler, this article seeks to understand the reasons for this fringe benefits tax change and taxpayer response. In particular, the economic and political factors, and the responses of the relevant taxpayers (employers) are explored. Drawing on behavioural economic concepts, the actions, attitudes and response of employers to the rule change are also examined. The research findings suggest that the decision by Australian employers to cease providing the in-house fringe benefits as part of a salary-packaging arrangement after the legislative amendment was impacted by more than simple rational behaviour.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Road and highway infrastructure provides the backbone for a nation’s economic growth. The versatile dispersion of population in Australia and its resource boom, coupled with improved living standards and growing societal expectations, calls for continuing development and improvement of road infrastructure under the current local, state and federal governments’ policies and strategic plans. As road infrastructure projects involve huge resources and mechanisms, achieving sustainability not only on economic scales but also through environmental and social responsibility becomes a crucial issue. While sustainability is a logical link to infrastructure development, literature study and consultation with the industry found that there is a lack of common understanding on what constitutes sustainability in the infrastructure context. Its priorities are often interpreted differently among multiple stakeholders. For road infrastructure projects which typically span over long periods of time, achieving tangible sustainability outcomes during the lifecycle of development remains a formidable task. Sustainable development initiatives often remain ideological as in macro-level policies and broad-based concepts. There were little elaboration and exemplar cases on how these policies and concepts can be translated into practical decision-making during project implementation. In contrast, there seemed to be over commitment on research and development of sustainability assessment methods and tools. Between the two positions, there is a perception-reality gap and mismatch, specifically on how to enhance sustainability deliverables during infrastructure project delivery. Review on past research in this industry sector also found that little has been done to promote sustainable road infrastructure development; this has wide and varied potential impacts. This research identified the common perceptions and expectations by different stakeholders towards achieving sustainability in road and highway infrastructure projects. Face to face interviews on selected representatives of these stakeholders were carried out in order to select and categorize, confirm and prioritize a list of sustainability performance targets identified through literature and past research. A Delphi study was conducted with the assistance of a panel of senior industry professionals and academic experts, which further considered the interrelationship and influence of the sustainability indicators, and identified critical sustainability indicators under ten critical sustainability criteria (e.g. Environmental, Health & Safety, Resource Utilization & Management, Social & Cultural, Economic, Public Governance & Community Engagement, Relations Management, Engineering, Institutional and Project Management). This presented critical sustainability issues that needed to be addressed at the project level. Accordingly, exemplar highway development projects were used as case studies to elicit solutions for the critical issues. Through the identification and integration of different perceptions and priority needs of the stakeholders, as well as key sustainability indicators and solutions for critical issues, a set of decision-making guidelines was developed to promote and drive consistent sustainability deliverables in road infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the rapid urbanization progress, water resources protection and water pollution control have become key problems of human environment construction and social sustainable development. Many countries, especially Australia, have mature experiences. Water Sensitive Urban Design (WSUD) is one of the successful strategies that is put forward under this global situation and helps releasing heavy environmental pressure from urbanization. The paper discussed main principles of WSUD and then took Shijiazhuang, Heibei and Yueng, Hunan for examples trying to apply WSUD in river landscape projects in China's new urban area, thus doing contributions to more sustainable water management in new urban areas in China.