Resumo:
Structural health monitoring has been accepted as a justified effort for long-span bridges, which are critical to a region's economic vitality. As the most heavily instrumented bridge project in the world, WASHMS - Wind And Structural Health Monitoring System has been developed and installed on the cable-supported bridges in Hong Kong (Wong and Ni 2009a). This chapter aims to share some of the experience gained through the operations and studies on the application of WASHMS. It is concluded that Structural Health Monitoring should be composed of two main components: Structural Performance Monitoring (SPM) and Structural Safety Evaluation (SSE). As an example to illustrate how the WASHMS could be used for structural performance monitoring, the layout of the sensory system installed on the Tsing Ma Bridge is briefly described. To demonstrate the two broad approaches of structural safety evaluation - Structural Health Assessment and Damage Detection, three examples in the application of SHM information are presented. These three examples can be considered as pioneer works for the research and development of the structural diagnosis and prognosis tools required by the structural health monitoring for monitoring and evaluation applications.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
The Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 mandated the consideration of safety in the regional transportation planning process. As part of National Cooperative Highway Research Program Project 8-44, "Incorporating Safety into the Transportation Planning Process," we conducted a telephone survey to assess safety-related activities and expertise at Governors Highway Safety Associations (GHSAs), and GHSA relationships with metropolitan planning organizations (MPOs) and state departments of transportation (DOTs). The survey results were combined with statewide crash data to enable exploratory modeling of the relationship between GHSA policies and programs and statewide safety. The modeling objective was to illuminate current hurdles to ISTEA implementation, so that appropriate institutional, analytical, and personnel improvements can be made. The study revealed that coordination of transportation safety across DOTs, MPOs, GHSAs, and departments of public safety is generally beneficial to the implementation of safety. In addition, better coordination is characterized by more positive and constructive attitudes toward incorporating safety into planning.
Resumo:
There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.
Resumo:
Bridges are valuable assets of every nation. They deteriorate with age and often are subjected to additional loads or different load patterns than originally designed for. These changes in loads can cause localized distress and may result in bridge failure if not corrected in time. Early detection of damage and appropriate retrofitting will aid in preventing bridge failures. Large amounts of money are spent in bridge maintenance all around the world. A need exists for a reliable technology capable of monitoring the structural health of bridges, thereby ensuring they operate safely and efficiently during the whole intended lives. Monitoring of bridges has been traditionally done by means of visual inspection. Visual inspection alone is not capable of locating and identifying all signs of damage, hence a variety of structural health monitoring (SHM) techniques is used regularly nowadays to monitor performance and to assess condition of bridges for early damage detection. Acoustic emission (AE) is one technique that is finding an increasing use in SHM applications of bridges all around the world. The chapter starts with a brief introduction to structural health monitoring and techniques commonly used for monitoring purposes. Acoustic emission technique, wave nature of AE phenomenon, previous applications and limitations and challenges in the use as a SHM technique are also discussed. Scope of the project and work carried out will be explained, followed by some recommendations of work planned in future.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
Management of change in construction organisations to capture internal knowledge and maximise innovation is central to construction process re-engineering. Recent international trends toward privatisation and outsourcing of many government functions has seen wholesale changes to the role of government departments. In Brisbane, Australia, the Port of Brisbane Corporation has responsibilities for development and maintenance of all port and harbour facilities in the Brisbane region. The PBC is an acknowledged leader in encouraging internal technical development. Yet 20 years ago, this organisation operated as a small division within a large and bureaucratic Queensland Government public service department. This paper reviews construction project procurement strategies for the port’s civil and structural facilities since a separate organisational entity with responsibilities for Port of Brisbane was formed in 1976. The Port of Brisbane Corporation serves as an initial case study setting for a larger research project studying innovative practices in the context of the trend towards corporatising and privatising public sector organisations.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
There has recently been noted a rapid increase in research attention to projects that involve outside partners. Our knowledge of such inter-organizational projects, however, is limited. This paper reports large scale data from a repeated trend survey amongst 2000 SMEs in 2006 and 2009 that focused on inter-organizational project ventures. Our major findings indicate that the overall prevalence of inter-organizational project ventures remained significant and stable over time, even despite the economic crisis. Moreover, we find that these ventures predominantly solve repetitive rather than unique tasks and are embedded in prior relations between the partnering organizations. These findings provide empirical support for the recent claims that project management should pay more attention to inter-organizational forms of project organization, and suggest that the archetypical view of projects as being unique in every respect should be reconsidered. Both have important implications for project management, especially in the area of project-based learning.
Resumo:
Managing project-based learning is becoming an increasingly important part of project management. This article presents a comparative case study of 12 cases of knowledge transfer between temporary inter-organizational projects and permanent parent organizations. Our set-theoretic analysis of these data yields two major findings. First, a high level of absorptive capacity of the project owner is a necessary condition for successful project knowledge transfer, which implies that the responsibility for knowledge transfer seems to in the first place lie with the project parent organization, not with the project manager. Second, none of the factors are sufficient by themselves. This implies that successful project knowledge transfer is a complex process always involving configurations of multiple factors. We link these implications with the view of projects as complex temporary organizational forms in which successful project managers need to cope with complexity by simultaneously paying attention to both relational and organizational processes.
Resumo:
Background: Patient privacy and confidentiality (PPaC) is an important consideration for nurses and other members of the health care team. Can a patient expect to have confidentiality and in particular privacy in the current climate of emergency health care? Do staff who work in the Emergency Department (ED) see confidentiality as an important factor when providing emergency care? These questions are important to consider. Methods: This is a two phased quality improvement project, developed and implemented over a six month period in a busy regional, tertiary referral ED. Results: Issues identified for this department included department design and layout, overcrowding due to patient flow and access block, staff practices and department policies which were also impacted upon by culture of the team, and use of space. Conclusions: Changes successful in improving this issue include increased staff awareness about PPaC, intercom paging prior to nursing handover to remove visitors during handover, one visitor per patient policy, designated places for handover, allocated bed space for patient reviews/assessment and a strategy to temporarily move the patient if procedures would have been undertaken in shared bed space. These are important issues when considering policy, practice and department design in the ED.
Resumo:
With the growing significance of services in most developed economies, there is an increased interest in the role of service innovation in service firm competitive strategy. Despite growing literature on service innovation, it remains fragmented reflecting the need for a model that captures key antecedents driving the service innovation-based competitive advantage process. Building on extant literature and using thirteen in-depth interviews with CEOs of project-oriented service firms, this paper presents a model of innovation-based competitive advantage. The emergent model suggests that entrepreneurial service firms pursuing innovation carefully select and use dynamic capabilities that enable them to achieve greater innovation and sustained competitive advantage. Our findings indicate that firms purposefully use create, extend and modify processes to build and nurture key dynamic capabilities. The paper presents a set of theoretical propositions to guide future research. Implications for theory and practice are discussed. Finally, directions for future research are outlined.
Resumo:
In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’
Resumo:
The paper introduces the underlying principles and the general features of a meta-method (MAP method) developed as part of and used in various research, education and professional development programmes at ESC Lille. This method aims at providing effective and efficient structure and process for acting and learning in various complex, uncertain and ambiguous managerial situations (projects, programmes, portfolios). The paper is developed around three main parts. First, I suggest revisiting the dominant vision of the project management knowledge field, based on the assumptions they are not addressing adequately current business and management contexts and situations, and that competencies in management of entrepreneurial activities are the sources of creation of value for organisations. Then, grounded on the former developments, I introduce the underlying concepts supporting MAP method seen as a ‘convention generator’ and how this meta method inextricably links learning and practice in addressing managerial situations. Finally, I briefly describe an example of application, illustrating with a case study how the method integrates Project Management Governance, and give few examples of use in Management Education and Professional Development.
Resumo:
The purpose of this study is to understand the constructs of work motivation in project-based organizations. We first juxtapose work motivation in traditional and project-based organizations to put forward an operational definition of work motivation for our study. We then present the research methodology where we profile work motivation as perceived by project workers using principal component analysis. We obtain a five factor structure of work motivation. Finally, we discuss these results by putting them within the project management perspective and suggest managerial implications.