132 resultados para Psychological factors, psychological work, football performance.
Resumo:
The increasing linguistic and cultural diversity of our contemporary world points to the salience of maintaining and developing Heritage Language of ethnic minority groups. The mutually constitutive effect between Heritage Language learning and ethnic identity construction has been well documented in the literature. Classical social psychological work often quantitatively structures this phenomenon in a predictable linear relationship. In contrast, poststructural scholarship draws on qualitative approaches to claim the malleable and multiple dynamics behind the phenomenon. The two schools oppose but complement each other. Nevertheless, both schools struggle to capture the detailed and nuanced construction of ethnic identity through Heritage Language learning. Different from the extant research, we make an attempt to ethno-methodologically unearth the nuisances and predicaments embedded in the reflexive, subtle, and multi-layered identity constructions through nuanced, inter-nested language practices. Drawing on data from the qualitative phase of a large project, we highlight some small but powerful moments abstracted from the interview accounts of five Chinese Australian young people. Firstly, we zoom in on the life politics behind the ‘seen but unnoticed’ stereotype that looking Chinese means being able to speak Chinese. Secondly, we speculate the power relations between the speaker and the listener through the momentary and inadvertent breaches of the taken-for-granted stereotype. Next, we unveil how learning Chinese has become an accountably rational priority for these young Chinese Australians. Finally, we argue that the normalised stereotype becomes visible and hence stable when it is breached – a practical accomplishment that we term ‘habitus realisation’.
Resumo:
The impairing effect from sleepiness is a major contributor to road crashes. The ability of a sleepy driver to perceive their level of sleepiness is an important consideration for road safety as well as the type of sleepiness countermeasure used by drivers as some sleepiness countermeasures are more effective than others. The aims of the current study were to determine the extent that the signs of driver sleepiness were associated with sleepy driving behaviours, as well as determining which individual factors (demographic, work, driving, and sleep-related factors) were associated with using a roadside or in-vehicle sleepiness countermeasure. A sample of 1518 Australian drivers from the Australian State of New South Wales and the neighbouring Australian Capital Territory took part in the study. The participants’ experiences with the signs of sleepiness were reasonably extensive. A number of the early signs of sleepiness (e.g., yawning, frequent eye blinks) were related with continuing to drive while sleepy, with the more advanced signs of sleepiness (e.g., difficulty keeping eyes open, dreamlike state of consciousness) associated with having a sleep-related close call. The individual factors associated with using a roadside sleepiness countermeasure included age (being older), education (tertiary level), difficulties getting to sleep, not continuing to drive while sleepy, and having experienced many signs of sleepiness. The results suggest that these participants have a reasonable awareness and experience with the signs of driver sleepiness. Factors related to previous experiences with sleepiness were associated with implementing a roadside countermeasure. Nonetheless, the high proportions of drivers performing sleepy driving behaviours, suggest that concerted efforts are needed with road safety campaigns regarding the dangers of driving while sleepy.
Resumo:
Background Few studies have been undertaken to understand the employment impact in patients with colorectal cancer and none in middle-aged individuals with cancer. This study described transitions in, and key factors influencing, work participation during the 12 months following a diagnosis of colorectal cancer. Methods We enrolled 239 adults during 2010 and 2011who were employed at the time of their colorectal cancer diagnosis and were prospectively followed over 12 months. They were compared to an age- and gender-matched general population group of 717 adults from the Household, Income and Labour Dynamics in Australia (HILDA) Survey. Data were collected using telephone and postal surveys. Primary outcomes included work participation at 12 months, changes in hours worked and time to work re-entry. Multivariable logistic and Cox proportional hazards models were undertaken. Results A significantly higher proportion of participants with colorectal cancer (27%) had stopped working at 12 months than participants from the comparison group (8%) (p < 0.001). Participants with cancer who returned to work took a median of 91 days off work (25–75 percentiles: 14–183 days). For participants with cancer, predictors of not working at 12 months included: being older, lower BMI and lower physical well-being. Factors related to delayed work re-entry included not being university-educated, working for an employer with more than 20 employees in a non-professional or managerial role, longer hospital stay, poorer perceived financial status and having or had chemotherapy. Conclusions In middle-adulthood, those working and diagnosed with colorectal cancer can expect to take around three months off work. Individuals treated with chemotherapy, without a university degree and from large employers could be targeted for specific assistance for a more timely work entry.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
The current epidemic of paediatric obesity is consistent with a myriad of health-related comorbid conditions. Despite the higher prevalence of orthopaedic conditions in overweight children, a paucity of published research has considered the influence of these conditions on the ability to undertake physical activity. As physical activity participation is directly related to improvements in physical fitness, skeletal health and metabolic conditions, higher levels of physical activity are encouraged, and exercise is commonly prescribed in the treatment and management of childhood obesity. However, research has not correlated orthopaedic conditions, including the increased joint pain and discomfort that is commonly reported by overweight children, with decreases in physical activity. Research has confirmed that overweight children typically display a slower, more tentative walking pattern with increased forces to the hip, knee and ankle during 'normal' gait. This research, combined with anthropometric data indicating a higher prevalence of musculoskeletal malalignment in overweight children, suggests that such individuals are poorly equipped to undertake certain forms of physical activity. Concomitant increases in obesity and decreases in physical activity level strongly support the need to better understand the musculoskeletal factors associated with the performance of motor tasks by overweight and obese children.
Resumo:
With daily commercial and social activity in cities, regulation of train service in mass rapid transit railways is necessary to maintain service and passenger flow. Dwell-time adjustment at stations is one commonly used approach to regulation of train service, but its control space is very limited. Coasting control is a viable means of meeting the specific run-time in an inter-station run. The current practice is to start coasting at a fixed distance from the departed station. Hence, it is only optimal with respect to a nominal operational condition of the train schedule, but not the current service demand. The advantage of coasting can only be fully secured when coasting points are determined in real-time. However, identifying the necessary starting point(s) for coasting under the constraints of current service conditions is no simple task as train movement is governed by a large number of factors. The feasibility and performance of classical and heuristic searching measures in locating coasting point(s) is studied with the aid of a single train simulator, according to specified inter-station run times.
Resumo:
Statistics presented in Australia Council reports such as Don’t Give Up Your Day Job (2003), and Artswork: A Report On Australians Working in the Arts 1 and 2 (1997, 2005), and in other studies on destinations for Performing Arts graduates, demonstrate the diversity of post-graduation pathways for our students, the prevalence of protean careers, and the challenges in developing a sense of professional identity in a context where a portfolio of work across performance making, producing, administration and teaching can make it difficult for young artists to establish career status and capital in conventional terms (cf. Dawn Bennett, “Academy and the Real World: Developing Realistic Notions of Career in the Performing Arts”, Arts & Humanities in Higher Education, 8.3, 2009). In this panel, academics from around Australia will consider the ways in which Drama, Theatre and Performance Studies as a discipline is deploying a variety of practical, professional and work-integrated teaching and learning activities – including performance-making projects, industry projects, industry placements and student-initiated projects – to connect students with the networks, industries and professional pathways that will support their progression into their career. The panellists include Bree Hadley (Queensland University of Technology), Meredith Rogers (La Trobe University), Janys Hayes (Woolongong University) and Teresa Izzard (Curtin University). The panelists will present insights into the activities they have found successful, and address a range of questions, including: How do we introduce students to performance-making and / or producing models they will be able to employ in their future practice, particularly in light of the increasingly limited funds, time and resources available to support students’ participation in full-scale productions under the stewardship of professional artists?; How and when do we introduce students to industry networks?; How do we cater for graduates who will work as performers, writers, directors or administrators in the non-subsidised sector, the subsidised sector, community arts and education?; How do we category cater for graduates who will go on to pursue their work in a practice-as-research context in a Higher Degree?; How do we assist graduates in developing a professional identity? How do we assist graduates in developing physical, professional and personal resilience?; How do we retain our connections with graduates as part of their life-long learning?; Do practices and processes need to differ for city or regionally based / theoretically or practically based degree programs?; How do our teaching and learning activities align with emergent policy and industrial frameworks such as the shift to the “Producer Model” in Performing Arts funding, or the new mentorship, project, production and enterprise development opportunities under the Australia Council for the Arts’ new Opportunities for Young and Emerging Artists policy framework?
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
Students are often time poor and find it difficult to manage their time in relation to study and other external factors including work. Online study is no exception to this and in many cases where the student is studying in an online only environment, they are also working in full time employment. Higher Education institutions are now offering an abundance of courses online to attract more under-graduate and post-graduate students. It is in this sense that there is an ever-increasing need to understand the student of today and find ways to connect with them and support them in their studies. This paper will report on a small-scale case study of an undergraduate online-only group of first year education students and their associated online experiences in developing a sense of community whilst interacting with a learning management system and its associated tools. Further the paper will explore the mis-conceptions that are widely held by course designers and lecturers involved with online courses.
Resumo:
Baron von Richthofen (the Red Baron) arguably the most famous fighter pilot of all time painted his plane the vividest of red hues, making it visible and identifiable at great distance, showing an aggressive pronouncement of dominance to other pilots. Can colour affect aggression and performance and if so is it observable within team sports? This study explores the effect of red on sporting performances within a team sports arena, through empirical analysis of match results from the Australian Rugby League spanning a period of 30 years. Both the descriptive analysis and the multivariate analysis report a positive relationship. Nevertheless, more evidence is required to better understand whether teams in red do enjoy greater success controlling explicitly in a multivariate analysis for many factors that simultaneously affect performance.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
A review of the 6th APT focusing on the work and performance of Rohan Wealleans
Resumo:
Transition zones between bridge decks and rail tracks suffer early failure due to poor interaction between rail vehicles and sudden changes of stiffness. This has been an ongoing problem to rail industry and yet still no systematic studies appear to have been taken to maintain a gradually smoothening transmission of forces between the bridge and its approach. Differential settlement between the bridge deck and rail track in the transition zone is the fundamental issue, which negatively impacts the rail industry by causing passenger discomfort, early damage to infrastructure and vehicle components, speed reduction, and frequent maintenance cycles. Identification of mechanism of the track degradation and factors affecting is imperative to design any mitigation method for reducing track degradation rate at the bridge transition zone. Unfortunately this issue is still not well understood, after conducting a numbers of reviews to evaluate the key causes, and introducing a wide range of mitigation techniques. In this study, a comprehensive analysis of the available literature has been carried out to develop either a novel design framework or a mitigation technique for the bridge transition zone. This paper addresses three critical questions in relation to the track degradation at transition zone: (1) what are the causes of bridge transition track degradation?; (2) what are the available mitigation techniques in reducing the track degradation rate?; (3) what are the factors affecting on poor performance of the existing mitigation techniques?. It is found that the absence of soil-water response, dynamic loading response, and behaviour of geotechnical characteristics under long-term conditions in existing track transition design frameworks critically influence on the failures of existing mitigation techniques. This paper also evaluates some of the existing design frameworks to identify how each design framework addresses the track degradation at the bridge transition zone.