341 resultados para Free cash flow


Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper formulates an analytically tractable problem for the wake generated by a long flat bottom ship by considering the steady free surface flow of an inviscid, incompressible fluid emerging from beneath a semi-infinite rigid plate. The flow is considered to be irrotational and two-dimensional so that classical potential flow methods can be exploited. In addition, it is assumed that the draft of the plate is small compared to the depth of the channel. The linearised problem is solved exactly using a Fourier transform and the Wiener-Hopf technique, and it is shown that there is a family of subcritical solutions characterised by a train of sinusoidal waves on the downstream free surface. The amplitude of these waves decreases as the Froude number increases. Supercritical solutions are also obtained, but, in general, these have infinite vertical velocities at the trailing edge of the plate. Consideration of further terms in the expansions suggests a way of canceling the singularity for certain values of the Froude number.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The free surface flow of a finite depth fluid past a semi-infinite body is considered. The fluid is assumed to have constant vorticity throughout and the free surface is assumed to attach smoothly to the front face of the body. Numerical solutions are found using a boundary integral method in the physical plane and it is shown that solutions exist for all supercritical Froude numbers. The related problem of the cusp-like flow due to a submerged sink in a corner is also considered. Vorticity is included in the flow and it is shown that the behaviour of the solutions is qualitatively the same as that found in the problem described above.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Designed for independent living, retirement villages provide either detached or semi-detached residential dwellings with car parking and small private yards. Retirement village developments usually include a mix of independent living units (ILUs) and serviced apartments (SAs) with community facilities providing a shared congregational area for village activities and socialising. Retirement Village assets differ from traditional residential assets due to their operation in accordance with statutory legislation. In Australia, each State and Territory has its own Retirement Village Act and Regulations. In essence, the village operator provides the land and buildings to the residents who pay an amount on entry for the right of occupation. On departure from the units an agreed proportion of either the original purchase price or the sale price is paid to the outgoing resident. The market value of the operator’s interest in the Retirement Village is therefore based upon the estimated future income from Deferred Management Fees and Capital Gain upon roll-over receivable by the operator in accordance with the respective residency agreements. Given the lumpiness of these payments, there is general acceptance that the most appropriate approach to valuation is through Discounted Cash Flow (DCF) analysis. There is however inconsistency between valuers across Australia in how they undertake their DCF analysis, leading to differences in reported values and subsequent confusion among users of valuation services. To give guidance to valuers and enhance confidence from users of valuation services this paper investigates the five major elements of discounted cash flow methodology, namely cash flows, escalation factors, holding period, terminal value and discount rate. Whilst there is dissatisfaction with the financial structuring of the DMF in residency agreements, as long as there are future financial returns receivable by the Village owner/operator, then DCF will continue to be the most appropriate valuation methodology for resident funded retirement villages.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Retirement village assets are different from traditional residential assets due to their operation in accordance with statutory legislation. Designed for independent living, retirement villages provide either detached or semi-detached residential dwellings with car parking and small private yards with community facilities providing a shared congregational area for village activities and socialising. In essence, the village operator provides the land and buildings to the residents who pay an amount on entry for the right of occupation. On departure from the units an agreed proportion of either the original purchase price or the sale price is paid to the outgoing resident. As ongoing levies are typically offset by ongoing operational expenses the market value of the operator's interest in the retirement village is therefore predominantly based upon the estimated future income from deferred management fees and capital gain upon roll-over receivable by the operator in accordance with the respective residency agreements. Given the lumpiness of these payments, there is general acceptance that the most appropriate approach to valuation is through discounted cash flow (DCF) analysis. There is however inconsistency between valuers across Australia in how they undertake their DCF analysis, leading to differences in reported values and subsequent confusion among users of valuation services. To give guidance to valuers and enhance confidence from users of valuation services this paper investigates the five major elements of DCF methodology, namely cash flows, escalation factors, holding period, terminal value and discount rate.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper investigates the factors that drive high levels of corporate sustainability performance (CSP), as proxied by membership of the Dow Jones Sustainability World Index. Using a stakeholder framework, we examine the incentives for US firms to invest in sustainability principles and develop a number of hypotheses that relate CSP to firm-specific characteristics. Our results indicate that leading CSP firms are significantly larger, have higher levels of growth and a higher return on equity than conventional firms. Contrary to our predictions, leading CSP firms do not have greater free cash flows or lower leverage than other firms.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The study of venture idea characteristics and the contextual fit between venture ideas and individuals are key research goals in entrepreneurship (Davidsson, 2004). However, to date there has been limited scholarly attention given to these phenomena. Accordingly, this study aims to help fill the gap by investigating the importance of novelty and relatedness of venture ideas in entrepreneurial firms. On the premise that new venture creation is a process and that research should be focused on the early stages of the venturing process, this study primarily focuses its attention on examining how venture idea novelty and relatedness affect the performance in the venture creation process. Different types and degrees of novelty are considered here. Relatedness is shown to be based on individuals’ prior knowledge and resource endowment. Performance in the venture creation process is evaluated according to four possible outcomes: making progress, getting operational, being terminated and achieving positive cash flow. A theoretical model is developed demonstrating the relationship between these variables along with the investment of time and money. Several hypotheses are developed to be tested. Among them, it is hypothesised that novelty hinders short term performance in the venture creation process. On the other hand knowledge and resource relatedness are hypothesised to promote performance. An experimental study was required in order to understand how different types and degrees of novelty and relatedness of venture ideas affect the attractiveness of venture ideas in the eyes of experienced entrepreneurs. Thus, the empirical work in this thesis was based on two separate studies. In the first one, a conjoint analysis experiment was conducted on 32 experienced entrepreneurs in order to ascertain attitudinal preferences regarding venture idea attractiveness based on novelty, relatedness and potential financial gains. This helped to estimate utility values for different levels of different attributes of venture ideas and their relative importance in the attractiveness. The second study was a longitudinal investigation of how venture idea novelty and relatedness affect the performance in the venture creation process. The data for this study is from the Comprehensive Australian Study for Entrepreneurial Emergence (CAUSEE) project that has been established in order to explore the new venture creation process in Australia. CAUSEE collects data from a representative sample of over 30,000 households in Australia using random digit dialling (RDD) telephone interviews. From these cases, data was collected at two points in time during a 12 month period from 493 firms, who are currently involved in the start-up process. Hypotheses were tested and inferences were derived through descriptive statistics, confirmatory factor analysis and structural equation modelling. Results of study 1 indicate that venture idea characteristics have a role in the attractiveness and entrepreneurs prefer to introduce a moderate degree of novelty across all types of venture ideas concerned. Knowledge relatedness is demonstrated to be a more significant factor in attractiveness than resource relatedness. Results of study 2 show that the novelty hinders nascent venture performance. On the other hand, resource relatedness has a positive impact on performance unlike knowledge relatedness which has none. The results of these studies have important implications for potential entrepreneurs, investors, researchers, consultants etc. by developing a better understanding in the venture creation process and its success factors in terms of both theory and practice.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Bagasse stockpile operations have the potential to lead to adverse environmental and social impacts. Dust releases can cause occupational health and safety concerns for factory workers and dust emissions impact on the surrounding community. Preliminary modelling showed that bagasse depithing would likely reduce the environmental risks, particularly dust emissions, associated with large scale bagasse stockpiling operations. Dust emission properties were measured and used for dispersion modelling with favourable outcomes. Modelling showed a 70% reduction in peak ground level concentrations of PM10 dust (particles with an aerodynamic diameter less than 10 µm) from operations on depithed bagasse stockpiles compared to similar operations on stockpiles of whole bagasse. However, the costs of a depithing operation at a sugar factory were estimated to be approximately $2.1 million in capital expenditure to process 100,000 t/y of bagasse and operating costs were approximately $200,000 p.a. The total capital cost for a 10,000 t/y operation was approximately $1.6 million. The cost of depithing based on a discounted cash flow analysis was $5.50 per tonne of bagasse for the 100,000 t/y scenario. This may make depithing prohibitively expensive in many situations if installed exclusively as a dust control measure.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper examines the case of a procurement auction for a single project, in which the breakdown of the winning bid into its component items determines the value of payments subsequently made to bidder as the work progresses. Unbalanced bidding, or bid skewing, involves the uneven distribution of mark-up among the component items in such a way as to attempt to derive increased benefit to the unbalancer but without involving any change in the total bid. One form of unbalanced bidding for example, termed Front Loading (FL), is thought to be widespread in practice. This involves overpricing the work items that occur early in the project and underpricing the work items that occur later in the project in order to enhance the bidder's cash flow. Naturally, auctioners attempt to protect themselves from the effects of unbalancing—typically reserving the right to reject a bid that has been detected as unbalanced. As a result, models have been developed to both unbalance bids and detect unbalanced bids but virtually nothing is known of their use, success or otherwise. This is of particular concern for the detection methods as, without testing, there is no way of knowing the extent to which unbalanced bids are remaining undetected or balanced bids are being falsely detected as unbalanced. This paper reports on a simulation study aimed at demonstrating the likely effects of unbalanced bid detection models in a deterministic environment involving FL unbalancing in a Texas DOT detection setting, in which bids are deemed to be unbalanced if an item exceeds a maximum (or fails to reach a minimum) ‘cut-off’ value determined by the Texas method. A proportion of bids are automatically and maximally unbalanced over a long series of simulated contract projects and the profits and detection rates of both the balancers and unbalancers are compared. The results show that, as expected, the balanced bids are often incorrectly detected as unbalanced, with the rate of (mis)detection increasing with the proportion of FL bidders in the auction. It is also shown that, while the profit for balanced bidders remains the same irrespective of the number of FL bidders involved, the FL bidder's profit increases with the greater proportion of FL bidders present in the auction. Sensitivity tests show the results to be generally robust, with (mis)detection rates increasing further when there are fewer bidders in the auction and when more data are averaged to determine the baseline value, but being smaller or larger with increased cut-off values and increased cost and estimate variability depending on the number of FL bidders involved. The FL bidder's expected benefit from unbalancing, on the other hand, increases, when there are fewer bidders in the auction. It also increases when the cut-off rate and discount rate is increased, when there is less variability in the costs and their estimates, and when less data are used in setting the baseline values.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Many Australian families are unable to access homeownership. This is because house prices are very high to the severely or seriously unaffordable level. Therefore, many low income families will need to rely on affordable rental housing supply. The Australian governments introduced National Rental Affordability Scheme (NRAS) in July 2008. The scheme aims to increase the supply of affordable rental housing by 50,000 dwellings across Australia by June 2014. It provides financial incentive for investors to purchase new affordable housing that must be rented at a minimum of 20% below the market rent. The scheme has been in place for four years to June 2012. There are debates on the success or failure of the scheme. One argues that the scheme is more successful in Queensland but it failed to meet its aims in NSW. This paper examines NRAS incentive designed to encourage affordable housing supply in Australia and demonstrates reasons for developing properties that are crowded in areas where the land prices are relatively lower in the NSW using a discounted cash flow analysis in a hypothetical case study. The findings suggest that the high land values and the increasing cost of development were the main constraints of implementing the scheme in the NSW and government should not provide a flat rate subsidy which is inadequate to ensure that affordable housing projects in high cost areas.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study explores the accuracy and valuation implications of the application of a comprehensive list of equity multiples in the takeover context. Motivating the study is the prevalent use of equity multiples in practice, the observed long-run underperformance of acquirers following takeovers, and the scarcity of multiplesbased research in the merger and acquisition setting. In exploring the application of equity multiples in this context three research questions are addressed: (1) how accurate are equity multiples (RQ1); which equity multiples are more accurate in valuing the firm (RQ2); and which equity multiples are associated with greater misvaluation of the firm (RQ3). Following a comprehensive review of the extant multiples-based literature it is hypothesised that the accuracy of multiples in estimating stock market prices in the takeover context will rank as follows (from best to worst): (1) forecasted earnings multiples, (2) multiples closer to bottom line earnings, (3) multiples based on Net Cash Flow from Operations (NCFO) and trading revenue. The relative inaccuracies in multiples are expected to flow through to equity misvaluation (as measured by the ratio of estimated market capitalisation to residual income value, or P/V). Accordingly, it is hypothesised that greater overvaluation will be exhibited for multiples based on Trading Revenue, NCFO, Book Value (BV) and earnings before interest, tax, depreciation and amortisation (EBITDA) versus multiples based on bottom line earnings; and that multiples based on Intrinsic Value will display the least overvaluation. The hypotheses are tested using a sample of 147 acquirers and 129 targets involved in Australian takeover transactions announced between 1990 and 2005. The results show that first, the majority of computed multiples examined exhibit valuation errors within 30 percent of stock market values. Second, and consistent with expectations, the results provide support for the superiority of multiples based on forecasted earnings in valuing targets and acquirers engaged in takeover transactions. Although a gradual improvement in estimating stock market values is not entirely evident when moving down the Income Statement, historical earnings multiples perform better than multiples based on Trading Revenue or NCFO. Third, while multiples based on forecasted earnings have the highest valuation accuracy they, along with Trading Revenue multiples for targets, produce the most overvalued valuations for acquirers and targets. Consistent with predictions, greater overvaluation is exhibited for multiples based on Trading Revenue for targets, and NCFO and EBITDA for both acquirers and targets. Finally, as expected, multiples based Intrinsic Value (along with BV) are associated with the least overvaluation. Given the widespread usage of valuation multiples in takeover contexts these findings offer a unique insight into their relative effectiveness. Importantly, the findings add to the growing body of valuation accuracy literature, especially within Australia, and should assist market participants to better understand the relative accuracy and misvaluation consequences of various equity multiples used in takeover documentation and assist them in subsequent investment decision making.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Bagasse stockpile operations have the potential to lead to adverse environmental and social impacts. Dust releases can cause occupational health and safety concerns for factory workers and dust emissions impact on the surrounding community. Preliminary modelling showed that bagasse depithing would likely reduce the environmental risks, particularly dust emissions, associated with large-scale bagasse stockpiling operations. Dust emission properties were measured and used for dispersion modelling with favourable outcomes. Modelling showed a 70% reduction in peak ground level concentrations of PM10 dust (particles with an aerodynamic diameter less than 10 μm) from operations on depithed bagasse stockpiles compared to similar operations on stockpiles of whole bagasse. However, the costs of a depithing operation at a sugar factory were estimated to be approximately $2.1 million in capital expenditure to process 100 000 t/y of bagasse and operating costs were 200 000 p.a. The total capital cost for a 10 000 t/y operation was approximately $1.6 million. The cost of depithing based on a discounted cash flow analysis was $5.50 per tonne of bagasse for the 100 000 t/y scenario. This may make depithing prohibitively expensive in many situations if installed exclusively as a dust control measure.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

While the half-angle which encloses a Kelvin ship wave pattern is commonly accepted to be 19.47 degrees, recent observations and calculations for sufficiently fast-moving ships suggest that the apparent wake angle decreases with ship speed. One explanation for this decrease in angle relies on the assumption that a ship cannot generate wavelengths much greater than its hull length. An alternative interpretation is that the wave pattern that is observed in practice is defined by the location of the highest peaks; for wakes created by sufficiently fast-moving objects, these highest peaks no longer lie on the outermost divergent waves, resulting in a smaller apparent angle. In this paper, we focus on the problems of free surface flow past a single submerged point source and past a submerged source doublet. In the linear version of these problems, we measure the apparent wake angle formed by the highest peaks, and observe the following three regimes: a small Froude number pattern, in which the divergent waves are not visible; standard wave patterns for which the maximum peaks occur on the outermost divergent waves; and a third regime in which the highest peaks form a V-shape with an angle much less than the Kelvin angle. For nonlinear flows, we demonstrate that nonlinearity has the effect of increasing the apparent wake angle so that some highly nonlinear solutions have apparent wake angles that are greater than Kelvin's angle. For large Froude numbers, the effect on apparent wake angle can be more dramatic, with the possibility of strong nonlinearity shifting the wave pattern from the third regime to the second. We expect our nonlinear results will translate to other more complicated flow configurations, such as flow due to a steadily moving closed body such as a submarine.