265 resultados para Coupled-cluster methodology


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is an initial report of the PolyU SD part of the team to study Pre-fabricated Building Design and Construction Methodology and marks the completion of Phase 1. It follows our first notes prepared for the meeting on 2 February that identified some critical issues including future lifestyles, life expectancy of buildings, sustainability, size, flexibility and planning considerations. It is also an expansion of our presentation in Dongguan on 23 February. It is not a comprehensive survey of existing approaches or possible ways forward, but it has homed in on certain specific issues and does give specific examples to make the suggestions concrete. It is recommended that more comprehensive research be done to establish previous work and experience internationally. It is also recommended that more research be done on lifestyles as a preliminary to developing at least three concepts for evaluation before proceeding to the detailed design of one concept for full prototyping and market testing. The goal at this point is not to define a single direction but to suggest several future trajectories for further consideration. By the same token, this report is not intended as an exhaustive description of the considerable base of knowledge and ideas brought by the PolyU team to this exciting task. Before taking on an issue of this magnitude and importance in the definition of Hong Kong's future, one must carry out a thoughtful analysis of the issues at hand and an informed definition of paradigms, directions, goals and methods whereby our energies can be best used in the next steps. This report is the result of this analysis

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Zoonotic schistosomiasis japonica is a major public health problem in China. Bovines, particularly water buffaloes, are thought to play a major role in the transmission of schistosomiasis to humans in China. Preliminary results (1998–2003) of a praziquantel (PZQ)-based pilot intervention study we undertook provided proof of principle that water buffaloes are major reservoir hosts for S. japonicum in the Poyang Lake region, Jiangxi Province. Methods and Findings Here we present the results of a cluster-randomised intervention trial (2004–2007) undertaken in Hunan and Jiangxi Provinces, with increased power and more general applicability to the lake and marshlands regions of southern China. The trial involved four matched pairs of villages with one village within each pair randomly selected as a control (human PZQ treatment only), leaving the other as the intervention (human and bovine PZQ treatment). A sentinel cohort of people to be monitored for new infections for the duration of the study was selected from each village. Results showed that combined human and bovine chemotherapy with PZQ had a greater effect on human incidence than human PZQ treatment alone. Conclusions The results from this study, supported by previous experimental evidence, confirms that bovines are the major reservoir host of human schistosomiasis in the lake and marshland regions of southern China, and reinforce the rationale for the development and deployment of a transmission blocking anti-S. japonicum vaccine targeting bovines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper introduces the Corporate Culture Change Cycle: a continuous innovation methodology for transforming the psychological contract in an organisational context. The eight step process is based on the action learning model. The purpose of this methodology is to benchmark the psychological contract against eight changing values of the employment relationship as a basis for facilitating a process of aligning the changing needs of employer and employee. Both the Corporate Culture Change Cycle and the New Employment Relationship Model have been validated in several organisational settings and subsequently refined. This continuous innovation methodology addresses gaps in the psychological contract, change management and continuous innovation research literatures. The approach therefore should be of interest to researchers in these fields of study and from a practical perspective for managers wishing to transform their workplace cultures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper aims to develop the methodology and strategy for concurrent finite element modeling of civil infrastructures at the different scale levels for the purposes of analyses of structural deteriorating. The modeling strategy and method were investigated to develop the concurrent multi-scale model of structural behavior (CMSM-of-SB) in which the global structural behavior and nonlinear damage features of local details in a large complicated structure could be concurrently analyzed in order to meet the needs of structural-state evaluation as well as structural deteriorating. In the proposed method, the “large-scale” modeling is adopted for the global structure with linear responses between stress and strain and the “small-scale” modeling is available for nonlinear damage analyses of the local welded details. A longitudinal truss in steel bridge decks was selected as a case to study how a CMSM-of-SB was developed. The reduced-scale specimen of the longitudinal truss was studied in the laboratory to measure its dynamic and static behavior in global truss and local welded details, while the multi-scale models using constraint equations and substructuring were developed for numerical simulation. The comparison of dynamic and static response between the calculated results by different models indicated that the proposed multi-scale model was found to be the most efficient and accurate. The verification of the model with results from the tested truss under the specific loading showed that, responses at the material scale in the vicinity of local details as well as structural global behaviors could be obtained and fit well with the measured results. The proposed concurrent multi-scale modeling strategy and implementation procedures were applied to Runyang cable-stayed bridge (RYCB) and the CMSM-of-SB of the bridge deck system was accordingly constructed as a practical application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become problems that are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to problems of knowledge management in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes five case studies of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on the early stages of a design experiment in educational assessment that challenges the dichotomous legacy evident in many assessment activities. Combining social networking technologies with the sociology of education the paper proposes that assessment activities are best understood as a negotiable field of exchange. In this design experiment students, peers and experts engage in explicit, "front-end" assessment (Wyatt-Smith, 2008) to translate holistic judgments into institutional, and potentiality economic capital without adhering to long lists of pre-set criteria. This approach invites participants to use social networking technologies to judge creative works using scatter graphs, keywords and tag clouds. In doing so assessors will refine their evaluative expertise and negotiate the characteristics of creative works from which criteria will emerge (Sadler, 2008). The real-time advantages of web-based technologies will aggregate, externalise and democratise this transparent method of assessment for most, if not all, creative works that can be represented in a digital format.