680 resultados para Bridge Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Research Council (ARC) Innovative Products Project aims to facilitate project innovation by exploring means to improve the diffusion of innovative products to road and bridge projects. It adopts a highly novel approach to achieve this end, developing three different ways of viewing the problem: (1) as a relational governance issue, (2) as an absorptive capacity issue and (3) as a knowlege intermediation issue. This report presents teh results of teh first phase of a three phase fieldwork program.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is part of a major project with a stimulus that rose from the need to manage a large number of ageing bridges in low traffic volume roads (LTVR) in Australia. The project investigated, designed and consequently constructed, involved replacing an ageing super-structure of a 10m span bridge with a disused Flat-bed Rail Wagon (FRW). This research, therefore, is developed on the premises that the FRW can be adopted as the main structural system for the bridges in LTVR network. The main focus of this research is to present two alternate deck wearing systems (DWS) as part of the design of the FRW as road bridge deck conforming to AS5100 (2004). The bare FRW structural components were first examined for their adequacy (ultimate and serviceability) in resisting the critical loads specified in AS5100(2004). Two options of DWSs were evaluated and their effects on the FRW examined. The first option involved usage of timber DWS; the idea of this option was to use all the primary and secondary members of the FRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option involved usage of reinforced concrete DWS with only the primary members of the FRW sharing the AS5100 (2004) loading. This option inherently minimised the risk associated with any uncertainty of the secondary members to their structural adequacy. This thesis reports the design phases of both options with conclusions of the selection of the ideal option for better structural performance, ease of construction and cost. The comparison carried out here focuses on the distribution of the traffic load by the FRW as a superstructure. Advantages and disadvantages highlighting cost comparisons and ease of constructability of the two systems are also included.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reviews innovation activity in a key service industry – road and bridge construction. Based on a large-scale Australian survey and descriptive statistics, the paper finds that there is little difference in innovation levels between different types of industry participants and that innovation is difficult to implement. The survey gathered responses from suppliers, consultants, contracts and clients and compared results across these four industry sectors. The absorptive capacity and relationship capacities of respondents were also investigated. One in five respondents had poor absorptive capacity. Suppliers were found to the most effective learners and were the best adopters of ideas from outside their organisations and consultants were the least effective. Australian construction organisations have relatively good relationship skills because relationship-based contracts are common compared to other countries. Indeed, the survey found that nearly 60% of respondents had experience with such contracts, with clients having more experience than the other three sectors. The results have implications for the measurement of innovation in project-based industries, and the relative roles of clients and suppliers in driving innovation in the construction industry. Further research will examine the extent to which particular governance mechanisms within relationship contracts lead to improved innovation and project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is a work-in-progress that articulates my research journey based on the development of a curriculum innovation in environmental education. This journey had two distinct, but intertwined phases: action research based fieldwork, conducted collaboratively, to create a whole school approach to environmental education curriculum planning; and a phase of analysis and reflection based on the emerging findings, as I sought to create personal "living educational theory" about change and innovation. A key stimulus for the study was the perceived theory-practice gap in environmental education, which is often presented in the literature as a criticism of teachers for failing to achieve the values and action objectives of critical environmental education. Hence, many programs and projects are considered to be superficial and inconsequential in terms of their ability to seriously address environmental issues. The intention of this study was to work with teachers in a project that would be an exemplar of critical environmental education. This would be in the form of a whole school "learnscaping" curriculum in a primary school whereby the schoolgrounds would be utilised for interdisciplinary critical environment education. Parallel with the three cycles of action research in this project, my research objectives were to identify and comment upon the factors that influence the generation of successful educational innovation. It was anticipated that the project would be a collaboration involving me, as researcher-facilitator, and many of the teachers in the school as active participants. As the project proceeded through its action cycles, however, it became obvious that the goal of developing a critical environmental education curriculum, and the use of highly participatory processes, were unrealistic. Institutional and organisational rigidities in education generally, teachers' day-to-day work demands, and the constant juggle of work, family and other responsibilities for all participants acted as significant constraints. Consequently, it became apparent that the learnscaping curriculum would not be the hoped-for exemplar. Progress was slow and, at times, the project was in danger of stalling permanently. While the curriculum had some elements of critical environmental education, these were minor and not well spread throughout the school. Overall, the outcome seemed best described as a "small win"; perhaps just another example of the theory-practice gap that I had hoped this project would bridge. Towards the project's end, however, my continuing reflection led to an exploration of chaos/complexity theory which gave new meaning to the concept of a "small win". According to this theory, change is not the product of linear processes applied methodically in purposeful and diligent ways, but emerges from serendipitous events that cannot be planned for, or forecast in advance. When this perspective of change is applied to human organisations - in this study, a busy school - the context for change is recognised not as a stable, predictable environment, but as a highly complex system where change happens all the time, cannot be controlled, and no one can be really sure where the impacts might lead. This so-called "butterfly effect" is a central idea of this theory where small changes or modifications are created - the effects of which are difficult to know, let alone determine - and which can have large-scale impacts. Allied with this effect is the belief that long term developments in an organisation that takes complexity into account, emerge by spontaneous self-organising evolution, requiring political interaction and learning in groups, rather than systematic progress towards predetermined goals or "visions". Hence, because change itself and the contexts of change are recognised as complex, chaos/complexity theory suggests that change is more likely to be slow and evolutionary - cultural change - rather than fast and revolutionary where the old is quickly ushered out by radical reforms and replaced by new structures and processes. Slow, small-scale changes are "normal", from a complexity viewpoint, while rapid, wholesale change is both unlikely and unrealistic. Therefore, the frustratingly slow, small-scale, imperfect educational changes that teachers create - including environmental education initiatives - should be seen for what they really are. They should be recognised as successful changes, the impacts of which cannot be known, but which have the potential to magnify into large-scale changes into the future. Rather than being regarded as failures for not meeting critical education criteria, "small wins" should be cause for celebration and support. The intertwined phases of collaborative action research and individual researcher reflection are mirrored in the thesis structure. The first three chapters, respectively, provide the thesis overview, the literature underpinning the study's central concern, and the research methodology. Chapters 4, 5, and 6 report on each of the three action research cycles of the study, namely Laying the Groundwork, Down to Work!, and The Never-ending Story. Each of these chapters presents a narrative of events, a literature review specific to developments in the cycle, and analysis and critique of the events, processes and outcomes of each cycle. Chapter 7 provides a synthesis of the whole of the study, outlining my interim propositions about facilitating curriculum change in schools through action research, and the implications of these for environmental education.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis developed a condition assessment and rating method to identify those bridges in a network which are in most need of repair for an effective life cycle management. The method estimates the contribution of critical factors towards bridge deterioration and uses structural analysis to overcome the subjectivity of traditional current condition assessment methods. This research was a part of the CRC project titled 'Life Cycle Management of Railway Bridges'. Efficient usage of resources and enhancing the safety and serviceability of railway bridges are the significant outcomes of using the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a research project aimed at examining the capabilities and challenges of two distinct but not mutually exclusive approaches to in-service bridge assessment: visual inspection and installed monitoring systems. In this study, the intended functionality of both approaches was evaluated on its ability to identify potential structural damage and to provide decision-making support. Inspection and monitoring are compared in terms of their functional performance, cost, and barriers (real and perceived) to implementation. Both methods have strengths and weaknesses across the metrics analyzed, and it is likely that a hybrid evaluation technique that adopts both approaches will optimize efficiency of condition assessment and ultimately lead to better decision making.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is an exploratory study to scrutinise Project Knowledge Management in Project-Based Organisations, specifically in the Project Management Office (PMO). It is the first attempt to investigate the maturity of Project Management, from a Knowledge Management perspective. The findings of this study address multiple Knowledge Management processes and practices to both assess the level of Knowledge Management Maturity in PMOs, and improve the capability of Project Knowledge Management in Project-based Organisations. This research significantly contributes to bridge the current gap in the existing Project Management Maturity Models.