326 resultados para Available transfer capacity


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: The Functional Capacity Index (FCI) was designed to predict physical function 12 months after injury. We report a validation study of the FCI. Methods: This was a consecutive case series registered in the Queensland Trauma Registry who consented to the prospective 12-month telephone-administered follow-up study. FCI scores measured at 12 months were compared with those originally predicted. Results: Complete Abbreviated Injury Scale score information was available for 617 individuals, of whom 587 (95%) could be assigned at least one FCI score (range, 1-17). Agreement between the largest predicted FCI and observed FCI score was poor ([kappa] = 0.05; 95% confidence interval, 0.00-0.10) and explained only 1% of the variability in observed FCI. Using an encompassing model that included all FCI assignments, agreement remained poor ([kappa] = 0.05; 95% confidence interval, -0.02-0.12), and the model explained only 9% of the variability in observed FCI. Conclusion: The predicted functional capacity poorly agrees with actual functional outcomes. Further research should consider including other (noninjury) explanatory factors in predicting FCI at 12 months.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Development of tissue-engineered constructs for skeletal regeneration of large critical-sized defects requires the identification of a sustained mineralizing cell source and careful optimization of scaffold architecture and surface properties. We have recently reported that Runx2-genetically engineered primary dermal fibroblasts express a mineralizing phenotype in monolayer culture, highlighting their potential as an autologous osteoblastic cell source which can be easily obtained in large quantities. The objective of the present study was to evaluate the osteogenic potential of Runx2-expressing fibroblasts when cultured in vitro on three commercially available scaffolds with divergent properties: fused deposition-modeled polycaprolactone (PCL), gas-foamed polylactide-co-glycolide (PLGA), and fibrous collagen disks. We demonstrate that the mineralization capacity of Runx2-engineered fibroblasts is scaffold dependent, with collagen foams exhibiting ten-fold higher mineral volume compared to PCL and PLGA matrices. Constructs were differentially colonized by genetically modified fibroblasts, but scaffold-directed changes in DNA content did not correlate with trends in mineral deposition. Sustained expression of Runx2 upregulated osteoblastic gene expression relative to unmodified control cells, and the magnitude of this expression was modulated by scaffold properties. Histological analyses revealed that matrix mineralization co-localized with cellular distribution, which was confined to the periphery of fibrous collagen and PLGA sponges and around the circumference of PCL microfilaments. Finally, FTIR spectroscopy verified that mineral deposits within all Runx2-engineered scaffolds displayed the chemical signature characteristic of carbonate-containing, poorly crystalline hydroxyapatite. These results highlight the important effect of scaffold properties on the capacity of Runx2-expressing primary dermal fibroblasts to differentiate into a mineralizing osteoblastic phenotype for bone tissue engineering applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The structure of the pseudo-merohedrally twinned crystal of the 1:1 proton-transfer compound of 5-sulfosalicylic acid (3-carboxy-4-hydroxybenzenesulfonic acid) with 4-aminopyridine: 4-aminopyridinium 3-carboxy-4-hydroxybenzenesulfonate sesquihydrate has been determined at 180 K and the hydrogen-bonding pattern is described. Crystals of the compound are monoclinic with space group P21/c, with unit cell dimensions a = 35.2589(8), b = 7.1948(1), c = 24.5851(5) Å, β = 110.373(2)o, and Z = 16. The monoclinic asymmetric unit comprises four cation-anion pairs and six water molecules of solvation with only the pyridinium cations having pseudo-symmetry as a result of inter-cation aromatic ring π-π stacking effects. Extensive hydrogen bonding gives a three-dimensional framework structure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Grafting of autologous hyaline cartilage and bone for articular cartilage repair is a well-accepted technique. Although encouraging midterm clinical results have been reported, no information on the mechanical competence of the transplanted joint surface is available. HYPOTHESIS: The mechanical competence of osteochondral autografts is maintained after transplantation. STUDY DESIGN: Controlled laboratory study. METHODS: Osteochondral defects were filled with autografts (7.45 mm in diameter) in one femoral condyle in 12 mature sheep. The ipsilateral femoral condyle served as the donor site, and the resulting defect (8.3 mm in diameter) was left empty. The repair response was examined after 3 and 6 months with mechanical and histologic assessment and histomorphometric techniques. RESULTS: Good surface congruity and plug placement was achieved. The Young modulus of the grafted cartilage significantly dropped to 57.5% of healthy tissue after 3 months (P < .05) but then recovered to 82.2% after 6 months. The aggregate and dynamic moduli behaved similarly. The graft edges showed fibrillation and, in some cases (4 of 6), hypercellularity and chondrocyte clustering. Subchondral bone sclerosis was observed in 8 of 12 cases, and the amount of mineralized bone in the graft area increased from 40% to 61%. CONCLUSIONS: The mechanical quality of transplanted cartilage varies considerably over a short period of time, potentially reflecting both degenerative and regenerative processes, while histologically signs of both cartilage and bone degeneration occur. CLINICAL RELEVANCE: Both the mechanically degenerative and restorative processes illustrate the complex progression of regeneration after osteochondral transplantation. The histologic evidence raises doubts as to the long-term durability of the osteochondral repair.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Infrastructure capacity management is the process of ensuring optimal provision of infrastructure assets to support business operations. Effectiveness in this process will enable infrastructure asset owners and its stakeholders to receive full value on their investment. Management research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With competing needs for limited organisation resources, the challenge for infrastructure organisations is to identify and invest their limited resources to develop the right capabilities in the management of their infrastructure capacity. Using a multiple case study approach, the challenges faced in the management of infrastructure asset capacity and the approaches that can be adopted to overcome these challenges were explored. Conceptualising the approaches adopted by the case participants, the findings suggest that infrastructure organisations must strengthen their stakeholder connectivity capability in order to effectively manage the capacity of their infrastructure assets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing project-based learning is becoming an increasingly important part of project management. This article presents a comparative case study of 12 cases of knowledge transfer between temporary inter-organizational projects and permanent parent organizations. Our set-theoretic analysis of these data yields two major findings. First, a high level of absorptive capacity of the project owner is a necessary condition for successful project knowledge transfer, which implies that the responsibility for knowledge transfer seems to in the first place lie with the project parent organization, not with the project manager. Second, none of the factors are sufficient by themselves. This implies that successful project knowledge transfer is a complex process always involving configurations of multiple factors. We link these implications with the view of projects as complex temporary organizational forms in which successful project managers need to cope with complexity by simultaneously paying attention to both relational and organizational processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The crystal structures of the proton-transfer compounds of 3,5-dinitrosalicylic acid (DNSA) with a series of aniline-type Lewis bases [aniline, 2-hydroxyaniline, 2-methoxyaniline, 3-methoxyaniline, 4-fluoroaniline, 4-chloroaniline and 2-aminoaniline] have been determined and their hydrogen-bonding systems analysed. All are anhydrous 1:1 salts: [(C6H8N)+(C7H3N2O7)-], (1), [(C6H8NO)+(C7H3N2O7)-], (2), [(C7H10NO)+(C7H3N2O7)-], (3), [(C7H10NO)+(C7H3N2O7)-], (4), [(C6H7FN)+(C7H3N2O7)-], (5), [(C6H7ClN)+(C7H3N2O7)-], (6), and [(C6H9N2)+(C7H3N2O7)-], (7) respectively. Crystals of 1 and 6 are triclinic, space group P-1 while the remainder are monoclinic with space group either P21/n (2, 4, 5 and 7) or P21 (3). Unit cell dimensions and contents are: for 1, a = 7.2027(17), b = 7.5699(17), c = 12.9615(16) Å, α = 84.464(14), β = 86.387(15), γ = 75.580(14)o, Z = 2; for 2, a = 7.407(3), b = 6.987(3), c = 27.653(11) Å, β = 94.906(7)o, Z = 4; for 3, a = 8.2816(18), b = 23.151(6), c = 3.9338(10), β = 95.255(19)o, Z = 2; for 4, a = 11.209(2), b = 8.7858(19), c = 15.171(3) Å, β = 93.717(4)o, Z = 4; for 5, a = 26.377(3), b = 10.1602(12), c = 5.1384(10) Å, β = 91.996(13)o, Z = 4; for 6, a = 11.217(3), b = 14.156(5), c = 4.860(3) Å, α = 99.10(4), β = 96.99(4), γ = 76.35(2)o, Z = 2; for 7, a = 12.830(4), b = 8.145(3), c = 14.302(4) Å, β = 102.631(6)o, Z = 4. In all compounds at least one primary linear intermolecular N+-H…O(carboxyl) hydrogen-bonding interaction is present which, together with secondary hydrogen bonding results in the formation of mostly two-dimensional network structures, exceptions being with compounds 4 and 5 (one-dimensional) and compound 6 (three-dimensional). In only two cases [compounds 1 and 4], are weak cation-anion or cation-cation π-π interactions found while weak aromatic C-H…O interactions are insignificant. The study shows that all compounds fit the previously formulated classification scheme for primary and secondary interactive modes for proton-transfer compounds of 3,5-dinitrosalicylic acid but there are some unusual variants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The structures of two hydrated proton-transfer compounds of 4-piperidinecarboxamide (isonipecotamide) with the isomeric heteroaromatic carboxylic acids indole-2-carboxylic acid and indole-3-carboxylic acid, namely 4-carbamoylpiperidinium indole-2-carboxylate dihydrate (1) and 4-carbamoylpiperidinium indole-3-carboxylate hemihydrate (2) have been determined at 200 K. Crystals of both 1 and 2 are monoclinic, space groups P21/c and P2/c respectively with Z = 4 in cells having dimensions a = 10.6811(4), b = 12.2017(4), c = 12.5456(5) Å, β = 96.000(4)o (1) and a = 15.5140(4), b = 10.2908(3), c = 9.7047(3) Å, β = 97.060(3)o (2). Hydrogen-bonding in 1 involves a primary cyclic interaction involving complementary cation amide N-H…O(carboxyl) anion and anion hetero N-H…O(amide) cation hydrogen bonds [graph set R22(9)]. Secondary associations involving also the water molecules of solvation give a two-dimensional network structure which includes weak water O-H…π interactions. In the three-dimensional hydrogen-bonded structure of 2, there are classic centrosymmetric cyclic head-to-head hydrogen-bonded amide-amide interactions [graph set R22(8)] as well as lateral cyclic amide-O linked amide-amide extensions [graph set R24(8)]. The anions and the water molecule, which lies on a twofold rotation axis, are involved in secondary extensions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Innovation processes are rarely smooth and disruptions often occur at transition points were one knowledge domain passes the technology on to another domain. At these transition points communication is a key component in assisting the smooth hand over of technologies. However for smooth transitions to occur we argue that appropriate structures have to be in place and boundary spanning activities need to be facilitated. This paper presents three case studies of innovation processes and the findings support the view that structures and boundary spanning are essential for smooth transitions. We have explained the need to pass primary responsibility between agents to successfully bring an innovation to market. We have also shown the need to combine knowledge through effective communication so that absorptive capacity is built in process throughout the organisation rather than in one or two key individuals.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The LiteSteel Beam (LSB) is a new cold-formed hollow flange channel section developed by OneSteel Australian Tube Mills using their patented dual electric resistance welding and automated continuous roll-forming process. It has a unique geometry consisting of torsionally rigid rectangular hollow flanges and a relatively slender web. In addition to this unique geometry, the LSB sections also have unique characteristics relating to their stress-strain curves, residual stresses, initial geometric imperfections and hollow flanges that are not encountered in conventional hot-rolled and cold-formed steel channel sections. An experimental study including 20 section moment capacity tests was therefore conducted to investigate the behaviour and strength of LSB flexural members. The presence of inelastic reserve bending capacity in these beams was investigated in detail although the current design rules generally limit the section moment capacities of cold-formed steel members to their first yield moments. The ultimate moment capacities from the tests were compared with the section moment capacities predicted by the current cold-formed and hot-rolled steel design standards. It was found that compact and non-compact LSB sections have greater moment capacities than their first yield moments. The current cold-formed steel design standards were found to be conservative in predicting the section moment capacities of compact and non-compact LSB sections while the hot-rolled steel design standards were able to better predict them. This paper has shown that suitable modifications are needed to the current design rules to allow the inclusion of available inelastic bending capacities of LSBs in design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australian manufacturers recently developed a new mono-symmetric cold-formed steel hollow flange channel section known as LiteSteel Beam. The innovative LSB sections with rectangular flanges are currently being used as floor joists and bearers in buildings. In order to assess their behaviour and section moment capacity including the presence of any inelastic reserve bending capacity, 20 section moment capacity tests were conducted in this study. Test results were compared with the section moment capacities predicted by the steel design codes. Although the current cold-formed steel design rules generally limit the section moment capacities to their first yield moments, test results showed that inelastic reserve bending capacity was present in the compact and non-compact LSB sections. The results have shown that suitable modifications to the current design rules are needed to allow the inclusion of available inelastic bending capacities of LSBs in design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent studies suggest that meta-evaluation can be valuable in developing new approaches to evaluation, building evaluation capacities, and enhancing organizational learning. These new extensions of the concept of meta-evaluation are significant, given the growing emphasis on improving the quality and effectiveness of evaluation practices in the South Asian region. Following a review of the literature, this paper presents a case study of the use of concurrent meta-evaluation in the four-year project Assessing Communication for Social Change which developed and trialled a participatory impact assessment methodology in collaboration with a development communication Non-government organization (NGO) in Nepal. Key objectives of the meta-evaluation included to: continuously develop, adapt and improve the impact assessment methodology, Monitoring and Evaluation (M&E) systems and process and other project activities; identify impacts of the project; and build capacities in critical reflection and review. Our analysis indicates that this meta-evaluation was essential to understanding various constraints related to the organizational context that affected the success of the project and the development of improved M&E systems and capacities within the NGO. We identified several limitations of our meta-evaluation methods, which were balanced by the strengths of other methods. Our case study suggests that as well as assessing the quality, credibility and value of evaluation practices, meta-evaluations need to focus on important contextual issues that can have significant impacts on the outcomes of participatory evaluation projects. They include hierarchical organizational cultures, communication barriers, power/knowledge relations, and the time and resources available. Meta-evaluations also need to consider wider issues such as the sustainability of evaluation systems and approaches.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background--Pulmonary diffusing capacity for carbon monoxide (Dlco), alveolar capillary membrane diffusing capacity (Dm), and pulmonary capillary blood volume (Vc) are all significantly reduced after exercise. Objective--To investigate whether measurement position affects this impaired gas transfer. Methods--Before and one, two, and four hours after incremental cycle ergometer exercise to fatigue, single breath Dlco, Dm, and Vc measurements were obtained in 10 healthy men in a randomly assigned supine and upright seated position. Results--After exercise, Dlco, Dm, and Vc were significantly depressed compared with baseline in both positions. The supine position produced significantly higher values over time for Dlco (5.22 (0.13) v 4.66 (0.15) ml/min/mm Hg/l, p = 0.022) and Dm (6.78 (0.19) v 6.03 (0.19) ml/min/mm Hg/l, p = 0.016), but there was no significant position effect for Vc. There was a similar pattern of change over time for Dlco, Dm, and Vc in the two positions. Conclusions--The change in Dlco after exercise appears to be primarily due to a decrease in Vc. Although the mechanism for the reduction in Vc cannot be determined from these data, passive relocation of blood to the periphery as the result of gravity can be discounted, suggesting that active vasoconstriction of the pulmonary vasculature and/or peripheral vasodilatation is occurring after exercise.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Globalization stimulated demand for transnational higher education. However, little is known about how transnational programs can facilitate knowledge transfer between the partner universities—something that is often implied in the partnership arrangement. For the purpose of this paper transnational programs will be limited to dual degree programs between Indonesian and Australian universities, which, in recent years have been rising. Nevertheless, the discussion and synthesis may have value to other transnational programs. Situating the knowledge transfer in the wider context of globalization of higher education and the current reforms in Indonesian education, the paper acknowledges the tension between the need to generate revenue and the ideals of facilitating knowledge transfer and capacity development for Indonesian universities. Drawing on a detailed review of research findings in the business and education sector literature, this paper presents a conceptual framework that may be used to analyze knowledge transfer between Indonesian and Australian universities. Such investigations delineate the significant drivers underlying transnational programs for supporting knowledge transfer. The proposed framework incorporates the types of knowledge, knowledge transfer mechanisms, and the processes. It also considers how the inter-university antecedents may affect the potential for knowledge transfer between the universities. A discussion of how the framework may be used to implemented knowledge transfer concludes this paper.