515 resultados para Construction management


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose---The aim of this study is to identify complexity measures for building projects in the People’s Republic of China (PRC). Design/Methodology/Approach---A three-round of Delphi questionnaire survey was conducted to identify the key parameters that measure the degree of project complexity. A complexity index (CI) was developed based on the identified measures and their relative importance. Findings---Six key measures of project complexity have been identified, which include, namely (1) building structure & function; (2) construction method; (3) the urgency of the project schedule; (4) project size/scale; (5) geological condition; and (6) neighboring environment. Practical implications---These complexity measures help stakeholders assess degrees of project complexity and better manage the potential risks that might be induced to different levels of project complexity. Originality/Value---The findings provide insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Climate change, resource depletion and increasing urbanization are converging global issues that are challenging the way we design, construct and operate buildings. The housing sector is a significant contributor to these global issues through consumption of limited resources, waste generation and disposal (solid, liquid and atmospheric waste) and negative human health impacts (Senick 2006). Although the design and construction of ‘sustainable housing’ would appear to be an obvious and technically feasible solution, there remains multi-faceted issues affecting the delivery of sustainable housing (Holloway and Bunker 2006). Two fundamental issues - what makes a house sustainable, and to what extent regulation should be used to deliver sustainability - have been, and continue to be, debated at multiple levels in society. Despite personal, professional and political views on these issues, three key characteristics of the whole housing supply chain require fundamental change if we are to successfully address sustainability challenges (Birkeland 2008). These include: fragmentation; established methods, practices and processes, and the relationships between players. A more in-depth understanding of the role of ethics (values, beliefs and standards) and potential ethical conflicts within the supply chain will assist in better defining the nature of the fundamental changes required...

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Safety psychology and workplace safety Commitment, Motivational and attitudinal components of safety Leadership Group Dynamics and Group Change Case Study from Construction

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This summary is based on an international review of leading peer reviewed journals, in both technical and management fields. It draws on highly cited articles published between 2000 and 2009 to investigate the research question, "What are the diffusion determinants for passive building technologies in Australia?". Using a conceptual framework drawn from the innovation systems literature, this paper synthesises and interprets the literature to map the current state of passive building technologies in Australia and to analyse the drivers for, and obstacles to, their optimal diffusion. The paper concludes that the government has a key role to play through its influence over the specification of building codes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Global warming can have a significant impact on building energy performance and indoor thermal environment, as well as the health and productivity of people living and working inside them. Through the building simulation technique, this paper investigates the adaptation potential of different selections of building physical properties to increased outdoor temperature in Australia. It is found that overall, an office building with lower insulation level, smaller window to wall ratio and/or a glass type with lower shading coefficient, and lower internal load density will have the effect of lowering building cooling load and total energy use, and therefore have a better potential to adapt to the warming external climate. Compared with clear glass, it is shown that the use of reflective glass for the sample building with WWR being 0.5 reduces the building cooling load by more than 12%. A lower internal load can also have a significant impact on the reduction of building cooling load, as well as the building energy use. Through the comparison of results between current and future weather scenarios, it is found that the patterns found in the current weather scenario also exist in the future weather scenarios, but to a smaller extent.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As global warming entails new conditions for the built environment, the thermal behavior of existing buildings, which were designed based on current weather data, may become unclear and remain a great concern. Through building computer simulation, this paper investigates the sensitivity of different office building zoning to the potential global warming. From the sample office building examined, it is found that compared with the middle and top floors, the ground floor for most cities appears to be most sensitive to the effect of global warming and has the highest tendency to having the overheating problem. From the analysis of the responses of different zone orientations to the outdoor air temperature increase, it is also found that there are widely different responses between different zone orientations, with South or Core zone being most sensitive. With an increased external air temperature, the difference between different floors or different zone orientations will become more significant.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose: The construction industry is well known for its high accident rate and many practitioners consider a preventative approach to be the most important means of bringing about improvements. This paper addresses previous research and the weaknesses of existing preventative approaches and a new application is described and illustrated involving the use of a multi-dimensional simulation tool - Construction Virtual Prototyping (CVP). Methodology: A literature review was conducted to investigate previous studies of hazard identification and safety management and to develop the new approach. Due to weaknesses in current practice, the research study explored the use of computer simulation techniques to create virtual environments where users can explore and identify construction hazards. Specifically, virtual prototyping technology was deployed to develop typical construction scenarios in which unsafe or hazardous incidents occur. In a case study, the users’ performance was evaluated their responses to incidents within the virtual environment and the effectiveness of the computer simulation system established though interviews with the safety project management team. Findings: The opinions and suggestions provided by the interviewees led to the initial conclusion that the simulation tool was useful in assisting the safety management team’s hazard identification process during the early design stage. Originality: The research introduces an innovative method to support the management teams’ reviews of construction site safety. The system utilises three-dimensional modelling and four-dimensional simulation of worker behaviour, a configuration that has previously not been employed in construction simulations. An illustration of the method’s use is also provided, together with a consideration of its strengths and weaknesses.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Construction is undoubtedly the most dangerous industry in Hong Kong, being responsible for 76 percent of all fatal accidents in industry in the region – around twenty times more than any other industry. In this paper, it is argued that while this rate can be largely reduced by improved production practices in isolation from the project’s physical design, there is some scope for the design team to contribute to site safety. A new safety assessment method, the Virtual Safety Assessment System (VSAS), is described which offers assistance. This involves individual construction workers being presented with 3D virtual risky scenarios of their project and a range of possible actions for selection. The method provides an analysis of results, including an assessment of the correctness or otherwise of the user’s selections, contributing to an iterative process of retraining and testing until a satisfactory level of knowledge and skill is achieved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Design-build (DB) is a generic form of construction procurement, and, rather than simply representing a single system, it has evolved in practice into a variety of forms, each of which is similar to, and yet different from each other. Although the importance of selecting an appropriate DB variant has been widely accepted, difficulties occur in practice due to the multiplicity of terms and concepts used. What is needed is some kind of taxonomy or framework within which the individual variants can be placed and their relative attributes identified and understood. Through a comprehensive literature review and content analysis, this paper establishes a systematic classification framework for DB variants based on their operational attributes. In addition to providing much needed support for decision-making, this classification framework provides client/owners with perspectives to understand and examine different categories of DB variants from an operational perspective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sustainability is an issue for everyone. For instance, the higher education sector is being asked to take an active part in creating a sustainable future, due to their moral responsibility, social obligation, and their own need to adapt to the changing higher education environment. By either signing declarations or making public statements, many universities are expressing their desire to become role models for enhancing sustainability. However, too often they have not delivered as much as they had intended. This is particularly evident in the lack of physical implementation of sustainable practices in the campus environment. Real projects such as green technologies on campus have the potential to rectify the problem in addition to improving building performance. Despite being relatively recent innovations, Green Roof and Living Wall have been widely recognized because of their substantial benefits, such as runoff water reduction, noise insulation, and the promotion of biodiversity. While they can be found in commercial and residential buildings, they only appear infrequently on campuses as universities have been very slow to implement sustainability innovations. There has been very little research examining the fundamental problems from the organizational perspective. To address this deficiency, the researchers designed and carried out 24 semi-structured interviews to investigate the general organizational environment of Australian universities with the intention to identify organizational obstacles to the delivery of Green Roof and Living Wall projects. This research revealed that the organizational environment of Australian universities still has a lot of room to be improved in order to accommodate sustainability practices. Some of the main organizational barriers to the adoption of sustainable innovations were identified including lack of awareness and knowledge, the absence of strong supportive leadership, a weak sustainability-rooted culture and several management challenges. This led to the development of a set of strategies to help optimize the organizational environment for the purpose of better decision making for Green Roof and Living Wall implementation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction phase of building projects is often a crucial influencing factor in success or failure of projects. Project managers are believed to play a significant role in firms’ success and competitiveness. Therefore, it is important for firms to better understand the demands of managing projects and the competencies that project managers require for more effective project delivery. In a survey of building project managers in the state of Queensland, Australia, it was found that management and information management system are the top ranking competencies required by effective project managers. Furthermore, a significant number of respondents identified the site manager, construction manager and client’s representative as the three individuals whose close and regular contacts with project managers have the greatest influence on the project managers’ performance. Based on these findings, an intra-project workgroups model is proposed to help project managers facilitate more effective management of people and information on building projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sustainability issues in built environment have attracted an increasingly level of attention from both the general public and the industry. As a result, a number of green building assessment tools have been developed such as the Leadership in Energy and Environmental Design (LEED) and the BRE Environmental Assessment Method (BREEAM), etc. This paper critically reviewed the assessment tools developed in Australian context, i.e. the Green Star rating tools developed by the Green Building Council of Australia. A particular focus is given to the recent developments of these assessment tools. The results showed that the office buildings take the biggest share of Green Star rated buildings. Similarly, sustainable building assessments seem to be more performance oriented which focuses on the operation stage of buildings. In addition, stakeholder engagement during the decision making process is encouraged. These findings provide useful references to the development of next generation of sustainable building assessment tools.